Question

Kagle design engineers are in the process of developing a new “green” product, one that will...

Kagle design engineers are in the process of developing a new “green” product, one that will significantly reduce impact on the environment and yet still provide the desired customer functionality. Currently, two designs are being considered. The manager of Kagle has told the engineers that the cost for the new product cannot exceed $550 per unit (target cost). In the past, the Cost Accounting Department has given estimated costs using a unit-based system. At the request of the Engineering Department, Cost Accounting is providing both unit- and activity-based accounting information (made possible by a recent pilot study producing the activity-based data).

Unit-based system:
Variable conversion activity rate: $120 per direct labor hour
Material usage rate: $30 per part

ABC system:
Labor usage: $15 per direct labor hour
Material usage (direct materials): $20 per part
Machining: $80 per machine hour
Purchasing activity: $150 per purchase order
Setup activity: $3,600 per setup hour
Warranty activity: $500 per returned unit (usually requires extensive rework)
Customer repair cost: $25 per repair hour (average)

Activity and Resource Information (annual estimates)

Design A Design B
Units produced 20,000 20,000
Direct material usage 350,000 parts 325,000 parts
Labor usage 60,000 hours 130,000 hours
Machine hours 60,000 70,000
Purchase orders 2,000 1,500
Setup hours 800 200
Returned units 1,300 350
Repair time (customer) 2,100 600

Required:

1. Select the lower-cost design using unit-based costing.
- Select your answer -Design ADesign BItem 1

Are logistical and post-purchase activities considered in this analysis?
- Select your answer -YesNoItem 2

2. Select the lower-cost design using ABC analysis.
- Select your answer -Design ADesign BItem 3

3. What if the post-purchase cost was an environmental contaminant and amounted to $15 per unit for Design A and $40 per unit for Design B? Compute the Post-purchase cost for each design.

Post-Purchase Cost
Design A $
Design B $

Assume that the environmental cost is borne by society. Now which is the better design?
- Select your answer -Design ADesign B

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. Computation of Cost per unit using Unit based system Design A Design B 350000 parts/20000 units -17.5 part 325000 parts/203. Computation of Post purchase Cost per unit using Unit Based System Design A Design B Cost per unit Post puchase cost CostFeel free to ask any clarification if required. Please provide feedback by thumbs up if satisfied. It will be highly appreciated. Thank you.

Add a comment
Know the answer?
Add Answer to:
Kagle design engineers are in the process of developing a new “green” product, one that will...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Activity-Based Life-Cycle Costing Kagle design engineers are in the process of developing a new "green" product, one th...

    Activity-Based Life-Cycle Costing Kagle design engineers are in the process of developing a new "green" product, one that will significantly reduce impact on the environment and yet still provide the desired customer functionality. Currently, two designs are being considered. The manager of Kagle has told the engineers that the cost for the new product cannot exceed $600 per unit (target cost). In the past, the Cost Accounting Department has given estimated costs using a unit-based system. At the request of...

  • Harwell, Inc. produces two different products, Product A and Product B. Harwell uses a traditional volume-based...

    Harwell, Inc. produces two different products, Product A and Product B. Harwell uses a traditional volume-based costing system in which direct labor hours are the allocation base. Harwell is considering switching to an ABC system by splitting its manufacturing overhead cost of $850,000 across three activities: Setup, Production, and Finishing. Under the traditional volume-based costing system, the predetermined overhead rate is $8.50/direct labor hour. Under the ABC system, the rate for each activity and usage of the activity drivers are...

  • Harwell, Inc. produces two different products, Product A and Product B. Harwell uses a traditional volume-based...

    Harwell, Inc. produces two different products, Product A and Product B. Harwell uses a traditional volume-based costing system in which direct labor hours are the allocation base. Harwell is considering switching to an ABC system by splitting its manufacturing overhead cost of $750,000 across three activities: Setup, Production, and Finishing. Under the traditional volume-based costing system, the predetermined overhead rate is $7.50/direct labor hour. Under the ABC system, the rate for each activity and usage of the activity drivers are...

  • After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing...

    After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing facility, Tom Spencer, the production supervisor, believes that he can reduce production costs by reducing the time spent on machine setups. He has spent the last month working with employees in the plant to change over the machines more quickly with the same reliability. He plans to produce 109,000 units of the Sport model and 44,500 units of the Pro model in the first...

  • Carter, Inc. produces two different products, Product A and Product B. Carter uses a traditional volume-based...

    Carter, Inc. produces two different products, Product A and Product B. Carter uses a traditional volume-based costing system in which direct labor hours are the allocation base. Carter is considering switching to an ABC system by splitting its manufacturing overhead cost of $783,000 across three activities: Design, Production, and Inspection. Under the traditional volume-based costing system, the predetermined overhead rate is $2.61/direct labor hour. Under the ABC system, the rate for each activity and usage of the activity drivers are...

  • rate for design rate for machining rate for inspection indirect cost for product a indirect cost...

    rate for design rate for machining rate for inspection indirect cost for product a indirect cost for product b manufacturing cost for A manufacturing for b gross profit for a gross profit for b Walnut Systems produces two different products, Product A, which sells for $140 per unit, and Product B, which sells for $198 per unit, using three different activities: Design, which uses Engineering Hours as an activity driver; Machining, which uses machine hours as an activity driver, and...

  • Product B Product A Direct materials $14 per unit 0.5 DLH per unit 0.4 MH per...

    Product B Product A Direct materials $14 per unit 0.5 DLH per unit 0.4 MH per unit $25 per unit 1.5 DLH per unit 1.1 MH per unit Direct labor hours Machine hours Batches 125 batches 250 batches 10,000 units 10 modifications 2,000 units Volume Engineering modifications Number of customers 50 modifications 500 customers 400 customers 95 per unit per 'unit Market price $35 per unit The company's direct labor rate is $20 per direct labor hour (DLH). Additional information...

  • After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing...

    After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing facility, Tom Spencer, the production supervisor, believes that he can reduce production costs by reducing the time spent on machine setups. He has spent the last month working with employees in the plant to change over the machines more quickly with the same reliability. He plans to produce 119,000 units of the Sport model and 49,500 units of the Pro model in the first...

  • After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing...

    After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing facility, Tom Spencer, the production supervisor, believes that he can reduce production costs by reducing the time spent on machine setups. He has spent the last month working with employees in the plant to change over the machines more quickly with the same reliability. He plans to produce 112,000 units of the Sport model and 46,000 units of the Pro model in the first...

  • After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing...

    After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing facility, Tom Spencer, the production supervisor, believes that he can reduce production costs by reducing the time spent on machine setups. He has spent the last month working with employees in the plant to change over the machines more quickly with the same reliability. He plans to produce 103,000 units of the Sport model and 41,500 units of the Pro model in the first...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT