A 10 kW photovoltaic system generates 15,000 kWh per year. Its initial installed cost is $50,000...

A 10 kW photovoltaic system generates 15,000 kWh per year. Its initial installed cost is $50,000 and it is financed at 2%. The annual operation and maintenance cost is $200. The system is expected to last 30 years and its replacement cost will be $17,000. There are no incentives. Calculate the cost of energy generated by this system.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

GIVEN

Total generation = 15000 kwh per year

Initial cost = 50000 dollar

Replacement cost = 17000 dollar

Finance interest = 2%

Operation and maintenance cost = 200 dollar per year

Total cost payable in 30years = initial cost - replacement cost +interest cost + maintenance and operation cost

Total payable cost = 50000 - 17000 + 0.02*50000*30years + 200*30 yeara

Total payable cost in 30years = 69000 dollar

Cost payable per year = 69000/30

Cost payable per year= 2300 dollar

Cost energy generated by the system

1kwh energy cost = total cost payable per year/total generation per year

1kwh energy cost = 2300/15000

1kwh energy cost = 15.3333 cents/kwh

Please give thumbs up

Add a comment
Know the answer?
Add Answer to:
A 10 kW photovoltaic system generates 15,000 kWh per year. Its initial installed cost is $50,000...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • (c) Photovoltaic system installed to supply 2 kWh of energy per day pumping system which using centrifugal pump an...

    (c) Photovoltaic system installed to supply 2 kWh of energy per day pumping system which using centrifugal pump and DC motor. The peak sun hours in Oman are 6 h and the expected Project Life (PL) is 24 years. The system is designed to have the components and rating is as shown in Table Q3c1. Table Q3c2 shows the actual costs, quantities and life periods of the various components that are considered for Life Cycle Cost (LCC) calculations. Assume the...

  • 22 marks Question 2: (a) Photovoltaic system installed to supply 24 kWh, of energy per day to a DC lighting system...

    22 marks Question 2: (a) Photovoltaic system installed to supply 24 kWh, of energy per day to a DC lighting system in Şohar University.-The peak sun hours in Oman.are 6 h and the expected Project Life (PL) is 24 years. The system is designed to have the components and rating is as shown in Table Q2a. Table Q2a also shows the actual costs, quantities and life periods of the various components that are considered for Life Cycle Cost (LCC) calculations....

  • (7 pts) You are installing a 6-kW photovoltalc system that is expected to generate an average of 12,000 kWh per year fo...

    (7 pts) You are installing a 6-kW photovoltalc system that is expected to generate an average of 12,000 kWh per year for 25 years. The system will cost $3.80/Watt to install, then you receive a Federal Residential Renewable Energy Tax Credit for 30% of the installation cost. Your only additional cost over the system life will be to replace the inverter once for $2.500. How much will the solar-generated electricity cost over the life of the system measured in S/kWh?...

  • The developer and owner of a shopping mall is planning to install solar PV panels on...

    The developer and owner of a shopping mall is planning to install solar PV panels on the roof top. Project Costs: The 100-kw system will cost $225,000 to install on 600 m2 of space available on the roof top. It will have a useful life 20 years and a salvage value of $2,000. Annual operations and maintenance cost will be $1,500. Energy output: Based on Singapore weather conditions, the system is capable of producing 170,000 kwh of electricity in the...

  • Question The developer and owner of a shopping mall is planning to install solar PV panels...

    Question The developer and owner of a shopping mall is planning to install solar PV panels on the roof top. Project Costs: The 100-kw system will cost $225,000 to install on 600 m2 of space available on the roof top. It will have a useful life 20 years and a salvage value of $2,000. Annual operations and maintenance cost will be $1,500. Energy output: Based on Singapore weather conditions, the system is capable of producing 170,000 kwh of electricity in...

  • Case The city of Flinth, Arizona needs a new water delivery system from Lake Not There...

    Case The city of Flinth, Arizona needs a new water delivery system from Lake Not There Yet. The two options proposed by the city engineers are the following. Given the pace of remediation, the city assumes that this delivery system is not going to be too temporary a fix. • Option one is a water delivery system using the laws of nature and ingenuity of its designers, similar to the East Maui irrigation system in Hawaii. The initial investment is...

  • A Corporation Installed a new MRI machine at a cost of $720,000 this year in its...

    A Corporation Installed a new MRI machine at a cost of $720,000 this year in its medical professional clinic in a park. This state of the art system is expected to be used for 4 years and then sold for $145,000. The corporation uses a return requirement of 24% per year for all of its medical diagnostic equipment. As a student currently serving a co-op semester on the staff of this corporation, you are asked to determine the minimum revenue...

  • engineering economics A public utility district (PUD) has retained your services to provide a perpetual water...

    engineering economics A public utility district (PUD) has retained your services to provide a perpetual water service to a small resort community: Option 1 Option 2 $150,000 $235,000 45 Pipe First Cost Expected Life, years Salvage Value (S) Pump First Cost Expected Life, years 15,000 23,500 100,000 125,000 15 10,000 1,000 Pump House First Cost Expected Life, years 15,000 20,000 50 50 0 Energy (Annual) Costs First Year Gradient 50,000 1,000 increasing 20,000 1,000 decreasing 15,000 600 5,000 200 System...

  • A company is considering installing a solar heating system in its manufacturing plant for space and...

    A company is considering installing a solar heating system in its manufacturing plant for space and hot water hearing. There are three possible alternatives as given in the Table below: A B C Solar Collector Area 2,500 ft2 3,500ft2 4,500 ft2 Storage tank 1,500 gal 1,500 gal 3,000 gal Installed Cost $20,000 $25,000 $50,000 Maintenance Cost $2,500 $2,000 $1,500 Annual savings 35% 60% 85% Useful life 10 years 10 years 10 years Salvage value 0 0 $5,000 Note that the...

  • A town wants to replace its water pumping system they have to options gravity plan and...

    A town wants to replace its water pumping system they have to options gravity plan and pumping plan. Both options have a 40-year life, at a 10% interest rate no salvage value. OS Gravity Pumping DO $1,400,000 MAAR Initial Investment $2,800,000 Investment @ none year 10 TO o SO 1 TA $200,000 O ) Ne Operation and 10.000$/yr Maintenance AT Power Cost None 50,000$/yr > Average first 10 years (A value) Average next 30 N years (A Value) OOT OO...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT