Question

Refer to the Excel speadsheet, "Inventory Management," to complete the "Analytics Exercise: An MRP Explosion - Brunswick Motors," at the end of Chapter 21 in the textbook. Answer Questions 1-3.

Given Spread Sheet: A-Topic 3 Part 1&2 AND  A-Topic 3 Part 3

Part 2 Gear Box Given Information Setu Invento Number of orders (count cells with values for planned order release Set-up Cos

Questions 1 Initially, assume that Phil wants to minimize his in ventory requirements. Assume that each order will be only fo

Model 1000 master schedule Week 1 2 3 4 5 67 8 9 10 11 12 Demand 15 5 7 10 15 20 10 26 8 216 Model 1000 product structure Eng

Given the cost structure, evaluate the cost of the schedule from question 1. Assume inventory is val ued at the end of each w

Please use given information, show formulas/ calculations, and give reasons behind answer.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Information about On hand inventory and scheduled receipts is not given in the question. However, this schedule required beginning on hand iventory. Considering the following information about on hand inventory and scheduled receipts from textbook.

Item Lead Time On Hand Scheduled Receipts (SOR)
Engine Assembly 0
Gear box 2 17 5(2)
Input shaft 3 40 22(2)

Resulting MRP plan is following:

Steps to create the MRP table 1) Enter the gross requirement as per Master Planning Schedule (MPS). Gross requirement of comp

MRP Schedule 10 Item 16 10 15 20 10 Engine Assembly 15 10 Item Gear box SOR5(2) Scheduled Receipt 16 10 15 20 10 15 Gross Req

Setup Inventory Total
Gear Box 90x8=720 2x4=8 720+8=728
Input Shaft 45x5=225 1x96=96 225+96=321
Total Cost 728+321=1049
Add a comment
Know the answer?
Add Answer to:
Refer to the Excel speadsheet, "Inventory Management," to complete the "Analytics Exercise: An MRP Explosion -...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read a...

    Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read an article on time-phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time phased requirements planning.      Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the...

  • Recently, Phil Harris, the production control manager at Brunswick, read an article on time phased requirements...

    Recently, Phil Harris, the production control manager at Brunswick, read an article on time phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time-phased requirements planning. Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the Model 1000 engine...

  • The following is a partial MRP table. Based on the information provided, an inventory holding cost...

    The following is a partial MRP table. Based on the information provided, an inventory holding cost of $0.39 per unit per week and a setup cost of $139 per order, what would be the planned order release for week 2 using a part period balancing lot sizing approach? Week Gross Requirements Scheduled Receipts On-Hand Inventory Net Requirements Time Phased Net Requirements Planned Order Releases 0 1 2 3 4 5 10 30 20 15 20 40 L | 10 40...

  • Given the following product tree, complete the MRP records for parts X, Y, and Z. Note...

    Given the following product tree, complete the MRP records for parts X, Y, and Z. Note that parts X and Y have specified order quantities. FILL IN THE BLANKS Note: *Gross Requirements & Net Requirements are shown as negative because demand represents withdrawals from inventory Scheduled Receipts & Planned Order Receipts are shown as positive because production represents additions to inventory 1 | 2 | 3 | 4 | 5 -15 -10 -15 -10 -15 20 71 Part X LT:...

  • calculate the MRP Complete the following MRP record. All gross requirements, beginning inventory levels, and scheduled...

    calculate the MRP Complete the following MRP record. All gross requirements, beginning inventory levels, and scheduled receipts are shown. Click the icon to view the MRP record. Complete the material requirements plan (enter your responses as whole numbers). Week .A2* LT(weeks) 3 2 6 1 Gross requirements Scheduled receipts Projected ending inventory: 360 350 100 50 100 220 0 Net requirements Min. order 1 Planned receipts Planned orders ulo iMore Info Week 2 4 5 6 3 A2** Gross requirements...

  • * 0. THE CAR FRAMEWOR X Walmart of-Topic KX C In The Following MRP PLEX ments/210071...

    * 0. THE CAR FRAMEWOR X Walmart of-Topic KX C In The Following MRP PLEX ments/210071 by 4:59pm Points 10 Submitting an external tool Available until Jun 7 In the following requirements schedule, X is equal to 1 3 N 250 250 125 Week Gross Requirements Scheduled Receipts Available Inventory Net Requirements Planned Order Receipt Planned Order Release 180 X 125 125 a. O b. 125 O C. 180 d. 305 If there is a planned order release of 120...

  • Consider the following information about an end-product item: Ordering cost =$45/order Average usage =12 units/week Inventory...

    Consider the following information about an end-product item: Ordering cost =$45/order Average usage =12 units/week Inventory carrying cost =$1/unit/week (a) How many orders should we place per year (52 weeks) to replenish inventory of the item based on average weekly demand? (b) Given the following time-phased net requirements from an MRP record for this item, determine the sequence of planned orders using economic order quantity (EOQ) and periodic order quantity (POQ) procedures. Assume lead time equals zero and current on-hand...

  • Complete the MRP record for a bicycle seat. MRP Record Part Name: Seat Lead time =...

    Complete the MRP record for a bicycle seat. MRP Record Part Name: Seat Lead time = 1 week On-hand = 40 Safety stock = 20 Order quantity: FOQ = 100 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Gross requirements 70 50 80 80 70 60 80 80 Scheduled receipts Available inventory Net requirements Planned order receipts Planned order releases

  • Best-Appliance makes high-powered industrial strength microwave oven and wants to create an MRP for their oven...

    Best-Appliance makes high-powered industrial strength microwave oven and wants to create an MRP for their oven assembly with a minimum cost possible. Following table show gross requirements of their product for twelve weeks. Develop a Part Period Balancing (PPB) solution and calculate the total relevant costs for the plan Week 1 2 3 4 5 6 8 10 11 12 7 Gross requirements 20 40 40 70 30 10 80 40 Also, for this plan the Holding cost $2.50/unit/week; setup...

  • Extra Credit MRP Exercise (15 Points) Given: Indented Bill of Material Master Production Schedule (MPS) and...

    Extra Credit MRP Exercise (15 Points) Given: Indented Bill of Material Master Production Schedule (MPS) and Material Requirements Planning (MRP) Tables Bill of Material (QPA) A =Finished Good LT=1 B (1 LT-3 C(2) LT=2 D(1) LT 2 LT-2 F (2) LT-2 G (1) LT=1 Answer the following questions: 1). Fill in MPS/MRP tables provided 2). For Part Number B: What is the first period in which there is a net requirement ?:_AND, What is the net requirement Quantity (in the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT