Question

Required information The Foundational 15 [L07-1, LO73, LO74) The following information applies to the questions displayed bel

1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.)

2. What is the activity rate for the Machining activity cost pool?

3. What is the activity rate for the Product Design activity cost pool?

4. Which of the four activities is a batch-level activity?

A. Machining activity
B. Machine setups activity
C. Product design activity
D. General factory activity

0 0
Add a comment Improve this question Transcribed image text
Answer #1
1
Estimated overhead cost 729000
Divide by Estimated DLHs 14400
Plantwide overhead rate 50.63 per DLH
2
Machining
Estimated overhead cost 231600
Divide by Estimated MHs 12000
Activity rate for the Machining activity 19.30 per MH
3
Product design
Estimated overhead cost 77000
Divide by Estimated products 2
Activity rate for the Product Design activity 38500 per product
4
Machine setups activity is a batch-level activity
Option B is correct
Add a comment
Know the answer?
Add Answer to:
1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....

    1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) 3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.) 4. What is the activity rate for the Machine Setups activity...

  • What is the company’s plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead...

    What is the company’s plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? What is the activity rate for the Machining activity cost pool? What is the activity rate for the Machine Setups activity cost pool? What is the activity rate for the Product Design activity cost pool? What is the activity rate for the General Factory activity cost pool? Using the ABC system, how much total manufacturing...

  • A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to...

    A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to product Y and product Z? C. what is the actuvity rate for the machining activity cost pool? D.what is the activity rate for the machine setups activity cost pool? E. what is the activity rate fir the product design activity cost pool? F. what is the activity rate for the general factory cost pool? Greenwood Company manufactures two products—14,000 units of Product Y and...

  • Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Expected Activity Activity Cost Pool Machining Machine setups Production design General factory Activity Measure...

  • Required information Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product...

    Required information Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Cost Expected Activity 12,000 MHs 130 setups 2 products 15,000 DLHS Activity...

  • Required information Greenwood Co uses a plantwide overhead rate based on direct labor hours. It is...

    Required information Greenwood Co uses a plantwide overhead rate based on direct labor hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z mpany manufactures two products 15,000 units of Product Y and 7000 units of Product Z. The company Estimat ed Overhead Expected Activity Activity Cost Poo1 Activity Measur Machining...

  • Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates

    Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all $788,400 of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost PoolActivity MeasureEstimated Overhead CostExpected ActivityMachiningMachine-hours$ 238,80012,000MHsMachine setupsNumber of setups$ 93,100190setupsProduct designNumber of products$ 83,0002productsGeneral...

  • 6. What is the activity rate for the General Factory activity cost pool? (Round your answer...

    6. What is the activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.) 7. Which of the four activities is a batch-level activity? 8. Which of the four activities is a product-level activity? 9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) 10. Using the ABC system, how much...

  • 1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate...

    1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amonut) 2. using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Z (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amount) 3. Using the Plantwide overhead rate, what PERCENTAGE of...

  • Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number of setups...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT