1. A business process has a process-capability-ratio Cpk = 0.0. Does this process performance meet the 3-sigma quality control standard? If meet standard, please input number "1", if not, input number "2". Flag this Question Question 41 pts
2. A process fills baby formula into bottles with a target of 3 ounces ± 0.20 ounce. Two hundred bottles of baby formula from the process were sampled. The results showed the average amount of baby formula placed in the bottles to be 3.182 ounces. The standard deviation of the amounts was 0.07 ounce. Please determine the value of Cpk for the process. Numbers only. Keep 3-decimal if not exact, either round up or down is ok.
1) Question 41
Answer is 1.
Cpk is 0.0 when the process average equals either LSL or USL i,e it is at par the specification limit.
2) LSL = 3 - 0.2 = 2.8
USL = 3 + 0.2 = 3.2
3*Sigma = 3*0.07 = 0.21
Cpu = (USL - mean) / (3*Sigma) = (3.2 - 3.182) / 0.21
= 0.086
Cpl = (mean - LSL) / (3*sigma)
= (3.182 - 2.8) / 0.21
= 1.819
Cpk = min[Cpu,Cpl] = min[0.086, 1.819]
= 0.086
1. A business process has a process-capability-ratio Cpk = 0.0. Does this process performance meet the...
A process filling small bottles with baby formula has a target of 3.2 ouncesplus or minus0.270 ounce. Two hundred bottles from the process were sampled. The results showed the average amount of formula placed in the bottles to be 3.150 ounces. The standard deviation of the amounts was 0.072 ounce. Determine the value of Upper C Subscript pk. Roughly what proportion of bottles meet the specifications?
The specifications for the baby formula sold in small bottles are: 3.000 ounces 0.150 ounces. Your company has designed a production process to fill these small bottles with the baby formula. Two hundred bottles from this process were sampled to measure the amount of baby formula. The average amount of baby formula, calculated from this sample, turned out to be 3.042 ounces (this would imply that the process average = 3.042 ounces). The standard deviation of the amounts was...
please answer number 24 part A and for part B answer it in equation form, not graph. thank you. Process Capability Sample 24. The production manager at Sunny Soda, Inc. is inter- ested in tracking the quality of the company's 12-ounce bottle filling line. The bottles must be filled within the tolerances set for this product because the dietary information on the label shows 12 ounces as the serving size. The design standard for the product calls for a fill...