Question

qm

Joshua Cycle Trading makes a plastic tricycle that is composed of three major components: a handlebar-front wheel-pedal assembly, a seat and frame unit, and rear wheels. The company has orders for 16,000 of these tricycles. Current schedules yield the following information. The company obviously does not have the resources available to manufacture everything needed for the completion of 16,000 tricycles so has gathered purchase information for each component. Requirements Cost to Cost to Component Plastic Time (minutes) Space Manufacture ($) Purchase ($) Front 4 12 3 9 14 Seat 5 6 3 7 10 Rear wheel (each) 0.5 3 0.1 1 4 Available 60,000 170,000 40,000 (a) Develop a linear programming model to tell the company how many of each component should be manufactured. (b) Based on the sensitivity report below, how many of each component should be manufactured and purchased in order to provide 16,000 fully completed tricycles at the minimum cost

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
qm
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • . Tots Toys makes a plastic tricycle that is composed of three major components: a handlebar-front...

    . Tots Toys makes a plastic tricycle that is composed of three major components: a handlebar-front wheel-pedal assembly, a seat and frame unit, and rear wheels. The company has orders for 12,000 of these tricycles. Current schedules yield the following information. Requirements Component Plastic Time Space Cost to Manufacture Cost to Produce Front 3 10 2 $8 $12 Seat/Frame 4 6 2 6 9 Rear Wheel (each) 0.5 2 0.1 1 3 Available 50,000 160,000 30,000 The company obviously does...

  • Scenario: Styles Wing Bicycle Company manufactures and sells 2 sizes of bicycles, 21.5 inch and 22.5...

    Scenario: Styles Wing Bicycle Company manufactures and sells 2 sizes of bicycles, 21.5 inch and 22.5 inch. Sales Their sales team has committed to the following projected monthly unit sales for the next year. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 21.5 Bike 368 472 633 616 443 345 322 317 317 317 328 22.5 Bike 320 410 550 535 385 300 280 275 275 275 285 Dec 420 365 The selling price for the 21.5...

  • A small company manufactures three different electronic components for computer Component Arequires 2 hours of fabrication...

    A small company manufactures three different electronic components for computer Component Arequires 2 hours of fabrication and 1 hour of assembly, component B requires 3 hound Inbrication and 1 hour of assembly, and component requires 2 hours of fabrlotion and 2 houn of assembly. The company has up to 1,150 labor hours of fabrication time and 1,000 labor hours of assembly time available per week. The profit on each component, A, B, and C, la $7, 58, and $10, respectively....

  • # 42 Chef Gourmet, Inc., has assembled the following data pertaining to its two most popular...

    # 42 Chef Gourmet, Inc., has assembled the following data pertaining to its two most popular products. Blender Food Processor   Direct material $ 24 $ 41   Direct labor 18 31   Manufacturing overhead @ $50 per machine hour 50 100   Cost if purchased from an outside supplier 66 114   Annual demand (units) 26,000 30,000      Past experience has shown that the fixed manufacturing overhead component included in the cost per machine hour averages $36. Management has a policy of filling all sales...

  • Kitchen Magician, Inc. has assembled the following data pertaining to its two most popular products. Electric...

    Kitchen Magician, Inc. has assembled the following data pertaining to its two most popular products. Electric Mixer Blender $ 25 43 19 Direct material Direct labor Manufacturing overhead @ $52 per machine hour Cost if purchased from an outside supplier Annual demand (units) 52 32 104 115 32,000 67 27,000 Past experience has shown that the fixed manufacturing overhead component included in the cost per machine hour averages $40. Kitchen Magician's management has a policy of filling all sales orders,...

  • A small company manufactures three different electronic components for computers. Component A req...

    A small company manufactures three different electronic components for computers. Component A requires 2 hours of fabrication and 1 hour of assembly; component B requires 3 hours of fabrication and 1 hour of assembly, and component C requires 2 hours of fabrication and 2 hours of assembly. The company has up to 950 labor-hours of fabrication time and 700 labor-hours of assembly time available per week. The profit on each component, A, B, and C, is $7, $8, and $10,...

  • Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One...

    Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec’s production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit...

  • Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One...

    Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 6000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit...

  • Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One...

    Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 6000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. may be either manufactured by the...

  • Problem 4-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution...

    Problem 4-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT