Compute the budgeted manufacturing overhead rate.
2.
Prepare the summary journal entry to record the allocation of manufacturing overhead.
3.
Compute the amount of under- or overallocated manufacturing overhead. Is the amount significant enough to warrant proration of overhead costs, or should
Original
Woodworking write it off to cost of goods sold? Prepare the journal entry to dispose of the under- or overallocated overhead.
Budgeted manufacturing overhead costs |
$4,800,000 |
Budgeted direct labor-hours |
240,000 |
Actual manufacturing overhead costs |
$4,909,000 |
Actual direct labor-hours |
246,000 |
Compute the budgeted manufacturing overhead rate. 2. Prepare the summary journal entry to record the allocation...
Henrietta Woodworking uses normal costing and allocates manufacturing overhead to jobs based on a budgeted labor-hour rate and actual direct labor-hours. Under- or overallocated overhead, if immaterial, is written off to Cost of Goods Sold. During 2017, Henrietta recorded the following: (Click the icon to view the data.) Read the requirements. Requirement 1. Compute the budgeted manufacturing overhead rate. Enter the formula, then enter the amounts to calculate the budgeted manufacturing overhead rate. Budgeted manufacturing Budgeted quantity of cost-allocation base...
4-28 Accounting for manufacturing overhead. Creative Woodworking uses normal costing and allocates man ufacturing overhead to jobs based on a budgeted labor-hour rate and actual direct labor hours. Under or overal located overhead, it immaterial, is written off to Cost of Goods Sold. During 2017, Creative recorded the following Budgeted manufacturing overhead costs Budgeted direct labor-hours Actual manufacturing overhead costs Actual direct labor-hours S4,140,000 180,000 54.337,000 189.000 Required 1. Compute the budgeted manufacturing overhead rate 2. Prepare the summary journal...
1.
Compute the budgeted manufacturing overhead rate
for
2017.
2.
Compute the under- or overallocated manufacturing
overhead of
Home
Radiator in
2017.
Dispose of this amount using the following:
a.
Write-off to Cost of Goods Sold
b.
Proration based on ending balances (before proration) in
Work-in-Process Control, Finished Goods Control, and Cost of Goods
Sold
c.
Proration based on the overhead allocated in
2017
(before proration) in the ending balances of Work-in-Process
Control, Finished Goods Control, and Cost of Goods...
4-25 Job cesting, accounting for manufacturing overhead, budgeted rates. The Matthew Company uses a normal job-costing system at its Minneapolis plant. The plant has a machining department and an assem- bly department. Its job-costing system has two direct-cost categories (direct materials and direct manufac- turing labor) and two manufacturing overhead cost pools (the machining department overhead, allocated to jobs based on actual machine-hours, and the assembly department overhead, allocated to jobs based on actual direct manufacturing labor costs). The 2017...
1. Compute the budgeted
manufacturing overhead rate for 2017. 2. Compute the under- or
overallocated manufacturing overhead of Radiator in 2017. Dispose
of this amount using the following:
a. Write-off to Cost of Goods Sold
b. Proration based on ending balances (before proration) in
Work-in-Process Control, Finished Goods Control, and Cost of Goods
Sold
c. Proration based on the overhead allocated in 2017(before
proration) in the ending balances of Work-in-Process Control,
Finished Goods Control, and Cost of Goods Sold 3....
3 The Hauty Radiator Company uses a normal costing system with a single manufacturing overhead cost pool and machine-hours as the cost-allocation base The following data are for 2017 Click the icon to view the following data) Read the requirements Requirement 1. Compute the budgeted manufacturing overhead rate for 2017 Begin by selecting the formula you will use. Then, enter the amounts and calculate the rate Budgeted manufacturing overhead rate (1) (2) - Requirement 2. Compute the under or overallocated...
4-34 Proration of overhead. (Z. Iqbal, adapted) The Zaf Radiator Company uses a normal-costing system with a single manufacturing overhead cost pool and machine-hours as the cost-allocation base. The follow- ing data are for 2011: Budgeted manufacturing overhead costs $4,800,000 Overhead allocation base Machine-hours Budgeted machine-hours 80,000 Manufacturing overhead costs incurred $4,900,000 Actual machine-hours 75,000 Machine-hours data and the ending balances (before proration of under- or overallocated overhead) are as follows: Cost of Goods Sold Finished Goods Control Work-in-Process Control...
4-39 Proration of overhead. (Z. Iqbal, adapted) The Zaf Radiator Company uses a normal-costing system with a single manufacturing overhead cost pool and machine-hours as the cost-allocation base. The fol- lowing data are for 2017: Budgeted manufacturing overhead costs $4,800,000 Overhead allocation base Machine-hours Budgeted machine-hours 80,000 Manufacturing overhead costs incurred $4,900,000 Actual machine-hours 75,000 Machine-hours data and the ending balances (before proration of under- or overallocated overhead) are as follows: Cost of Goods Sold Finished Goods Control Work-in-Process Control...
The Zero Radiator Company uses a normal-costing system with a single manufacturing overhead cost pool and machine-hours as the cost-allocation base. The following data are for 2017: (Click the icon to view the following data.) Read the rements. Data Table Requirement 1. Compute the budgeted manufacturing overhead rate for 2017. Begin by selecting the formula you will use. Then, enter the amounts and calculate the rate. Budgeted manufacturing overhead 5,850,000 Budgeted machine-hours 90,000 Budgeted manufacturing overhead rate = $ 65...
The Zef Radiator Company uses a normal-costing system with a single manufacturing overhead cost pool and machine hours as the cost-allocation base. The following data are for 2017: (Click the icon to view the following data.) Read the requirements Requirement 1. Compute the budgeted manufacturing overhead rate for 2017 Begin by selecting the formula you will use. Then, enter the amounts and calculate the rate. Budgeted manufacturing Overhead rate 1. Compute the budgeted manufacturing overhead rate for 2017. 2. Compute...