Question

10. A boiler system is being designed for a building expected to require heating for approximately 3,500 hours per year. The

0 0
Add a comment Improve this question Transcribed image text
Answer #1

son Por sching the question are have to look at the graph very casifully Given Data, Bunnel tye: LEX ?? un bu Heat content an> for 2500 has to 3500 hrs. (Pout <50kw) UpL = 80.7. & estimated from light graphi RE - Фрі 0.880.82 0-656 sos Annual boilerSO average (972), + (2.p.), + (npu) 3 efforening of - three boiles 0.82 7 0.82 +0.779 3 0.80633 or 80.633% Mu fy

Answer may slightly vary from person to person as these are the estimates . Please forgive me for any calculation mistake and do comment for any short of queries.

Add a comment
Know the answer?
Add Answer to:
10. A boiler system is being designed for a building expected to require heating for approximately...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 10. A boiler system is being designed for a building expected to require heating for approximately...

    10. A boiler system is being designed for a building expected to require heating for approximately 3,500 hours per year. The LDC is indicated below (left). The total annual heating load is about 280,000 kWh. The load will be met by three identical boilers, with each boiler having the following characteristics: Heating Fuel: natural gas (heat content may be estimated to be = 10.33 kWh/m?). • Burner Type: on/off • Rated Output = 100 kW • Rated Efficiency: NA= 82%...

  • Load Duration Curve A gas-fired boiler system is being design for a new building. The system...

    Load Duration Curve A gas-fired boiler system is being design for a new building. The system will consist of 3 identical boilers, each with rated output = 200 kW. The anticipated LDC is shown below. 600 500 Heating Load 400 [kW] 300 200 100 0 The planned operating sequence is as follows: Boiler-1 fires first to meet whatever load it can, up to its capacity. When Boiler-1 reaches its capacity, Boiler-2 fires second and operates to meet whatever load it...

  • Here is the energy analysis of the hydronic heating system depicted in the diagram. The boiler...

    Here is the energy analysis of the hydronic heating system depicted in the diagram. The boiler plant consists of two identical boilers, each having the following characteristics: • Fuel: natural gas • Burner Type: on/off • Rated Output = 85 kW • Rated Efficiency, nFL = 80% The boilers operate in a “Lead/Lag” arrangement, i.e., Boiler 1 operates first to meet the load (up to its capacity), and Boiler 2 operates as necessary to meet any remaining load. The pump...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT