Please show all work. Thanks in advance
Below is the screenshot of the formula applied -
Below is the result in tabular form -
LT 2 Q = L4L |
On Hand | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
Gross Requirement | 70 | 56 | 86 | 86 | 76 | 66 | 86 | 86 | ||
Scheduled Receipts | 70 | 56 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Projected on Hand | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Net Requirements | 0 | 0 | 86 | 86 | 76 | 66 | 86 | 86 | ||
Planned Order Receipts | 0 | 0 | 86 | 86 | 76 | 66 | 86 | 86 | ||
Planned Order Releases | 86 | 86 | 76 | 66 | 86 | 86 | 0 | 0 | ||
LT 2 Q = 106 |
On Hand | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
Gross Requirement | 70 | 56 | 86 | 86 | 76 | 66 | 86 | 86 | ||
Scheduled Receipts | 106 | 106 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Projected on Hand | 0 | 36 | 86 | 0 | 20 | 50 | 90 | 4 | 24 | |
Net Requirements | 0 | 0 | 0 | 86 | 56 | 16 | 0 | 82 | ||
Planned Order Receipts | 0 | 0 | 0 | 106 | 106 | 106 | 0 | 106 | ||
Planned Order Releases | 0 | 106 | 106 | 106 | 0 | 106 | 0 | 0 |
In L4l method, holding cost is minimum whereas ordering is high.
In Fixed Order quantity, holding cost is high whereas ordering cost is lower than L4L.
Please show all work. Thanks in advance Complete the MRP record for a bicycle frame using...
Complete the MRP record for a bicycle seat. MRP Record Part Name: Seat Lead time = 1 week On-hand = 40 Safety stock = 20 Order quantity: FOQ = 100 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Gross requirements 70 50 80 80 70 60 80 80 Scheduled receipts Available inventory Net requirements Planned order receipts Planned order releases
Please answer the following question for week #2: This is from page 495 of Managing Operations Across the Supply Chain by author Morgan Swink 3. Complete the MRP record for a bicycle seat. MRP Record Part Name: Seat Lead time = 1 week On hand = 30 Safety stock = 20 Order quantity: FOQ = 100 Week Week Week Week Week Week Week Week 2 Gross Requirements 7050 7060 80 Scheduled Receipts Available Inventory Net Requirements Planned Order Receipts Planned...
Material Requirements Planning (MRP) Given the product tree diagram and develop a material requirements plan for item D. A 400 unit-delivery of product P is due at the beginning of week 7. Use the worksheet Product Structure Tree Inventory Information P Order Currently Scheduled Lead Item On-Hand Recpt (wk) Time Qty LAL P 100 L4L A A FIxed Q 450 Fixed Q = 600 L4L 0 C 90 100 (wk 2) 80 (wk 2) 2 50 2 C D(2 Beg...
In the following MRP planning schedule for Item J, indicate the correct net requirements, planned order receipts, and planned order releases to meet the gross requirements. Lead time is one week. (Leave no cells blank - be certain to enter "0" wherever required.) 1 0 34 WEEK NUMBER 2 3 4 47 ITEM J Gross requirements On hand Net requirements Planned order receipt Planned order release 5 71 - 4 Item J LT = 1 Q = L4L Period Gross...
Fill in the blanks In the following MRP planning schedule for Item J, indicate the correct net requirements, planned order receipts, and planned order releases to meet the gross requirements. Lead time is one week. (Leave no cells blank - be certain to enter "0" wherever required.) WEEK NUMBER 0 4 50 5 70 75 40 ITEM J Gross requirements On hand Net requirements Planned order receipt Planned order release 75 50 70 Period Gross requirements Item J Scheduled receipts...
OPMGT301 Homework Assignment 5: MRP You MUST show all your work, including tables for all the necessary parts, to get full credit. If you plan to type your answers in a word processor, you may find the following table useful (you can copy-and-paste it for convenience) End Product Week Gross Requirements from Gross Requirements from Gross Requirements Scheduled Receipts Projected On-hand Net Requirements Planned-order Receipts Planned-order Releases 12345678 Product B 12 345 Week Gross Requirements from Gross Requirements from Gross...
12. (25 points) Complete the MRP calculations for the simple product shown below. Numbers next to each item identify the usage rates. For example, the usage rate for item A is 2. A2 C3 C2 B1 Item X L4L On Hand 80 Lead Time 4 70 120 85 50 70 100 Gross Requirements Scheduled Receipts On Hand Net Requirements) Planned Order Receipt Planned Order Release Styles Paragraph tem A 150 FOQ+ 30 On Hand Lead Time 8 5 2 Gross...
In the following MRP planning schedule for Item J, indicate the correct net requirements, planned order receipts, and planned order releases to meet the gross requirements. Lead time is one week. (Leave no cells blank - be certain to enter "0" wherever required.) WEEK NUMBER ITEM J 0 1 2 3 4 5 Gross requirements 73 55 74 On hand 43 Net requirements Planned order receipt Planned order release Period 1 2 3 4 5 Item J LT = 1...
In the following MRP planning schedule for Item J, indicate the correct net requirements, planned order receipts, and planned order releases to meet the gross requirements. Lead time is one week. (Leave no cells blank - be certain to enter "0" wherever required.) WEEK NUMBER ITEM J 0 1 2 3 4 5 Gross requirements 75 50 70 On hand 40 Net requirements Planned order receipt Planned order release Period 1 2 3 4 5 Item J OH = 40...
Using the following table and applying the L4L lot sizing rule, what is the projected planned receipts for week 3? L4L Lead Time: 1 1 2 3 4 5 6 7 8 Gross Requirements 90 20 40 60 60 Scheduled Receipts 40 Projected On-Hand Inventory 50 Planned Receipts Planned Order Releases