Unit Conversions
a) 45 feet per second to yards per minute
b) 78 buckets an hour to buckets per minute
c) 41 inches pre second to yards per day
Thank you
Unit Conversions a) 45 feet per second to yards per minute b) 78 buckets an hour...
a) Estimate the production in compacted cubic yards per hour for a roller if its average speed will be 9.5 mph and it will cover 6.7 ft in one pass. The job specifications limit the compacted lift thickness to 4.8 inches and require 7 passes per lift. The company usually figures production based on 45 min per hour. b) How many hours will you need to produce 28,364 compacted cubic yards using this equipment (using the productivity from part(a)? C)...
using parametric equations and ange 6. Chris and Linda are standing 78 feet apart. At the same time, they each throw a softball toward each other. her ball with an initial velocity of 45 ft per second with an angle of inelination of 44. Chris throws her ball with an initial velocity of 41 feet per second with an angle of inclination of 39 a. Find two sets of parametric equations that represent a model of the problem situation. b....
A baseball player at second base throws a ball 87 feet to the player at first base. The ball is thrown 5 feet above the ground with an initial velocity of 50 miles per hour and at an angle of 16 above the horizontal. At which height does the player at first base catch the bal1? Round your answer to three decimal places. 15. a. 7.576 feet b. 6.676 feet c. 5.476 feet d. 6.076 feet e5.576 feet quarterback of...
A baseball is hit at a point of 3 feet above ground at a velocity of 100 feet per second and an angle of 45 degrees. The path of the baseball is h(x)= -0.0032(x-156.25)squared+87, where x and h(x) are measured in feet.A. what is the baseball's maximium height?B. will the baseball clear a 25-foot fence located 300 feet from home plate/
Below is a set of data that represents the velocity (in feet per second) of the final 45 seconds of the landing. At t 0, the plane is on its final descent. Table I t in seconds 10 20 25 30 45 5 15 35 40 v(t) feet per second 274.27 223.19 179.23 108.83 80.80 56.68 35.91 18.04 2.65 141.4 Table II t in seconds 4 5 14 15 24 25 34 35 44 45 v(t) in feet per second...
The standard time for an operation in Work-for-Pay Manufacturing Company is 0.25 hour per unit. There are 8 working hours in a day. The base (day rate) pay for an operator of this operation is $14 per hour. Based on these information and using a 120% incentive pay system, what is the daily pay (in $ per day) for an operator who produced 45 units in 8 working hours? a. 112.00 b. 157.50 c. 166.60 d. Not enough information given...
The standard time for an operation in Work-for-Pay Manufacturing Company is 0.25 hour per unit. There are 8 working hours in a day. The base (day rate) pay for an operator of this operation is $14 per hour. Based on these information and using a 120% incentive pay system, what is the daily pay (in $ per day) for an operator who produced 45 units in 8 working hours? a. 112.00 b. 157.50 c. 166.60 d. Not enough information given...
Please show each step! alloon takes off 400 feet from a parking lot. The balloon rises at a rate of 10 feet per minute. A dog standing at the edge of the parking lot watches the balloon take off a. Draw a picture. Label any parts of the picture that do not change as the b. How fast is the distance between the dog and the balloon changing 30 minutes after the balloon took off? Add any variables that you...
I'll rate ASAP :) In a given manufacturing process, the speed (feet per minute) of the assembly line is believed to affect the number of defective parts found in the inspection process. To test this, managers have devised a procedure in which the same number of parts per batch is visually examined at different line speeds and performed the following scatter diagram. What can you tell them about the relationship between variables? Scatterplot of Número de partes defectu vs Velocidad...
Standard Cost per Unit Actual Cost per Unit $ 3.96 $ 4.20 12.60 Direct materials: Standard: 1.80 feet at $2.20 per foot Actual: 1.75 feet at $2.40 per foot Direct labor: Standard: 0.90 hours at $14.00 per hour Actual: 0.95 hours at $13.40 per hour Variable overhead: Standard: 0.90 hours at $5.00 per hour Actual: 0.95 hours at $4.60 per hour Total cost per unit Excess of actual cost over standard cost per unit 12.73 4.50 4.37 $ 21.30 $21.06...