Question

! Required information The Foundational 15 (Algo) (LO7-1, LO7-3, LO7-4] [The following information applies to the questions d

  1. What is the company’s plantwide overhead rate?
  2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z?
  3. What is the activity rate for the Machining activity cost pool?
  4. What is the activity rate for the Machine Setups activity cost pool?
  5. What is the activity rate for the Product Design activity cost pool?
  6. What is the activity rate for the General Factory activity cost pool?
  7. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?
  8. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?
  9. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z?
  10. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z?
  11. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z?
  12. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z?
  13. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z?
0 0
Add a comment Improve this question Transcribed image text
Answer #1
As HOMEWORKLIB Quideline, Only First 4 Sub parts for Each Question per post will be Answered. Post remaing questions as a Separate post. So But I Answered the first 6 Sub parts in the given Question
1)
Plantwide Overhead Rate
           = Total Estimated overhead cost / Estimated Direct Labor hour
           = ( $ 224,400 + $ 129,600 + 88,000 $ 254,000) / 13,200 DLH
           =   $ 696,000 / 13,200 DLH
           = $ 52.73 per DLH
Plantwide Overhead Rate    = $ 52.73 per DLH
2)
Particulars Product Y Product Z
Direct labor Hours (A) 8,400 3,600
Plant wide overhead rate (B) $ 52.73 $ 52.73
Manufacturing overhead allocated
(A x B )
$ 442,932 $ 189,828
3)
Activity rate for Machining activity Cost pool
           = Estimated Overhead cost / Expected Machine hours
           = $ 224,400 / 11,000 MHs
$ 20.4 per MH
4)
Activity rate for Machine setups activity Cost pool
           = Estimated Overhead cost / Number of Machine setups
           = $ 129,600 / 240
$ 540 per setup
5)
Activity rate for Product design activity Cost pool
           = Estimated Overhead cost / Number of products
           = $ 88,000 / 2 products
$ 44,000 per Product
6)
Activity rate for General factory activity Cost pool
           = Estimated Overhead cost / Direct labor hours
           = $ 254,000 / 13,200
$ 19.24 per DLH
Add a comment
Know the answer?
Add Answer to:
What is the company’s plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?...

    Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? Using the ABC system, what percentage of Machine Setups cost...

  • A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to...

    A. what is the companys plantwide iverhead rate ? B.how much manufacturing overhead is allocated to product Y and product Z? C. what is the actuvity rate for the machining activity cost pool? D.what is the activity rate for the machine setups activity cost pool? E. what is the activity rate fir the product design activity cost pool? F. what is the activity rate for the general factory cost pool? Greenwood Company manufactures two products—14,000 units of Product Y and...

  • A. using the abc system, how much total manufacturing overhead cost would be assigned to product...

    A. using the abc system, how much total manufacturing overhead cost would be assigned to product Y? B. Using ABC system, how mych total manufacturing overhead cost woykd be assigned to product Z? C.using the plabtwide iverhead rate, what percentage if the total overbead cost is allocated to product Y and product Z? D. Using ABC system, what percebtage if the machining costs is assigned to product Y and product Z? E. what percentage if machine setups cost is assigned...

  • Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The...

    Greenwood Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 242,400 12,000 MHs...

  • Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The...

    Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 209,000 10,000 MHs...

  • 1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....

    1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) 3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.) 4. What is the activity rate for the Machine Setups activity...

  • Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?...

    Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.) Using the ABC system, what percentage of the Machining costs is assigned to...

  • product and role 2 Hound your 12. Using the ABC system, what percentage of the Machining...

    product and role 2 Hound your 12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.) Product Y Product Z Machining cost 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your "Percentage" answers to 2 decimal places.) Product Y Product z Machine setups cost % 14. Using the ABC system, what...

  • 1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2....

    1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) 2. What is the activity rate for the Machining activity cost pool? 3. What is the activity rate for the Product Design activity cost pool? 4. Which of the four activities is a batch-level activity? A. Machining activity B. Machine setups activity C. Product design activity D. General factory activity Required information The Foundational 15 [L07-1, LO73, LO74) The following information applies to the questions...

  • 1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate...

    1.using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Y (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amonut) 2. using the ABC system, how much total manufacturing overhead cost would ge assigbed to product Z (Round your immediate calculations and final answers to 2 decimal places. Round your answers to the nearest dollar amount) 3. Using the Plantwide overhead rate, what PERCENTAGE of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT