Question

Load Duration Curve A gas-fired boiler system is being design for a new building. The system will consist of 3 identical boil

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Rated power output we have Soon Por solving the question obseque graph very carefully Given Dala, Number of boilers = N-3 P =So, boiler 3 operates operates for time, Tz=250 hrs in Potal onnual of lood of load o Boiles & load of + heating lood during(CV) 10:33 KWh/m² Heat content of natural gas boiles 3 Efficiency of 2) 0.7 Hearing load of boules of booles - (Qweed) (Qwed)3 3 minio 345773 m Annual foul Consumphon fre

Please forgive me for any calculation mistake and do comment for any short of queries.

Add a comment
Know the answer?
Add Answer to:
Load Duration Curve A gas-fired boiler system is being design for a new building. The system...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 10. A boiler system is being designed for a building expected to require heating for approximately...

    10. A boiler system is being designed for a building expected to require heating for approximately 3,500 hours per year. The LDC is indicated below (left). The total annual heating load is about 280,000 kWh. The load will be met by three identical boilers, with each boiler having the following characteristics: • Heating Fuel: natural gas (heat content may be estimated to be = 10.33 kWh/mº). • Burner Type: on/off • Rated Output = 100 kW Rated Efficiency: na= 82%...

  • 10. A boiler system is being designed for a building expected to require heating for approximately...

    10. A boiler system is being designed for a building expected to require heating for approximately 3,500 hours per year. The LDC is indicated below (left). The total annual heating load is about 280,000 kWh. The load will be met by three identical boilers, with each boiler having the following characteristics: Heating Fuel: natural gas (heat content may be estimated to be = 10.33 kWh/m?). • Burner Type: on/off • Rated Output = 100 kW • Rated Efficiency: NA= 82%...

  • Here is the energy analysis of the hydronic heating system depicted in the diagram. The boiler...

    Here is the energy analysis of the hydronic heating system depicted in the diagram. The boiler plant consists of two identical boilers, each having the following characteristics: • Fuel: natural gas • Burner Type: on/off • Rated Output = 85 kW • Rated Efficiency, nFL = 80% The boilers operate in a “Lead/Lag” arrangement, i.e., Boiler 1 operates first to meet the load (up to its capacity), and Boiler 2 operates as necessary to meet any remaining load. The pump...

  • Question 2 A vapour compression cycle acts as both a heat source (radiators and a hot...

    Question 2 A vapour compression cycle acts as both a heat source (radiators and a hot water load) and a cooling load (food preservation). The system requires an operating temperature of 50°C to support the bulk of the heating load and -10°C for the cooling load. a) Determine the operating pressures of the cycle in bar. Also, assuming we require a maximum temperature of 90°C to operate certain higher temperature heat processes (for hygiene related reasons), determine the enthalpy at...

  • 1. 1. The primary energy savings in tep (1 MWh -0.086 tep) and diesel, which involves the direct use of heat from a geothermal resource to cover a heat demand of 100 kW for 3,500 h / year, assum...

    1. 1. The primary energy savings in tep (1 MWh -0.086 tep) and diesel, which involves the direct use of heat from a geothermal resource to cover a heat demand of 100 kW for 3,500 h / year, assuming that this demand will be covered with diesel boiler of average yield 0.8 (for diesel 1.12 tep/ton gas oil), they are: a) 30.1 tep/year, 26.9 ton/year b) 37.6 tep/year, 33.6 ton/year c)41.2 tep/year, 36.8 ton /year 1. 2. A hydraulic pump...

  • EERİNG MILLIGAN Greg Harrell, Ph.D., P.E Director of Engineering Programs Emmanuel Building 1 Wal...

    Number 4 EERİNG MILLIGAN Greg Harrell, Ph.D., P.E Director of Engineering Programs Emmanuel Building 1 Walker Drive Johnson City, Tennessee 37601 Telephone: 865-719-0173 Email: [email protected] ENGINEERING Problem-03-Electrical Circuit-35 points The schematic below represents a battery powered circuit that contains a 12 Voo battery supply and two identical incandescent lightbulbs that are arranged in a series circuit. Dc 4 The lightbulbs are represented as Resistor 1 and 2, Each lightbulb has a maximum rating of 15 W The battery rating is...

  • INCORRECT In the case of a partial load rejection, the governor would throttle-in the main steam control valves. if the...

    INCORRECT In the case of a partial load rejection, the governor would throttle-in the main steam control valves. if there was no reheat intercept valve, there could be turbine "overspeed" because the steam pressure would suddenly 1se the steam flow would suddenly increase steam would continue to pass through the high pressure turbine CS tas canned with CamScanner uld 5s through ttie mtermediate and low pressure turbines INCORRECT In the pilot valve hydraulc control system, the pilot valve is returned...

  • A small coastal town in Queensland is subject to an increasing permanent population and also a...

    A small coastal town in Queensland is subject to an increasing permanent population and also a transient influx of tourists during the summer period. Council already receives frequent complaints of restricted water supply. The water supply system comprises a rising trunk main from the treatment plant A to the service reservoir B, the service reservoir, and service mains to the consumption areas. Two consumption areas C and D at different elevations are gravity supplied from the service reservoir. The service...

  • Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized...

    Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized oil field on Alaska’s north coast. The field is still producing at its maximum rate, 325,000 barrels of oil per day (BOPD). However, to sustain this rate the company started a waterflood of the reservoir two years ago. Now a capacity bottleneck in the water disposal process is threatening to curtail production. In waterflooding, salt water from the Beaufort Sea is treated to remove...

  • I have this case study to solve. i want to ask which type of case study...

    I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT