A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to...
What is the company’s plantwide overhead rate?
Using the plantwide overhead rate, how much manufacturing
overhead cost is allocated to Product Y and Product Z?
What is the activity rate for the Machining activity cost
pool?
What is the activity rate for the Machine Setups activity cost
pool?
What is the activity rate for the Product Design activity cost
pool?
What is the activity rate for the General Factory activity cost
pool?
Using the ABC system, how much total manufacturing...
1. What is the company’s plantwide overhead rate? (Round
your answer to 2 decimal places.)
2. Using the plantwide overhead rate, how much manufacturing
overhead cost is allocated to Product Y and Product Z?
(Round your intermediate calculations to 2 decimal places.
Round your answers to the nearest dollar amount.)
3. What is the activity rate for the Machining activity cost
pool? (Round your answer to 2 decimal places.)
4. What is the activity rate for the Machine Setups activity...
A. using the abc system, how much total manufacturing overhead
cost would be assigned to product Y?
B. Using ABC system, how mych total manufacturing overhead
cost woykd be assigned to product Z?
C.using the plabtwide iverhead rate, what percentage if the
total overbead cost is allocated to product Y and product Z?
D. Using ABC system, what percebtage if the machining costs is
assigned to product Y and product Z?
E. what percentage if machine setups cost is assigned...
1. What is the company’s plantwide overhead rate? (Round
your answer to 2 decimal places.)
2. What is the activity rate for the Machining activity cost
pool?
3. What is the activity rate for the Product Design activity
cost pool?
4. Which of the four activities is a batch-level activity?
A. Machining activity
B. Machine setups activity
C. Product design activity
D. General factory activity
Required information The Foundational 15 [L07-1, LO73, LO74) The following information applies to the questions...
Required information Greenwood Co uses a plantwide overhead rate based on direct labor hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z mpany manufactures two products 15,000 units of Product Y and 7000 units of Product Z. The company Estimat ed Overhead Expected Activity Activity Cost Poo1 Activity Measur Machining...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Cost s 221,100 Expected ActivitY Activity Cost Pool Machining Machine setups Production...
1.using the ABC system, how much total manufacturing overhead cost
would ge assigbed to product Y (Round your immediate calculations
and final answers to 2 decimal places. Round your answers to the
nearest dollar amonut)
2. using the ABC system, how much total manufacturing overhead
cost would ge assigbed to product Z (Round your immediate
calculations and final answers to 2 decimal places. Round your
answers to the nearest dollar amount)
3. Using the Plantwide overhead rate, what PERCENTAGE of...
Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 242,400 12,000 MHs...
Using the ABC system, how much total manufacturing overhead cost
would be assigned to Product Z? (Round your intermediate
calculations to 2 decimal places. Round your answers to the nearest
dollar amount.)
Using the plantwide overhead rate, what percentage of the total
overhead cost is allocated to Product Y and Product Z?
(Round your intermediate calculations to 2 decimal
places. Round your answers to 2 decimal
places.)
Using the ABC system, what percentage of the Machining costs is
assigned to...
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 209,000 10,000 MHs...