Question

Part 2 Based upon the results to part 1, the project requires hauling materials to, or from, the site. The following equipmen

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer:

Please rate Positive

Thank you

W* DATE: 1) No. of cycles to fill tood truch o 5-cy loader, 0.5 min cycle 4 gol fill capecity actual volume a 0.945cy 4.5 cyDATE: ii) a Total time to fill a truck= No. of trucks required 8x6.6 mins- 4.8 mins 3 trucks In both caser 3 trucks required,DATE: ii) for 7 cy bader for truckt Loader, & cast = $ 11088 for 2 bruck & Loader, cost : $ 0.83 for 3 truck & londer, cost .

Add a comment
Know the answer?
Add Answer to:
Part 2 Based upon the results to part 1, the project requires hauling materials to, or...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Part 2 Based upon the results to part 1, the project requires hauling materials to, or...

    Part 2 Based upon the results to part 1, the project requires hauling materials to, or from, the site. The following equipment is available for earthwork operations: - One 5-cy heaped capacity bucket loader; a 0.5 min cycle time; 90% fill capacity. - One 7-cy heaped capacity bucket loader; a 0.6 min cycle time; 90% fill capacity. 45.9-cy heaped capacity off-road trucks; a 0.5 min dump time; 100% fill capacity. - Loaded trucks travel through the following three sections: Haul...

  • Excavation and removal of earth has to be done in a road project. One excavator with...

    Excavation and removal of earth has to be done in a road project. One excavator with a 0.80 cy bucket and a bucket fill factor of 0.9, is used to cut the soil and load the trucks. A total of 5 trucks are being used for transportation of the soil. Each truck can transport 10 cy. The dump site is 30 miles away and the trucks travel at 40 mph, and have to travel 60 miles. The contractor is planning...

  • Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy...

    Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy Total till och Total cut beyl Adj fill (byl Sum (beyl Mass ordinate 1.23 056 2.37 1.20 2.36 3.07 3.60 3.77 3.09 3.01 4.65 Strip cut (boyil 0.04 1.04 097 3.22 2.08 2.33 2.51 1.85 161 1.74 0.88 109 35.70 5.58 18 3.12 2.03 6.77 2.01 2.53 0.82 1.08 1.20 1.92 1.59 1.82 3.95 3.25 2.74 150 7.42 556 80 End-area End area cut...

  • please help me , show all steps , please make your font clear.. Problem 1: A...

    please help me , show all steps , please make your font clear.. Problem 1: A project to move packed earth requires you to decide whether to use a dozer/scraper operation or excavator/truck operation. Determine the most economical operation based on the dozer/scraper operation estimated at S6.25/lcy All equipment carries a rated heaped capacity, has a fill factor of 105%, and works 45-min hours. Excavators costs $95/hr (including operator), cycle time is 0.28 min, and bucket heaped capacity is 3...

  • This problem consists of two parts. It is about earthwork activity on site. Part A: Sketch...

    This problem consists of two parts. It is about earthwork activity on site. Part A: Sketch a balance curve for a truck-hauling operation with two excavators operating in tandem at 175 cy/hr each and trucks operating at 42 cy/hr each. Show all your calculations. (10 points) Part B: Also, sketch the $/cy vs. trucks curve (plus/minus 2 trucks from the balanced number) if each excavator operates at $110/hr and each truck operates at $70/hr. For example, if you select 6...

  • Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem...

    Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...

  • please help me. Problem 2: Evaluate cost and production using a 3-cy hoe to load wet gravel (2980 lb/lcy) into 14 cy...

    please help me. Problem 2: Evaluate cost and production using a 3-cy hoe to load wet gravel (2980 lb/lcy) into 14 cy trucks. Assume a bucket fill factor of 105% and that the hoe bucket swing cycle time is 24 sec. the truck empty weight is 36860 lb, and a rated payload of 40000 lb. Dump time will be 1.3 min. the haul distance is 2.5 miles from the pit to the plant up a 3% grade. The rolling resistance...

  • (50) 7. Analyze the following operation. A 385C Excavator will be used to load material into a CAT 740 (no ejector) articulated truck. The excavator is equipped with a 6 cy heaped bucket and is...

    (50) 7. Analyze the following operation. A 385C Excavator will be used to load material into a CAT 740 (no ejector) articulated truck. The excavator is equipped with a 6 cy heaped bucket and is capable of cycling every 30 seconds. The material being loaded weighs 3,300 lbs cy. The job efficiency is 90%. The trucks will be hauling the nmaterial 4000 feet over a road with a total rolling resistance of 9% to the dumpsite and 10% total rolling...

  • Data Analysis Project Part 1 Custom Fabric Ventures is a small company that produces fabric-based wardrobe...

    Data Analysis Project Part 1Custom Fabric Ventures is a small company that produces fabric-based wardrobe accessories (such as, handbags, scarves, and headbands) and home accessories (such as placemats, pillows, and window treatments).   The company keeps a limited number of popular items in stock, but primarily produces custom orders. Customers are able to choose from a wide selection of styles, sizes, and fabrics for each type of product. Most of the company’s customers are small boutiques, home décor shops, and home-decorators...

  • En (2 points) You isolated your mitochondrial DNA in Part I. In step 6, you discard...

    En (2 points) You isolated your mitochondrial DNA in Part I. In step 6, you discard the supernatant, but keep the pellet. In step 15, you discard the pellet, but keep the supernatant. Explain why the pattern is different between the two steps and the consequence of mixing up these two steps. Procedure Part 1: mt DNA Isolation from your cheek cells. Lysis solution is used to breakdown the cells in this step, you will isolate MEONA from cheek cells....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT