Question

1. Balance delay is another name for the percentage of idle time in a product layout. True False 2. The percentage of idle t

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. True: The percentage of idle time in the product layout is the balance delay. Greater utilisation tells us that there exists a smaller balance delay in the product layout.

2. False: The percentage of the idle time in the assembly line is regarded as the balance delay only.

3. True: The Production line's cycle time tells us about the time that is in between the units lying. Thus, dividing the available time by the cycle time gives us the daily capacity required.

4. False: This statement is false as Heuristic approaches cannot guarantee the optimal solutions that is to be obtained.

5. True: This statement is true as Cycle time is the maximum time allocated in the production line for each workstation for the completion of work.

Add a comment
Know the answer?
Add Answer to:
1. Balance delay" is another name for the percentage of idle time in a product layout....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls...

    1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls per 40-hour workweek. The process of servicing calls can be broken down into the six stations listed above. The precedence and time requirements for each element are as follows in the table below. The manager wants a new operational analyst to draw and label a precedence diagram for the service process. Finally, the manager needs to balance the line, calculate the efficiency of the...

  • 8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 pe...

    8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 percent. C. 100 percent. D. unknown, since balance delay is not related to efficieney. E. depends on the next operation. 9. A common goal in designing process layouts is: A. minimizing the number of workers. B. minimizing number of machines. minimizing transportation costs. maximizing workstation productive time E. maximizing transportation distances. 07) vnit 10. The maximum allowable cycle time is computed...

  • Question 1- Assembly Line Balancing A ball-bearing assembly firm wants to set up an assembly line...

    Question 1- Assembly Line Balancing A ball-bearing assembly firm wants to set up an assembly line that must have an output of 60 units per hour. The work elements, task times and their precedence relationships are shown in Table 1: Table 1 Work Element Time (sec.) Immediate Predecessor(s) A 40 NONE B 30 A C 50 A D 40 B E 6 B F 25 C G 15 C H 20 D, E I 18 F, G J 30 H,...

  • What is the difference between actual green time and effective green time A They are the...

    What is the difference between actual green time and effective green time A They are the same, just different naming terminologies B Actual green time include lost times while effective green time esclude lost times C. Actual green time include pedestrian time while effective green does not D. One is calculated using Highway Capacity while the other in Wester Method Ideal (base) sauration flow rate is taken as So - 1.900 pphalThis value (1900) onte as dividing 3600 by Aspeed...

  • Hi, I am requesting your help. Some of those that I am not sure if I...

    Hi, I am requesting your help. Some of those that I am not sure if I am right? Thank you, Michelle ________________________________ You work at Ford Motor Company and are responsible for determining weekly production capacity for the Juarez, Mexico assembly plant. There are 21 days left in the production month. Your sales manager just informed you that 4,725 vehicles need to be produced in the upcoming days to meet projected sales demand in the United States 21. Your production...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • Please see attached Pictures. This is a homework assignment for Legal environment of Business that i...

    Please see attached Pictures. This is a homework assignment for Legal environment of Business that i need help solving. Stacy mails Jennifer an offer to sell Jennifer 43 bags of rice for $107.00. Jennifer replies to Stacy by mail, stating, " agree to pay $105.75 for 43 bags of rice. Neither Stacy nor Jennifer are merchants. What is the status of Stacy's offer. 1. a. Jennifer has accepted it b. Jenifer has rejected it and counteroffered c, Jennifer has breached...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT