A new designed water nozzle is to be tested to determine its loss coefficient. Water is...
Show all work and answer all parts of the problem please. The 45 degree elbow nozzle discharges water into the atmosphere. The cross-sectional area of the elbow is 25 cm2 150 cm2 at the inlet and 25 cm2 at the exit. Velocity at point 1 and 2 are given as 2 m/s and 12 m/s 450 respectively. The gage pressure at 1 is 73 kPa 150 em2 30 cm The elevation difference between the centers of the exit and the...
now pleassse QUESTI 20 points Save An The heat-pump system shown is designed to provide water heating and space-cooling. The system includes a heat exchanger to subcool the R134a refrigerant at the outlet of the water heater while heating the refrigerant at the outlet of the evaporator. Given the following data, determine the enthalpy at each station, 1 through 6, using the R134a property tables (click here). Type your answers hy through h6 in the space provided below, and show...
The heat-pump system shown is designed to provide water-heating and space-cooling. The system includes a heat exchanger to subcool the R134a refrigerant at the outlet of the water heater while heating the refrigerant at the outlet of the evaporator. Given the following data, determine the enthalpy at each station, 1 through 6, using the R134a property tables (click here). Type your answers hy through h6 in the space provided below, and show all your work on your paper. · At...
Joule - What is the difference between static mic, d al wees for fund flow? How can we measure these types of pees? - Water flows in a pipe network between two w a factory is a certains part of the pipe system the flow is 295 There is where we changes in the pipe as illustrated in the next figure. The pipe dishes the water flow at meshee Calculate the next parameters 1. The major and minor losses for...
1 CPD4701 Assignment 2/2019 Question 2 shell and-tube heat exchanger was designed for the following service: Cold stream Hot stream Crude Oil Fluid Cooling water Tube side Stream allocation Shell side Mass flow rate (kg/s) 110 30 Inlet temperature (C) 90 Outlet temperature (C) Heat capacity (J/kg K) Density (kg/m2) Viscosity (Pa-s) Thermal conductivity (W/m-K) Fouling factor (m2 CW) 40 50 2177 4187 787 995 0.72-10 1.89-103 0.122 0.59 0.0002 0.0004 The shell and tube heat exchanger has the following...
1 CPD4701 Assignment 2/2019 Question 2 shell and-tube heat exchanger was designed for the following service: Cold stream Hot stream Crude Oil Fluid Cooling water Tube side Stream allocation Shell side Mass flow rate (kg/s) 110 30 Inlet temperature (C) 90 Outlet temperature (C) Heat capacity (J/kg K) Density (kg/m2) Viscosity (Pa-s) Thermal conductivity (W/m-K) Fouling factor (m2 CW) 40 50 2177 4187 787 995 0.72-10 1.89-103 0.122 0.59 0.0002 0.0004 The shell and tube heat exchanger has the following...
Quantitative: In the 1950s liquid hydrogen was considered as a fuel for a new type of aircraft being developed, the SR-71 Blackbird (shown in Figure 1). Figure 1: The SR-71 Blackbird Early research on the project focused on which fuel to use for the Blackbird. Pratt & Whitney had a J-57 engine that was designed for kerosene and being considered for implementation on the Blackbird. The J-57 only took 5 months to convert to running on liquid hydrogen, however tests...
CASE 1-5 Financial Statement Ratio Computation Refer to Campbell Soup Company's financial Campbell Soup statements in Appendix A. Required: Compute the following ratios for Year 11. Liquidity ratios: Asset utilization ratios:* a. Current ratio n. Cash turnover b. Acid-test ratio 0. Accounts receivable turnover c. Days to sell inventory p. Inventory turnover d. Collection period 4. Working capital turnover Capital structure and solvency ratios: 1. Fixed assets turnover e. Total debt to total equity s. Total assets turnover f. Long-term...