Geomatics Engineering is the science and art of making all essential measurements to determine the physical and cultural details above, on, or beneath the surface of the Earth, and to show them in a usable form, or to establish the position of points or details. Surveying helps in preparation of a plan or a topographical map showing all the features of the area under consideration like river, mountains, bridges, highways, tunnels, dams. Distances and height of each features are measured. The objective of geomatics engineering is

  • To set out the field parameters at the site for further engineering works.

  • The aim of surveying is to prepare a map to show the relative positions of the objects on the surface of the earth.

  • To collect field data.

  • To prepare plan or map of the area surveyed.

  • To analyze and calculate the field parameters for setting out operation of actual engineering works

We can draw maps using surveying to get the idea about the location where the civil engineering project is about to start. like

  • Geological map: Shows area including underground resources.

  • Topographical map: Shows various features like river, village, towns, forest etc.

  • Cadastral map: Shows boundaries of fields, shops, houses and other properties.

  • Contour map: To find best possible routes to the site location.

  • Military map: Helps to identify strategic points within defense area.

  • Archeological map: This includes places of ancient remnants and its existence.

  • Engineering map: Gives details of engineering work like highways, irrigation canals etc.

.Before constructing any big civil engineering project on site, surveying is preliminary part. It help us to know about the soil condition, ground water table location, seismic condition of site. These things will help us in designing and constructing a safe structure.


answered by: ANURANJAN SARSAM
Add a comment
Know the answer?
Add Answer to:
geomatics or Land surveying operations in civil and construction projects
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Civil engineers are tasked to carry out works which may be Building construction, Transportation (road works),...

    Civil engineers are tasked to carry out works which may be Building construction, Transportation (road works), Water and Sanitation, Dams and Bridge projects. Before any of these project commences, material requirements must be known so that estimates can be made for determination of funds needed. Discuss how the taking off of Building construction, Transportation, water and Sanitation, Dams and Bridge project is carried out. In your discussion state clearly how the taking off of a Building construction, Transportation (road works),...

  • Surveying Quesion ( Civil Engineering ): Convert the grads angle to degree, mintues, seconds, please show...

    Surveying Quesion ( Civil Engineering ): Convert the grads angle to degree, mintues, seconds, please show me steps 2) how to convert slope distance with a know slope into a horizontal distance see picture for details P |- Convert the following: Angle P ( 312° 34 55 40 degree , min. Second s from Slope it Slope distance 52. S - 120.0cm 4. hor. Zun tea) distance 2- Do a) the Computation 90 7. Pro bability interva) E90 - +...

  • Question 2.1 (8 Marks) Roads Ltd is a construction company that builds roads and related civil...

    Question 2.1 (8 Marks) Roads Ltd is a construction company that builds roads and related civil projects. The company recently faced increased calls from investors to pay dividends due to the perceived lack of new profitable projects in a low growth economy. The company has, in spite of weak business sentiment, maintained a stable profit margin. At a recent meeting, the board resolved to adopt a residual approach to dividend payments. You have been tasked with recommending the dividend that...

  • 2. A civil engineer involved in construction requires 4800, 5800, and 5700 m2 of sand, fine...

    2. A civil engineer involved in construction requires 4800, 5800, and 5700 m2 of sand, fine gravel, and coarse gravel, respectively, for a building project. There are three pits from which these materials can be obtained as shown in the following table: Pits Sand Fine Gravel Coarse Gravel % % % 52 30 18 2 20 50 30 3 25 20 55 Use the matrix inverse algorithm based on Gauss Jordan method to determine how many cubic meters must be...

  • Projects Case Study A construction company requires a database to record details about building projects. Each...

    Projects Case Study A construction company requires a database to record details about building projects. Each project has its own project number, name and employees assigned to it. Each employee has an employee number, name and job classification, such as engineer or computer technician. The company charges its clients by billing the hours spent on each contract. The hourly billing rate is dependent upon the employee's position. For example, one hour of a computer technician's time is billed at a...

  • Write a detailed essay about the properties of concrete that are needed for a construction of...

    Write a detailed essay about the properties of concrete that are needed for a construction of a bridge. How does this bridge function according to these properties

  • Not sure if my answers are correct please help, thanks! Construction quantity Surveying. 5) Determine gypsum...

    Not sure if my answers are correct please help, thanks! Construction quantity Surveying. 5) Determine gypsum board required for residential building exterior walls, interior walls and ceiling area (20 points) Assume: Wall gypsum board size: 1/2" x 4' x 8' Ceiling Height: 8 feet Exterior wall (used one side gypsum board): 148 LF Interior wall (used two side gypsum board): 148 LF Ceiling gypsum board size: 5/8” x 4' x 8' Ceiling area: 24' x 50' Use a 5% waste...

  • 8. What is collective bargaining? How does it apply to the management of construction projects? 9....

    8. What is collective bargaining? How does it apply to the management of construction projects? 9. Briefly describe how project scheduling responds to the old adage: "time is money 10. How does waste management figure into sustainable construction practices and what does it require from building contractors? 11. Briefly describe three types of changes that may require a construction contract to be modified 12. What is a construction project's schedule of values? Describe how it relates to "cash flow" and...

  • this is regarding a construction safety course under the civil engineering degree plan, thanks Corporate safety...

    this is regarding a construction safety course under the civil engineering degree plan, thanks Corporate safety plans, site specific safety plans, and emergency response plans are very long and detailed. Employees are usually trained in the application of these plans but what happens to workers and the company if an employee with duties in these plans does not remember something they are responsible to do in the plans when an accident or emergency happens? Please write a comprehensive answer including...

  • 5. All of the following are true about projects and operations EXCEPT: A Operations are ongoing...

    5. All of the following are true about projects and operations EXCEPT: A Operations are ongoing endeavours that produce repetitive outputs, with resources assigned to do basically the same set of tasks according to the standards institutionalzed in a product life cycle, whereas projects are temporary endeavours Projects require project management activities and skill sets, whereas operations require business process management, operations management activities, and skill sets. Projects can intersect with operations at various points during the product life cycle....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT