A building contractor is to dig a foundation 48 inches long, 9 feet wide, and 2 yards deep for a toll booth. Find the volume of the block the contractor has to build in cubic feet.
A building contractor is to dig a foundation 48 inches long, 9 feet wide, and 2...
A building contractor is to dig a foundation 12 feet long. 9 feet wide, and 6 feet deep for a toll booth The contractor pays $20 per load for trucks to remove the dirt. Each truck holds 6 cubic yards. What the cost to the contractor to have all the dirt hauled away? Show your work.
My back yard is 50.0 feet wide x 60.0 feet long. I dig up my entire back yard to a depth of 8 inches. What volume of water (cm3) would be required to fill the hole?
My back yard is 50.0 feet wide x 60.0 feet long. I dig up my entire back yard to a depth of 8 inches. What mass of water (in grams) would be required to fill the hole?
A pool is 9 feet wide by 15 feet long and is uniformly 6 feet deep. suppose there are 3 feet of water in the pool. (density of water is 65 lb/ft^3). what would be the work required to move a 20 lb rock from the bottom of the pool to the top.
work step by step!
FINAL EXAM Problem 9: A tank full of water with dimension 20 feet long, 10 feet wide, and 6 feet deep is situated right below the floor of a house. Water from this tank is use through a faucet (outlet) 3 feet above the ground that half of the water is used up in the morning and half is used up in the evening by midnight. Find the work done by the water pump by midnight...
| A shed is shown below. It is 10 feet wide and 20 feet long and has a slanted flat roof (i.e., a plane roof) that is 12 feet high at one corner and 10 feet high at the two corners next to that one. (a) [5] Three corners of the roof are given by the points (0, 0, 12), (10, 0, 10), and (0, 20, 10). 12 Find the vector vų from (0, 0, 12) to (10, 0, 10)...
A shed is shown below. It is 10 feet wide and 20 feet long and has a slanted flat roof (i.e., a plane roof) that is 12 feet high at one corner and 10 feet high at the two corners next to that one. Z (a) [5] Three corners of the roof are given by the points (0, 0, 12), (10, 0, 10), and (0, 20, 10). 12 Find the vector vị from (0, 0, 12) to (10, 0, 10)...
9. a. A spring has constant k-5lb./in. Its natural length is 12 inches. What is the work required to compress it to 9 inches? b. A 100 ft. cable weighs 40 lbs. Find the work done in winding the cable onto a winch, if the cable is hanging vertically c. An unknown positive charge q is placed at the origin. The force F (in Newtons) with which this charge repels a unit positive charge is given by F-kq/r, where k...
2 Messages Courses Help Logout Main And the Rain Came Tumbling Down Due in 14 hours, 55 minutes The cubit is an ancient unit. Its length equals sx paims. (A palm varies from 2.5 to 3.5 inches depending on the individual.) We are told Noah's ark wes 300 cubits long, 50 cubits wide, and 30 cubits high. Estimate the volume of the ark (in cubic feet). Assume the ark has a shoe-box shape and that 3 palm-3.10 inch. Tries 1/10...
12. A slab on grade measures 120 long x 60" wide x 2' 6" thick. What is the cost to form the slab if formwork costs S1 per square foot of contact area? A. $72 B.S90 C.S162 D.S180 13. A place concrete' activity requires the placement of 2,080 cubic yards. If the individual production rate is 2 cubic yards per workhour per person, with a 10-person crew and 8-hour workday, how many days are needed to complete this activity? A....