Question

Required information Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The

6. What is the activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.)

7. Which of the four activities is a batch-level activity?

8. Which of the four activities is a product-level activity?

9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)

10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)

11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

6. Activity rate for the General Factory activity cost pool = $288000/12000 = $24 per DLH

7. Machine setup is batch-level activity

8. Production design is product-level activity

9.

Activity Cost Cost Driver Cost per Cost driver
Machining $       228,000 12000 # of machine hours $             19 per MH
Machine Setups $          40,000 100 # of setups $          400 per setup
Production Design $          74,000 2 # of products $    37,000 per product
General Factory $       288,000 12000 # of Direct labor hours $             24 per DLH
Total $       630,000

Overhead allocated to Product Y

Overhead allocated
Machining $       133,000 =7000*19
Machine Setups $          16,000 =40*400
Production Design $          37,000 =37000*1
General Factory $       168,000 =7000*24
Total $       354,000

10. Overhead allocated to Product Z

Overhead allocated
Machining $          95,000 =5000*19
Machine Setups $          24,000 =60*400
Production Design $          37,000 =37000*1
General Factory $       120,000 =5000*24
Total $       276,000

11.
Percentage of total overhead allocated to Product Y = 7000/12000 x 100 = 58.33%
Percentage of total overhead allocated to Product Z = 5000/12000 x 100 = 41.67%

Add a comment
Know the answer?
Add Answer to:
6. What is the activity rate for the General Factory activity cost pool? (Round your answer...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....

    1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) 3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.) 4. What is the activity rate for the Machine Setups activity...

  • 1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate...

    1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amonut) 2. using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Z (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amount) 3. Using the Plantwide overhead rate, what PERCENTAGE of...

  • 1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....

    1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. What is the activity rate for the Machining activity cost pool? 3. What is the activity rate for the Product Design activity cost pool? 4. Which of the four activities is a batch-level activity? A. Machining activity B. Machine setups activity C. Product design activity D. General factory activity Required information The Foundational 15 [L07-1, LO73, LO74) The following information applies to the questions...

  • 12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y...

    12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) 14. Using the ABC system, what percentage of the Product Design cost...

  • Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?...

    Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) Using the ABC system, what percentage of the Machining costs is assigned to...

  • Part 12 of 15 Required information Greenwood Company manufactures two products—13,000 units of Product Y and...

    Part 12 of 15 Required information Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: eBook Print Activity Cost Pool Machining Machine setups Production design...

  • Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...

    Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 203,000 10,000 MHs...

  • Required information Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product...

    Required information Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Part 13 of 15 eBook Activity Cost Pool Machining Machine setups Production design General...

  • Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Activity Measure Machine-hours Activity Cost Pool Machining Machine setups Production design General factory Number...

  • Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number of setups...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT