6. What is the activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.)
7. Which of the four activities is a batch-level activity?
8. Which of the four activities is a product-level activity?
9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)
11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.)
6. Activity rate for the General Factory activity cost pool = $288000/12000 = $24 per DLH
7. Machine setup is batch-level activity
8. Production design is product-level activity
9.
Activity | Cost | Cost Driver | Cost per Cost driver | ||
Machining | $ 228,000 | 12000 | # of machine hours | $ 19 | per MH |
Machine Setups | $ 40,000 | 100 | # of setups | $ 400 | per setup |
Production Design | $ 74,000 | 2 | # of products | $ 37,000 | per product |
General Factory | $ 288,000 | 12000 | # of Direct labor hours | $ 24 | per DLH |
Total | $ 630,000 |
Overhead allocated to Product Y
Overhead allocated | ||
Machining | $ 133,000 | =7000*19 |
Machine Setups | $ 16,000 | =40*400 |
Production Design | $ 37,000 | =37000*1 |
General Factory | $ 168,000 | =7000*24 |
Total | $ 354,000 |
10. Overhead allocated to Product Z
Overhead allocated | ||
Machining | $ 95,000 | =5000*19 |
Machine Setups | $ 24,000 | =60*400 |
Production Design | $ 37,000 | =37000*1 |
General Factory | $ 120,000 | =5000*24 |
Total | $ 276,000 |
11.
Percentage of total overhead allocated to Product Y = 7000/12000 x
100 = 58.33%
Percentage of total overhead allocated to Product Z = 5000/12000 x
100 = 41.67%
6. What is the activity rate for the General Factory activity cost pool? (Round your answer...
1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) 3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.) 4. What is the activity rate for the Machine Setups activity...
1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amonut) 2. using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Z (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amount) 3. Using the Plantwide overhead rate, what PERCENTAGE of...
1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. What is the activity rate for the Machining activity cost pool? 3. What is the activity rate for the Product Design activity cost pool? 4. Which of the four activities is a batch-level activity? A. Machining activity B. Machine setups activity C. Product design activity D. General factory activity Required information The Foundational 15 [L07-1, LO73, LO74) The following information applies to the questions...
12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) 14. Using the ABC system, what percentage of the Product Design cost...
Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) Using the ABC system, what percentage of the Machining costs is assigned to...
Part 12 of 15 Required information Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: eBook Print Activity Cost Pool Machining Machine setups Production design...
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 203,000 10,000 MHs...
Required information Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Part 13 of 15 eBook Activity Cost Pool Machining Machine setups Production design General...
Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Activity Measure Machine-hours Activity Cost Pool Machining Machine setups Production design General factory Number...
Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number of setups...