Activity | Estimated Cost A | Estimated Activity B | Activity Rate (A/B) | |
Machining | 200,000 | 10,000 | 20 | |
Machine Setup | 100,000 | 200 | 500 | |
Production Design | 84,000 | 2 | 42,000 | |
Genral Factory | 300,000 | 12,000 | 25 | |
Total Estimated Cost | 684,000 | |||
A | Product Y | Activity- (A) | Activity Rate-(B) | Cost (A*B) |
Machining | 8,000 | 20 | 160,000 | |
Machine Setup | 40 | 500 | 20,000 | |
Production Design | 1 | 42,000 | 42,000 | |
Genral Factory | 9,000 | 25 | 225,000 | |
Manufacturung Overhead Cost | 447,000 | |||
B | Product Z | Activity- (A) | Activity Rate-(B) | Cost (A*B) |
Machining | 2,000 | 20 | 40,000 | |
Machine Setup | 160 | 500 | 80,000 | |
Production Design | 1 | 42,000 | 42,000 | |
Genral Factory | 3,000 | 25 | 75,000 | |
Manufacturung Overhead Cost | 237,000 | |||
C | Plant Wide | Amount | ||
Estimated Overhead Cost | 684,000 | |||
Estimade Direct Labour Hours (3000+9000) | 12,000 | |||
Predetermined Ohs (684000/12000) | 57 | |||
Product y | Product Z | Total | ||
Direct Labours Hrs | 9,000 | 3,000 | 12,000 | |
Predetermined Ohs | 57 | 57 | ||
Manufacturing Ohs assigned (9000*57,3000*57) | 513,000 | 171,000 | 684,000 | |
% of allocation | 75% | 25% | 100% | |
D | Machine Cost | Product y | Product Z | Total |
Machine Cost | 160,000.00 | 40,000.00 | 200,000.00 | |
% of allocation | 80% | 20% | 100% | |
E | Machine Design | Product y | Product Z | Total |
Machine Design Cost | 20,000.00 | 80,000.00 | 100,000.00 | |
% of allocation | 20% | 80% | 100% | |
F | Prodcut Design | Product y | Product Z | Total |
Prodcut Design Cost | 42,000.00 | 42,000.00 | 84,000.00 | |
% of allocation | 50% | 50% | 100% |
A. using the abc system, how much total manufacturing overhead cost would be assigned to product...
Using the ABC system, how much total manufacturing overhead cost
would be assigned to Product Z? (Round your intermediate
calculations to 2 decimal places. Round your answers to the nearest
dollar amount.)
Using the plantwide overhead rate, what percentage of the total
overhead cost is allocated to Product Y and Product Z?
(Round your intermediate calculations to 2 decimal
places. Round your answers to 2 decimal
places.)
Using the ABC system, what percentage of the Machining costs is
assigned to...
Using the ABC system, how much total manufacturing overhead
cost would be assigned to Product Y?
Using the ABC system, how much total manufacturing overhead
cost would be assigned to Product Z?
Using the plantwide overhead rate, what percentage of the total
overhead cost is allocated to Product Y and Product Z?
Using the ABC system, what percentage of the Machining costs is
assigned to Product Y and Product Z?
Using the ABC system, what percentage of Machine Setups cost...
1.using the ABC system, how much total manufacturing overhead cost
would ge assigbed to product Y (Round your immediate calculations
and final answers to 2 decimal places. Round your answers to the
nearest dollar amonut)
2. using the ABC system, how much total manufacturing overhead
cost would ge assigbed to product Z (Round your immediate
calculations and final answers to 2 decimal places. Round your
answers to the nearest dollar amount)
3. Using the Plantwide overhead rate, what PERCENTAGE of...
12. Using the ABC system, what
percentage of the Machining costs is assigned to Product Y and
Product Z? (Round your intermediate calculations to 2
decimal places. Round your answers to 2 decimal
places.)
13. Using the ABC system, what percentage of Machine Setups cost
is assigned to Product Y and Product Z? (Round your
intermediate calculations to 2 decimal places. Round your answers
to 2 decimal places.)
14. Using the ABC system, what percentage of the Product Design
cost...
What is the company’s plantwide overhead rate?
Using the plantwide overhead rate, how much manufacturing
overhead cost is allocated to Product Y and Product Z?
What is the activity rate for the Machining activity cost
pool?
What is the activity rate for the Machine Setups activity cost
pool?
What is the activity rate for the Product Design activity cost
pool?
What is the activity rate for the General Factory activity cost
pool?
Using the ABC system, how much total manufacturing...
A. what is the companys plantwide iverhead rate ?
B.how much manufacturing overhead is allocated to product Y
and product Z?
C. what is the actuvity rate for the machining activity cost
pool?
D.what is the activity rate for the machine setups activity
cost pool?
E. what is the activity rate fir the product design activity
cost pool?
F. what is the activity rate for the general factory cost
pool?
Greenwood Company manufactures two products—14,000 units of Product Y and...
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 209,000 10,000 MHs...
Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 242,400 12,000 MHs...
product and role 2 Hound your 12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.) Product Y Product Z Machining cost 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.) Product Y Product z Machine setups cost % 14. Using the ABC system, what...
Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Expected Activity Activity Cost Pool Machining Machine setups Production design General factory Activity Measure...