Process Scheduling Create diagram and calculating wait time for FIFO
Gantt chart example
0 - 7 - 9 - 14 - 20 - 24
P4 - P2 - P5 - P1 - P3
Waiting time = Time at which it got picked up - arrival time
P1's waiting time = 14-7 = 7
P2's waiting time = 7-4 = 3
P3's waiting time = 20-8 = 12
P4's waiting time = 0
P5's waiting time = 9-5 = 4
Total waiting time = (7+3+12+0+4) = 26.
Average waiting ti,e = 26/5 = 5.2.
Process Scheduling Create diagram and calculating wait time for FIFO Gantt chart example Arrival Time Service...
Round Robin Schedulin ProcessBurst Time in MsP14P22P32Calculate the average waiting time and turnaround time using round robin scheduling, where the time quantum q = 2 ms According to the Round Robin algorithm, the arrival of processes is shown in the following Gantt chart. From the Gantt chart, the waiting time and the turnaround time are calculated as: Waiting time for P1= Waiting time for P2 = Waiting time for P2 = Therefore, the average waiting time = Turnaround time =
1.Make a Gantt Chart diagram that illustrates a possible issue with limited resource scheduling if the resources are not available? Make up an example “what if”- some of the project team get the flu at the same time, for instance? Your diagram should illustrate how much of the resource is needed over a short period of time, that there is not enough of the resource, and possible options to keep the project as close to schedule or budget as possible....
5. [27pts.] Given the following set of processes, with arrival times, priorities, and the length of the CPU burst in ms: Priority Burst time Arrival Time Process 3 P1 4 P2 2 10 P3 P4 (Note: a lower number means higher priority) Draw a Gantt chart showing a FCFS scheduling algorithm. a. b. Draw a Gantt chart showing a non-preemptive Priority scheduling algorithm. c. Draw a Gantt chart showing a Round Robin Scheduling algorithm with quantum of 4ms d. Compute...
Opearting
system
5. [27pts.] Given the following set of processes, with arrival times, priorities, and the length of the CPU burst in ms: Process Arrival Time Burst time Priority P1 P2 P3 2 10 P4 (Note: a lower number means higher priority; processes P2- P4 arrive at the same time, in the given order) a. Draw a Gantt chart showing a FCFS scheduling algorithm. b. Draw a Gantt chart showing a non-preemptive Priority scheduling algorithm. Draw a Gantt chart showing...
Compute turnaround time with preemptive priority scheduling. Also compute the average turnaround time. Show the Gantt chart and other details. Process CPU Burst time Arrival time Priority P1 25 5 5 P2 10 10 3 P3 15 15 4 P4 20 20 2 P5 30 25 1
2. Consider the following processes with the arrival time, burst time, and priority. Draw Gantt chart for a priority-based preemptive CPU scheduling algorithm (the highest number refers the highest priority, in case of same priority, follow FCFS) (4 points) Priority PIDATBT PI 0 10 P3 10 6 3
6. Draw GANTT charts (plots of activity vs. time) for the Round Robin and Priority scheduling strategies for the following jobs (assume larger numbers mean higher priority and that the time quantum is 2): (10 marks ) Job Arrival Time Duration Priority tam What is the average waiting time under each scheme? Time → Average wait time for round robin is: PRIORITY Time → Average wait time for round robin is:
Consider the process scheduling table below: Process name Arrival time Processing time Priority A 0 4 3 B 0 6 4 (lowest) с 2 5 2 D 3 3 1 (highest) Draw Gantt charts to show the execution pattern for one cycle for each process using the preemptive SJF.
2- Consider the following set of processes: Arrival Time Process Service Time 10 Find the average response, wait and turnaround times of the processes in FCFS, Round Robin (with Q-2), SPN and SRT, MLFD (with q-2') and HRRN algorithms.
2- Consider the following set of processes: Arrival Time Process Service Time 10 Find the average response, wait and turnaround times of the processes in FCFS, Round Robin (with Q-2), SPN and SRT, MLFD (with q-2') and HRRN algorithms.
Q2. Consider the following processes with arrival time and burst time. 20 Marks Process Arrival Time Burst Time P16 29 0.0 P21 19.0 12 P32 22.0 13 P41 30.0 25 Calculate waiting time and average waiting time Round Robin (R-R) scheduling algorithm by using the following Quantum/Time slice: a. Quantum/Time Slice = 8 b. Quantum/Time Slice = 16 Q3. Calculate the CPU Utilization and Idle time by considering 35% I/O wait and number of processes are from 1 to 5....