JCX Ltd operates in a highly competitive market and is involved in the production of parts for the farming industry. It has plants in Auckland, Wellington, Christchurch and Dunedin. One of its plants, the Wellington Plant, specialises in the production of two parts: JCX-1 and JCX-2. Part JCX-1 produced the highest volume of activity, and for many years, it was the only part produced by the plant. Five years ago, Part JCX-2 was added. Profits increased for the first few years after the addition of the new product. However, in the last two years the plant has faced intense competition and its sales of Part JCX-2 has dropped. In fact, the plant showed a small gross loss in the most recent reporting period. Much of the competition was from foreign sources, and the plant manager was convinced that the foreign producers were guilty of selling parts below their cost of production. The plant currently uses a traditional costing system where only manufacturing overhead costs are allocated to products using a predetermined plant-wide overhead rate based on direct labour hours. The company’s CEO Jim James has recently attended a leadership conference in London and was very impressed by a presentation given by Nicola Toms, CFO of a large manufacturing company, on ABC. Jim managed to arrange a private meeting with Nicola to explore her experiences with the development and implementation of ABC in her organisation. After the meeting, Jim was convinced that JCX could benefit from the implementation of ABC. He agreed with Nicola’s view that as the level of external environment factors increases, more reliable product cost information is needed. He was very impressed with how Nicola went about her implementation strategy. In particular, he noted Nicola’s emphasis on the importance of clearly addressing up-front major issues that are likely to arise when seeking buy-in of the managers in the organisation. Jim took notes of those issues as follows.
ABC is too complex and expensive to implement. ABC can be prone to misuse by constant revision of the cost pools or cost drivers.
In ABC, not all overhead costs, such as CEO salary, can be allocated to specific activities.
If ABC is implemented, other systems, such as variance analysis, may have to be changed resulting in disruptions and costs. While many organisations have experimented with ABC as a one-off exercise, not many adopted ABC as an ongoing costing system.
1. Present five external business environmental factors affecting JCX costs and explain the implications of those factors to the quality of product cost information under the current costing system.?
We need at least 10 more requests to produce the answer.
0 / 10 have requested this problem solution
The more requests, the faster the answer.
JCX Ltd operates in a highly competitive market and is involved in the production of parts...
Product-Costing Accuracy, Corporate Strategy, ABC Autotech Manufacturing is engaged in the production of replacement parts for automobiles. One plant specializes in the production of two parts: Part #127 and Part #234. Part #127 produced the highest volume of activity, and for many years it was the only part produced by the plant. Five years ago, Part #234 was added. Part #234 was more difficult to manufacture and required special tooling and setups. Profits increased for the first three years after...
Scenario Cartech Manufacturing is engaged in the production of replacement parts for automobiles. One plant specializes in the production of two parts: Part 271 and Part 342. Part 271 produces the highest volume of activity, and for many years it was the only part produced by the plant. Five years ago, Part 342 was added. Part 342 was more difficult to manufacture and required special tooling and setups. Profits increased for the first three years after the addition of the...
There is no 1 or 2, only 3-5 Problem 4.34 Product-Costing Accuracy, Corporate Strategy, ABC Autotech Manufacturing is engaged in the production of replacement parts for automobiles. One plant specializes in the production of two parts: Part #127 and Part #234, Part #127 pro- duced the highest volume of activity, and for many years it was the only part produced by the plant. Five years ago, Part #234 was added. Part #234 was more difficult to manufacture and required special...
There is no 1 or 2, only 3-5 Problem 4.34 Product-Costing Accuracy, Corporate Strategy, ABC Autotech Manufacturing is engaged in the production of replacement parts for automobiles. One plant specializes in the production of two parts: Part #127 and Part #234, Part #127 pro- duced the highest volume of activity, and for many years it was the only part produced by the plant. Five years ago, Part #234 was added. Part #234 was more difficult to manufacture and required special...
Brunswick Parts is a small manufacturing firm located in eastern Canada. The company, founded in 1947, produces metal parts for many of the larger manufacturing firms located in both Canada and the United States. It prides itself on high quality and customer service, and many of its customers have been buying at least some of their parts from Brunswick since the 1950s. Production of the parts takes place in one of two plants. The older plant, located in Fredericton, was...
Brunswick Parts is a small manufacturing firm located in eastern Canada. The company, founded in 1947, produces metal parts for many of the larger manufacturing firms located in both Canada and the United States. It prides itself on high quality and customer service, and many of its customers have been buying at least some of their parts from Brunswick since the 1950s. Production of the parts takes place in one of two plants. The older plant, located in Fredericton, was...
Hello, If anyone can help me I will grestly appreciate it! I will also give a thumbs up! Autotech Manufacturing is engaged in the production of replacement parts for automobiles. One plant specializes in the production of two parts: Part 127 and Part 234. Part 127 produces the highest volume of activity, and for many years it was the only part produced by the plant. Five years ago, Part 234 was added. Part 234 was more difficult to manufacture and...
Brunswick Parts is a small manufacturing firm located in eastern Canada. The company, founded in 1947, produces metal parts for many of the larger manufacturing firms located in both Canada and the United States. It prides itself on high quality and customer service, and many of its customers have been buying at least some of their parts from Brunswick since the 1950s. Production of the parts takes place in one of two plants. The older plant, located in Fredericton, was...
Brunswick Parts is a small manufacturing firm located in eastern Canada. The company, founded in 1947, produces metal parts for many of the larger manufacturing firms located in both Canada and the United States. It prides itself on high quality and customer service, and many of its customers have been buying at least some of their parts from Brunswick since the 1950s. Production of the parts takes place in one of two plants. The older plant, located in Fredericton, was...
El Dorado Company has two production plants. Recently, the company conducted an ABM study to determine the cost of activities involved in processing orders for parts at each of the plants. How might an operations manager use this information to manage the cost of processing orders? Question 2 options: Set up an ABC costing system Identify benchmarks Compare the cost to process an order at each plant and the nature of the orders to determine if costs are out of...