Question

The company of Mac is processing four parts (A, B, C, and D) through a sequence...

The company of Mac is processing four parts (A, B, C, and D) through a sequence of four operations 1, 2, 3, and 4) Please note that not all parts are processed in all operations. Part A, which has weekly quantities of 70 units, is processed through operations 1, 2, and 3 in that order. Part B, which has weekly quantities of 90 units, is processed through operations 2, 4, and 1 in that order. Part C, which has weekly quantities of 65 units, is processed through operations 3, 2, and 4 in that order. Finally, part D, which has weekly quantities of 100 units, is processed through operations 2, 1, and 4 in that order. (a) Draw the network diagram and (b) prepare the From-To table for this work system.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Please rate my answer..If you have any doubts do comment.. Thank you Happy learning

Add a comment
Know the answer?
Add Answer to:
The company of Mac is processing four parts (A, B, C, and D) through a sequence...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question-3 The company of SEMO is processing four parts (A, B, C, and D) through a...

    Question-3 The company of SEMO is processing four parts (A, B, C, and D) through a sequence of four operations1, 2, 3, and 4) Please note that not all parts are processed in all operations. Part A, which has weekly quantities of 70 units, is processed through operations 1, 2, and 3 in t quantities of 90 units, is processed through operations 2, 4, and 1 in that order. Part C, which has weeky quantities of 65 units, is processed...

  • 1) You are about to develop a Heijunka schedule for four products which are processed through...

    1) You are about to develop a Heijunka schedule for four products which are processed through four operations in a flow line fashion. The necessary information about processing times, setup times, resource time availability and demand is given below. Processing times table Process 1 Process 2 Process 3 Process 4 Part A 10 15 7 9 Part B 12 8 6 12 Part C 13             9 5 3 Part D 1 7 6 9 Setup times table Process 1...

  • Problem #1 Five jobs are to be processed through a single machine. The processing times and...

    Problem #1 Five jobs are to be processed through a single machine. The processing times and due dates are given here. Assume all released dates are zero. Job 1 2 3 4 5 Processing time 3 6 5 4 2 Due date 4 8 12 21 15 In each of the following cases determine the sequence in which she should perform and compute Mean Flow Time, Average Tardiness and the number of tardy jobs. A) Shortest Processing Time B) Early...

  • 4 Two sheet metal parts, A and B, are produced separately, each requiring two press-working operations....

    4 Two sheet metal parts, A and B, are produced separately, each requiring two press-working operations. Part A is routed through operations 1 and 2, and part B is routed through oper- ations 3 and 4.The two parts are then joined in a welding step (operation 5), and the assem- bly is routed to an electroplating operation (operation 6). The six operations have the following fraction defect rates: qi-0.05, q,-0.15.q,-0.10, q,-0.20, q,-0.13, q.-0.08. If the desired final quantity of assemblies...

  • What is the quantity of material going from C to D? 4000 4500 1000 2000

    What is the quantity of material going from C to D? 4000 4500 1000 2000 What is the quantity of material going from C to D 2 Save Problem on Designing Plant Layout You have been retained as a consultant to design the layout of a manufacturing plant. The plant produces five products designated as Job 1, Job 2, Job 3, Job 4 and Job S. There are four departments (processes) through which these five jobs are to be processed....

  • t is Symmetrie and Asymmeti 08.MAC address is address a) Software address b) Hardware address c)...

    t is Symmetrie and Asymmeti 08.MAC address is address a) Software address b) Hardware address c) Both a) and b) d) None Q9.ICANN handle a) IP addresses b) MAC address c) Both a) and b) d) None Q10.The boundary between network prefix and host suffix is mark as mask, which a) Decrease proficiency b) Makes processing efficient c) Moderate the proficiency d) All of the above

  • Please answer ALL parts to this Digital signal processing question: Please show your working Adgtalater has a samp...

    Please answer ALL parts to this Digital signal processing question: Please show your working Adgtalater has a sampingfrequency of 1.=882kHz and a prise response given by: Answer the fellowing. giving answers to four decimal places PART 1 Decermine the z-domain transfer function and complete the following As B:-1 where A and B PART 2 Determine the magnitude of the garぱ1./2 dB PART 3 If the input sequence to the flter is denoted by zn) and the output sequence is denoted...

  • Parts (A) through (D) are four different CVP analyses, but some information is missing from each...

    Parts (A) through (D) are four different CVP analyses, but some information is missing from each analysis. Each part contains a separate analysis. Fill in the unknowns for each part. Part Sales Fixed Costs Variable Costs Total Costs Contribution Margin % Operating Income A $3,100 $1,310 $ $ 65 % $ B 4,000 3,000 4,000 % C 6,200 930 % 310 D 460 1,110 % 3,49 *Need to fill in the missing information*

  • The following table contains information concerning four jobs that are awaiting processing at a work center....

    The following table contains information concerning four jobs that are awaiting processing at a work center. Job Job Time (Days) Due Date (Days) A 14 20 B 10 16 C 7 15 D 6 17 a. Sequence the jobs using (1) First come, first served, (2) Shortest processing time, (3) Earliest due date, and (4) Critical ratio. Assume the list is by order of arrival. Sequence for First come, first served   (Click to select)   A-B-C-D   D-C-B-A   C-B-D-A   A-C-D-B Sequence for Shortest processing time   (Click...

  • A web-based company has a goal of processing 95 percent of its orders on the same...

    A web-based company has a goal of processing 95 percent of its orders on the same day they are received. 1. If 480 out of the next 500 orders are processed on the same day, would this prove that they are exceeding their goal, using α = .01? Follow and show the 7 steps for hypothesis testing. 2. Determine the p-value and interpret its meaning. 3. What assumption must you make in order to conduct the test in part a?...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT