A certain process measurement has a mean of 49 and a standard deviation of 1. The specifications call for 50 ± 5. What is the value of the process capability index (Cpk)?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Cpk = MIN(UPPER LIMIT - MEAN / 3 * STANDARD DEVIATION, MEAN - LOWER LIMIT / 3 * STANDARD DEVIATION)

UPPER SPECIFICATION = 55
LOWER SPECIFICATION = 45
MEAN = 49
STANDARD DEVIATION = 1


Cpk = MIN(55 - 49 / 3 * 1, 49 - 45 / 3 * 1)
Cpk = MIN(2, 1.3333)
Cpk = 1.33

The process is capable since the Cpk >= 1.33

Add a comment
Know the answer?
Add Answer to:
A certain process measurement has a mean of 49 and a standard deviation of 1. The...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A certain process is under statistical control and has a mean value of 130 and a...

    A certain process is under statistical control and has a mean value of 130 and a standard deviation of 8. The specifications for the process are: a. USL (upper specification limit) = 150 b. LSL(lower specification limit) =100 a. Calculate the cp and cpk b. Which of these indices is a better measure of process capability and why? c. Assuminng a normal distribution what percentage of output is expected to fall ourside the specification. Why is it important to know...

  • 15-A process produces bags of a certain type of chocolate. The Cp and Cpk to measure...

    15-A process produces bags of a certain type of chocolate. The Cp and Cpk to measure process capability based on the weight of the bags are equal to 1 and -5, respectively. If the lower control limit equals 1.4 lbs and the standard deviation of the weights is 0.1 Ibs, what is the value for the mean of the process? A) 2 grams B) 2.5 grams D) 3.5 grams E) 4 grams

  • 9.The mean of a certain production process is known to be 50 with a standard deviation of 2.5. The production manager m...

    9.The mean of a certain production process is known to be 50 with a standard deviation of 2.5. The production manager may welcome any change is mean value towards higher side but would like to safeguard against decreasing values of mean. He takes a sample of 12 items that gives a mean value of 48.5. What inference should the manager take for the production process on the basis of sample results? Use 5 per cent level of significance for the...

  • A 1-kHz sine wave is sampled at 1.5 kHz. What is the expected alias frequency (5 points) 1. A certain length measurement is performed 500 times. The mean value is the error in the measurement, how ma...

    A 1-kHz sine wave is sampled at 1.5 kHz. What is the expected alias frequency (5 points) 1. A certain length measurement is performed 500 times. The mean value is the error in the measurement, how many readings fall within 5.15cm of the 3. The lighting department of a city has installed 2000 electric lamps with an a. After what period of lighting hours would we expect 10% of the lamps b. How many lamps may be expected to fail...

  • PROBLEM 1: Consider two manufacturing processes for production of malleable iron castings, and the mean and...

    PROBLEM 1: Consider two manufacturing processes for production of malleable iron castings, and the mean and standard deviation of one dimension of the castings resulting from these two processes are shown in the following table. The specifications on this dimension are given as 50+ 10 mm Mean 50 Standard Deviation Process A Process B (a) Calculate Cp and Cpk of these two processes

  • Frank Pianki, the manager of an organic yogurt processing plant desires a quality specification w...

    Frank Pianki, the manager of an organic yogurt processing plant desires a quality specification with a mean of 20.0 ounces, an upper specification limit of 20.5 ounces and a lower specification limit of 19.5 ounces. The process has a mean of 20.0 ounces and a standard deviation of 1.25 ounce The process capability index (Cpk)-「 (round your response to three decimal places) Frank Pianki, the manager of an organic yogurt processing plant desires a quality specification with a mean of...

  • 1. A business process has a process-capability-ratio Cpk = 0.0. Does this process performance meet the...

    1. A business process has a process-capability-ratio Cpk = 0.0. Does this process performance meet the 3-sigma quality control standard? If meet standard, please input number "1", if not, input number "2". Flag this Question Question 41 pts 2. A process fills baby formula into bottles with a target of 3 ounces ± 0.20 ounce. Two hundred bottles of baby formula from the process were sampled. The results showed the average amount of baby formula placed in the bottles to...

  • In-Class Exercise - Cpk Problem Design specifications require that a key dimension on a product measure...

    In-Class Exercise - Cpk Problem Design specifications require that a key dimension on a product measure 110 + 13 units. A process being considered for producing this product has with a mean of 110 units and a standard deviation of four units. a. What can you say (quantitatively) regarding the process capability? b. Suppose the process average shifts to 98 units. Calculate the new process capability. c. What can you say about the process after the shift? Approximately what percentage...

  • Question 6 1 pts You have just used the capability index (Cpk) formulas to compute the...

    Question 6 1 pts You have just used the capability index (Cpk) formulas to compute the two values "min [0.8, 1.2]". Which of the following is the proper interpretation of these numbers? The true capability index value is 1 The true capability index value is much larger than 1 The mean of the production process has shifted to the left of the design limits The mean of the production process has shifted to the right of the design limits The...

  • any help? Question 6 1 pts You have just used the capability index (Cpk) formulas to...

    any help? Question 6 1 pts You have just used the capability index (Cpk) formulas to compute the two values "min (1.2, 0.8)". Which of the following is the proper interpretation of these numbers? The mean of the production process has shifted to the left of the design limits The true capability index value is much larger than 1 The mean of the production process has shifted to the right of the design limits The mean has not shifted at...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT