Question

Q5) (4 Marks) A wastewater treatment plant receives at an average 87% of water supply during dry weather conditions. Average,

0 0
Add a comment Improve this question Transcribed image text
Answer #1

this question, one should Before answering this question, one is know what is dry weather flow & what is wet weather flow . .given data 340 Lipid faclor 99% percopita Water demande population 17600 45,000 - Aug dry wolher flowe Population Arcopita de

Add a comment
Know the answer?
Add Answer to:
Q5) (4 Marks) A wastewater treatment plant receives at an average 87% of water supply during...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Due on September 25, 2018 I. A wastewater treatment plant received, at an average, 70% and...

    Due on September 25, 2018 I. A wastewater treatment plant received, at an average, 70% and 150% of water supply during dry and wet seasons, respectively. Average municipal water demand expected is 450 Lpcd and the population of the town is 200,000. Calculate the average and peak flow rate for the wastewater treatment plant for the dry and wet seasons, respectively

  • A wastewater treatment plant receives an average of 4.5 MGD of wastewater flow. Two rectangular primary...

    A wastewater treatment plant receives an average of 4.5 MGD of wastewater flow. Two rectangular primary clarifiers operating in parallel will treat the flow. If the overflow rate is 700 gpd/ft2 and the depth of the clarifier is 10 ft, Determine: a) the dimensions of each clarifier assuming L:W ratio = 5:1. b) the detention time of each clarifier (in days).

  • At Cookeville’s municipal wastewater treatment plant, influent methanol underwent biodegradation by autotrophic microorganisms during wastewater t...

    At Cookeville’s municipal wastewater treatment plant, influent methanol underwent biodegradation by autotrophic microorganisms during wastewater t please do a, b, and c thank you show all steps as well thanks so much Problem s municipal wastewater treatment plant, influe:t methanol At Cookcville' underwent biodegradation by autotrophic microorganisms during wastewater treatment process in a completely anacrobic rcactor to produce mcthane, carbon dioxid: and water as the effluent. (a) write a balanced biochemical reaction for the biochemical process (b) Draw a simple...

  • Situation: The town of Waterville has the following past population data projected beyond 1990 Year Population...

    Situation: The town of Waterville has the following past population data projected beyond 1990 Year Population 10,240 12,150 18,430 26210 22,480 32.410 45,050 57,200 64,030 77,320 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 The average water consumption (including every possible sector) is 160 gal/cap-day in 1998. The town has a wastewater treatment plant with a treatment capacity of 30 MGD. Due to the rapid growth of the population, the town is planning to build a new wastewater...

  • A wastewater treatment plant, which serves a population of 300,000 people, receives an average daily volume...

    A wastewater treatment plant, which serves a population of 300,000 people, receives an average daily volume of 24 million gallons per day (MGD) at an average influent 5-day biochemical oxygen demand concentration of 200 mgBODs/L and an average influent total suspended solids concentration of 220 mgTSS/L. The plant operates a primary sedimentation process that remove 65% of the incoming TSS and 35% of the incoming BOD %. This process is followed by a secondary treatment process before discharge to the...

  • Primary clarifier is to be designed for a municipal wastewater treatment plant with a flow of 416...

    primary clarifier is to be designed for a municipal wastewater treatment plant with a flow of 4160 m/d and peak flow during the day of 3.10 times the average hourly flow. Pertinent data are: peak overflow rate 73.3 m/d.-m2, maximum peak weir loading 373 m3/d-m, and minimum tank depth 2.13 m. Determine: A. The clarifier diameter B. The side water deptlh C. The peak weir loading. Is it acceptable? D. The percent suspended solids removal on the basis of the...

  • Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process...

    Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process for a water treatment plant for turbidity removal Design Maximum Day Flow-20,000 m2ld Two parallel sedimentation tank, each designed for half of the total flow Depth 4.5 m, Width 6 m, Surface Overflow Rate 50 m/day Chain and flight sludge collector will be used, hence the limiting width of 6 m. Minimum Hydraulic Retention Time (detention time) 2 hrs Maximum weir rate 250 m/day/m...

  • B. A water treatment plant is to process water to a population of 150000 The following data are f...

    b. A water treatment plant is to process water to a population of 150000 The following data are furnished to facilitate the design of the rapid sand filter units Average day demand 300 L/cap.d 24h Assume that the maximum day demand 1.5 times the average Number of filter units Rate of filtration: Length: Maximum lateral travel of washwater not to exceed 1 m Rate of backwash: Desirable sand bed expansion: 40% Washwater tank capacity: to wash two filters for 5...

  • Answer correctly with reasonn The design capacity of the main water supply pipeline to the distribution...

    Answer correctly with reasonn The design capacity of the main water supply pipeline to the distribution system is designed based on which of the followings? Select one: O a. Maximum daily demand O b. Maximum Hourly demand O c. Maximum minutely demand O d. Maximum Monthly demand e. Maximum Yearly demand A service reservoir is designed to store which quantity of flow? Select one: O a. Peak daily demand O b. Daily fire Demand O c Emergency requirements O d....

  • A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...

    A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by conventional activated sludge process composed of covered aeration tanks and secondary clarifiers. You are asked to calculate the different operation parameters to make sure that the system is operated within normal process ranges listed in the reference tables below. Table 5-20 Typical design information for primary sedimentation tanks U.S. customary units Item Unit Range Typical Primary sedimentation tanks followed by secondary treatment...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT