What are the steps required to define the tasks for a project? Why should we start with the milestones and then break it down into subtasks?
What are the steps required to define the tasks for a project? Why should we start...
1. Identify the three steps that the team should follow in order to define project scope and create a project scope statement. 2. describe the three steps that the team should follow in order to define project scope and create a project scope statement.
How are the tasks of the Project Manager and the tasks of the Instructional Designer related? How might the completion of these tasks complement each other or compete for finite resources? Who should define the priorities of the project? With these thoughts in mind, consider the following: Assume the role of the Project Manager. What do you see as the key priorities and important factors that should be considered during the initial phases of a project? How does the role...
As a project manager, would you manage the critical path tasks differently than non-critical tasks? Why, or why not? If yes, what would you do differently?
(5) Define random variable. Why should we care about random variables? How are they used/useful? (6) Define probability mass function (pmf). Why should we care about pmfs? How are they used/useful? (7) Define cumulative distribution function (cdf). Why should we care about edfs? How are the used/useful? (5) Define random variable. Why should we care about random variables? How are they used/useful? (6) Define probability mass function (pmf). Why should we care about pmfs? How are they used/useful? (7) Define...
The table below shows a number of tasks required for the successful completion of a project. Activity Days Immediate Predecessor(s) A 4 B 2 A C 5 A D 7 A E 2 B F 5 B,C G 6 D,E,F Draw the network diagram for this project highlighting Early Start, Early Finish, Late Start and Late Finish and slack. Please show your answer by using the format shown below. Table template: Activity A B C D E F G Early...
Why we use dq(rev) and not dq(irr) to define entropy? With temp randomness should increase, why ds=dq/T ?
HW12: Project Mgmt。 Saved Problem 15-4 Answer these questions for the following simple set of project tasks. Task times are shown in hours. Skipped eBook Print References a. What is the length of the critical path? 1hou Length of thecriticalpath「 b. What are the earliest start and latest start for E? points Earliest start th/nd hour Latest stat thind hour Sklpped eBook Print References c. What is the latest start for B? test stat th/nd hour d. If all other...
Assume that in a specific project, we tend to study the effect of hydrocarbon consumption, running, walking, biking, gender, and age on weight loss. Discuss about the scientific methods you would use to see the effect of these factors (hint: do you need to find mean, median, variance, etc.? why are they needed? How about IQR? Please include all the steps including hypothesis that you should check and how you should design your experiment. What are the outcomes? What are...
When we want to project onto a space we start with a basis of that space. Form a matrix A from the basis vectors. What is the shape of the matrix? What is the rank? How many free columns? What is the nullspace? Is A invertible?
Create a Work break down structure (WBS) for the following project case. The WBS should be organized by either “phase” or “project management process groups.” Break down the work to Level 3. The case description is simple. Thus, go beyond the case description and be creative to include additional detailed tasks. ---------------[Case] ----------------------- Project for building a new, state-of-the-art multimedia classroom for your organization within the next five months and the budget is $200,000. The classroom should include 40 high-end...