(Yoggo Soft Drink) A small, privately owned Asian company is producing a private-label soft drink, Yoggo. A machine-paced line puts the soft drinks into plastic bottles and then packages the bottles into boxes holding 10 bottles each. The machine-paced line is com-prised of the following four steps: (1) the bottling machine takes 1 second to fill a bottle, (2) the lid machine takes 3 seconds to cover the bottle with a lid, (3) a labeling machine takes 5 seconds to apply a label to a bottle, and (4) the packaging machine takes 4 seconds to place a bottle into a box. When a box has been filled with 10 bottles, a worker tending the packaging machine removes the filled box and replaces it with an empty box. Assume that the time for the worker to remove a filled box and replace it with an empty box is neg-ligible and hence does not affect the capacity of the line. At step 3 there are two labeling machines that each process alternating bottles; that is, the first machine processes bottles 1, 3, 5, . . . and the second machine processes bottles 2, 4, 6, . . . . Problem data are sum-marized in the table following.
a. What is the process capacity (bottles/hour) for the machine-paced line?
b. What is the bottleneck in the process?
c. If one more identical labeling machine is added to the process, how much is the increase in the process capacity going to be (in terms of bottles/hour)?
d. What is the implied utilization of the packaging machine if the demand rate is 60 boxes/ hour? Recall that a box consists of 10 bottles.
Process Step | No. of machines (n) | Seconds per bottle (p) | Capacity (bottles per hour) = 3600*n/p |
Bottling | 1 | 1 | 3600 |
Applying a lid | 1 | 3 | 1200 |
Labeling | 2 | 5 | 1440 |
Packaging | 1 | 4 | 900 |
(a)
Process capacity = Min(3600, 1200, 1440, 900) = 900 bottles per hr.
(b)
The bottleneck is packaging with the least capacity
(c)
The capacity will not increase because the labeling machine is not the bottleneck.
(d)
Implied utilization = Demand / Capacity = (60*10) bottles per hr. / 900 bottles per hr. = 66.67%
(Yoggo Soft Drink) A small, privately owned Asian company is producing a private-label soft drink, Yoggo....
Fresh out of school, you take a job with a small injection-molding shop with two machines (25 ton and 250 ton. On any given shift, there are two workers assigned to each machine one is concerned with setting/loading and unloading while the other packages the final product for shipping. You have been asked to investigate whether you can improve the process, potentially with automation. Having recently re-read The Goal, you are quite aware that adding robots does not necessarily mean...
(5 points)A bottling plant wants to control the amount of soft drink it puts in each can. They decide to periodically sample batches of cans to measure the average amount of soft drink put in each can, and track that data over time to see if the filling process is behaving the way they would expect. Identify which type of quality tool would be appropriate to use, and briefly explain why you think that tool is the best choice. (If...
Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (50 sec.): The plastic tube for the frame is cut to size. Step 2 (40 sec.): The tube is put together. Step 3 (55 sec.): The frame...
SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the company's new line of single-serve coffee pods or to await results from the product's launch in the United States. Key strategic decisions include choosing the target market to focus on and determining the value proposition to emphasize. Important questions are also raised in regard to how the new product should be branded, the flavors to offer, whether Kraft should use traditional distribution channels or...