A. using the abc system, how much total manufacturing overhead cost would be assigned to product Y?
B. Using ABC system, how mych total manufacturing overhead cost woykd be assigned to product Z?
C.using the plabtwide iverhead rate, what percentage if the total overbead cost is allocated to product Y and product Z?
D. Using ABC system, what percebtage if the machining costs is assigned to product Y and product Z?
E. what percentage if machine setups cost is assigned to product Y and Product Z?
F. what percentache of product design cost is addined to product Y and Z?


Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantw
0 0
Add a comment Improve this question Transcribed image text
Answer #1
Activity Estimated Cost A Estimated Activity B Activity Rate (A/B)
Machining          200,000                  10,000                      20
Machine Setup          100,000                        200                   500
Production Design            84,000                            2             42,000
Genral Factory          300,000                  12,000                      25
Total Estimated Cost          684,000
A Product Y Activity- (A) Activity Rate-(B) Cost (A*B)
Machining              8,000                          20           160,000
Machine Setup                    40                        500             20,000
Production Design                       1                  42,000             42,000
Genral Factory              9,000                          25           225,000
Manufacturung Overhead Cost           447,000
B Product Z Activity- (A) Activity Rate-(B) Cost (A*B)
Machining              2,000                          20             40,000
Machine Setup                  160                        500             80,000
Production Design                       1                  42,000             42,000
Genral Factory              3,000                          25             75,000
Manufacturung Overhead Cost           237,000
C Plant Wide Amount
Estimated Overhead Cost          684,000
Estimade Direct Labour Hours (3000+9000)            12,000
Predetermined Ohs (684000/12000)                    57
Product y Product Z Total
Direct Labours Hrs              9,000                    3,000             12,000
Predetermined Ohs                    57                          57
Manufacturing Ohs assigned (9000*57,3000*57)          513,000               171,000           684,000
% of allocation 75% 25% 100%
D Machine Cost Product y Product Z Total
Machine Cost    160,000.00            40,000.00     200,000.00
% of allocation 80% 20% 100%
E Machine Design Product y Product Z Total
Machine Design Cost      20,000.00            80,000.00     100,000.00
% of allocation 20% 80% 100%
F Prodcut Design Product y Product Z Total
Prodcut Design Cost      42,000.00            42,000.00       84,000.00
% of allocation 50% 50% 100%
Add a comment
Know the answer?
Add Answer to:
A. using the abc system, how much total manufacturing overhead cost would be assigned to product...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?...

    Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) Using the ABC system, what percentage of the Machining costs is assigned to...

  • Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?...

    Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? Using the ABC system, what percentage of Machine Setups cost...

  • 1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate...

    1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amonut) 2. using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Z (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amount) 3. Using the Plantwide overhead rate, what PERCENTAGE of...

  • 12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y...

    12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) 14. Using the ABC system, what percentage of the Product Design cost...

  • What is the company’s plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead...

    What is the company’s plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? What is the activity rate for the Machining activity cost pool? What is the activity rate for the Machine Setups activity cost pool? What is the activity rate for the Product Design activity cost pool? What is the activity rate for the General Factory activity cost pool? Using the ABC system, how much total manufacturing...

  • A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to...

    A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to product Y and product Z? C. what is the actuvity rate for the machining activity cost pool? D.what is the activity rate for the machine setups activity cost pool? E. what is the activity rate fir the product design activity cost pool? F. what is the activity rate for the general factory cost pool? Greenwood Company manufactures two products—14,000 units of Product Y and...

  • Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...

    Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 209,000 10,000 MHs...

  • Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 242,400 12,000 MHs...

  • product and role 2 Hound your 12. Using the ABC system, what percentage of the Machining...

    product and role 2 Hound your 12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.) Product Y Product Z Machining cost 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.) Product Y Product z Machine setups cost % 14. Using the ABC system, what...

  • Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Expected Activity Activity Cost Pool Machining Machine setups Production design General factory Activity Measure...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT