C is a sub competent of B and B is a subcomponent of A. An increase in lead time of C directly impacts B & indirectly impacts A. Hence, answer is B and or A.
Since an increase in lead time of C causes an overall increase in lead time along chain of C-> B-> A. This can be compensated if lead time for B & or A can be reduced. For example : A reduced lead time by 0.5 weeks in B & A will have no impact on overall lead time
A part structure and lead times (weeks) for product A are shown in the product structure....
You need to schedule 10 units of product Alpha for delivery in 6 weeks. Three units of D and 2 units of F are required for each Alpha. The lead time for Alpha is 1 week. Lead time for D is 1 week, and lead time for F is 2 weeks. Click the icon to view the product structure Click the icon to view the time-phased product structure. i More Info Construct a net material requirements plan if there are...
Please give the correct answer and explanation, 10 weeks is
incorrect.
Product A is made from components B and C. Item B, in turn, is made from D and E. Item C also is an intermediate item, made from F and H. Finally, intermediate item E is made from H and G. Note that item has two parents. The following are item lead times: Item Lead Time (weeks) A B C G H. 1 1 a. What lead time (in...
5. (10 points) An end item has the product structure diagram given in the following figure. Suppose that the MPS for the end item is End then A43) Fit) 3 weeks 4 weeks a. Find the planned order release for component F b. Find the planned order release for component I. c. Find the planned order release for component H.
5. (10 points) An end item has the product structure diagram given in the following figure. Suppose that the MPS...
Question #1 : The product structure tree of a round-top computer desk is given as follows. On-hand inventory information is given in the Table 1 as follows. Level 0 Round-top computer desk (A) Level 1 B(4) C(2) Level 2 E(2) F(3) E(3) D(2) D(1) D(3) Level 3 Table 1: On-hand inventory Item On hand (units) Round-top com r desk 100 48 20 1) Determine number of units of each item required to satisfy a new order of 10 round-top computer...
homework help
23. Below you are shown a product structure tree for end item “A.” Weekly lead time values for purchase, manufacture, and assembly activities are shown to the immediate right of each item identifier. What is the minimum length planning horizon that should be considered for master production scheduling this item? a. 23 weeks b. 5 weeks c. 8 weeks d. 6 weeks e. 7 weeks 24. Various MPS practices were discussed in class. From the following statements, identify...
Determine planned order releases for each part shown in the product structure tree. 180 units of the finished product 565 are needed in week 6 (as shown in the master production schedule below). To figure out X43 material plan, look at planned order releases of both 565 and Y36. So, fill out X43 form after filling out 565 and Y36 plans. 565 X43 Y36(2) N78 J27(4) X43 Part Number On Hand Lot Size Lead Time 565 0 Lot-for-lot 1 week...
The demand for subassembly S is 120 units in week 7. Each unit of S requires 2 units of T and 1 unit of U. Each unit of T requires 1 unit of V, 1 unit of W. and 1 unit of X. Finally, each unit of U requires 1 unit of Y and 2 units of Z. One firm manufactures all items. It takes 2 weeks to make S. 1 week to make T. 2 weeks to make U....
One unit of A is made of one unit of B and one unit of C. B is
made of four units of C and one unit each of E and F. C is made of
two units of D and one unit of E. E is made of three units of F.
Item C has a lead time of one week; Items A, B, E, and F have
two-week lead times; and Item D has a lead time of...
i Data Table Table 2. INVENTORY RECORD DATA F G C Data Category Lot-sizing rule Lead time Safety stock Scheduled receipts Beginning inventory L4L 3 weeks 0 150 (week 2) 125 D FOQ = 800 3 weeks 0 300 (week 2) 0 Item E FOQ = 600 4 weeks 0 600 (week 1) 255 L4L 2 weeks 70 None 670 L4L 1 week 0 1,200 (week 1) 0 Print Done Done nd then click Check Answer. Clear All The BOM...
34. Consider the following product structure diagram, representing a bill of materials required to assemble some finished good A: 009G CCDD (Items A through FF have been sketched as circles for convenience, but represent the same information as a product structure diagram sketched with squares, or any other shapes.) Please answer the following questions, based on this information a. Who is the parent of item N? b. Who are the children of item B? C. List all raw material items...