Question
A. what is the companys plantwide iverhead rate ?
B.how much manufacturing overhead is allocated to product Y and product Z?
C. what is the actuvity rate for the machining activity cost pool?
D.what is the activity rate for the machine setups activity cost pool?
E. what is the activity rate fir the product design activity cost pool?
F. what is the activity rate for the general factory cost pool?
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantw
0 0
Add a comment Improve this question Transcribed image text
Answer #1

A. Plant-wide overhead rate =Total Estimated overhead cost/Total direct Labour hours =$684,000 / 12,000 =$57 per labour hour

D. Machine setups activity cost pool =$100,000/200 steps =$500 per machine setups E. Product Design Activity cost pool =$84,0

Notes: 1 Total estimated overhead costs =$200,000+$100,000+$84,000+$300,000 =$684,000 2 Total direct labour hours =9,000+3,00

Hope this solves your query. Feel free to ask any further query in the comment section.

Add a comment
Know the answer?
Add Answer to:
A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • What is the company’s plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead...

    What is the company’s plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? What is the activity rate for the Machining activity cost pool? What is the activity rate for the Machine Setups activity cost pool? What is the activity rate for the Product Design activity cost pool? What is the activity rate for the General Factory activity cost pool? Using the ABC system, how much total manufacturing...

  • 1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....

    1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) 3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.) 4. What is the activity rate for the Machine Setups activity...

  • A. using the abc system, how much total manufacturing overhead cost would be assigned to product...

    A. using the abc system, how much total manufacturing overhead cost would be assigned to product Y? B. Using ABC system, how mych total manufacturing overhead cost woykd be assigned to product Z? C.using the plabtwide iverhead rate, what percentage if the total overbead cost is allocated to product Y and product Z? D. Using ABC system, what percebtage if the machining costs is assigned to product Y and product Z? E. what percentage if machine setups cost is assigned...

  • 1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....

    1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. What is the activity rate for the Machining activity cost pool? 3. What is the activity rate for the Product Design activity cost pool? 4. Which of the four activities is a batch-level activity? A. Machining activity B. Machine setups activity C. Product design activity D. General factory activity Required information The Foundational 15 [L07-1, LO73, LO74) The following information applies to the questions...

  • Required information Greenwood Co uses a plantwide overhead rate based on direct labor hours. It is...

    Required information Greenwood Co uses a plantwide overhead rate based on direct labor hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z mpany manufactures two products 15,000 units of Product Y and 7000 units of Product Z. The company Estimat ed Overhead Expected Activity Activity Cost Poo1 Activity Measur Machining...

  • Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product...

    Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Cost s 221,100 Expected ActivitY Activity Cost Pool Machining Machine setups Production...

  • 1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate...

    1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amonut) 2. using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Z (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amount) 3. Using the Plantwide overhead rate, what PERCENTAGE of...

  • Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 242,400 12,000 MHs...

  • Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?...

    Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) Using the ABC system, what percentage of the Machining costs is assigned to...

  • Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...

    Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 209,000 10,000 MHs...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT