(a)

1 Discount Rate (in %) 7 Time Project A PV Factor@ 7% | PV of Cash Flow Project B PV Factor@ 7% | PV of Cash Flow -90000 1700

1 Discount Rate (in %) 7 Project A PV Factor@7% | PV of Cash Flow (B3 *C3) (B4 C4) (B5 C5) (B6 C6) (B7*C7) Project B PV of Ca16 IRR Project A (in %) 13.62 Project B (in %) 8.36 Project A PV Factor@ 7% | PV of Cash Flow Project B PV Factor@ 7% | PV of16 IRR Project A (in %) 13.62 17 18 0 19 (A18+1) 20 (A19+1) 21 FA20+1) 22 (A21+1) 23 (A22+1) 24 A23+1) 25 A24+1) 26 (A25+1) 2

(b) If projects A and B are independent, then both projects should be undertaken as both possess positive NPVs and hence add value to the firm undertaking the projects.

(c) If projects A and B are mutually exclusive, then the one with greater positive NPV should be undertaken as the same would add greater value to the firm undertaking the project.

Add a comment
Know the answer?
Add Answer to:
622 HW 4 MC Simulation-190212 (1) -Compatibility Mode Mailings Review View Help Tell me what you...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • MGMT335 HW3 (2) Compatibility Mode Mailings Review View Help Tell me what you want to do...

    MGMT335 HW3 (2) Compatibility Mode Mailings Review View Help Tell me what you want to do MGMT 335 HW#3 Please solve the folloving problems related to Chapter 17: Project Management 1. Based on the following AOA diagram, please answer the following question: (1) Determine the cntical path and the expected project duration (2) Determine the following quantities for each activity: the earliest start time, the latest start time, the earliest finish time and the latest finish time and the slack...

  • Statistics Exam 2 (1) Compatibility Mode gn Layout References Mailings Review View Help Tell me what...

    Statistics Exam 2 (1) Compatibility Mode gn Layout References Mailings Review View Help Tell me what you want to do AA Aa- Title x2x' A. e. || --를 :-, 2-B- 1Normal 1NoSpac Heading 1 Heading 2 Paragraph Styles Font a. rejecting a false null hypothesis rejecting a true null hypothesis C. failing to reject a false descriptive hypothesis d. failing to reject a true descriptive hypothesis 8. AType li error means that a researcher has falsely concluded that a treatment...

  • Computer lecture on going from area to score with normal distribution - Saved to this PC t References Mailings Review View Help Tell me what you want to do In our last computer assignment we leam...

    Computer lecture on going from area to score with normal distribution - Saved to this PC t References Mailings Review View Help Tell me what you want to do In our last computer assignment we leamed how to find the standard normal distribution up to the given score value a, that is we found P[Z <a). We used Excel instead of the standard nornal distribution table and evaluated P(Z<-1.72) with the command NORMDIST(1.T2B1,B2,TRUE) and we obtained 0.042716 approximately. Here Z...

  • Insert Layout References Review View Calibri (Body) Help Open in Desktop App Tell me what you...

    Insert Layout References Review View Calibri (Body) Help Open in Desktop App Tell me what you want to do U or AA. EE v 16 A A Editing B 1 Question 2: Hea Cascade Builders Inc. produces three products: A, B, and C. The following information is presented for the three products: Fixed Cost 123.500 Units produced Price Per Unit Product A 80 $ 2013 $ 90 Product B 120 $ 400 $ 150 Product 200 $ 700 $ 400...

  • Mailings Review View Add-ins Help Tell me what you want to do .E . A A .A 21 . Аавьсера | Аавьсера АаВЫС Аавьссс Аа...

    Mailings Review View Add-ins Help Tell me what you want to do .E . A A .A 21 . Аавьсера | Аавьсера АаВЫС Аавьссс Аав аавьс Normal T No Spac... Heading 1 Heading 2 Title Subtitl - - Paragraph The production department of Zan Corporation has submitted the following forecast of units to be produced by quarter for the upcoming fiscal year. 2nd Quarter 8,000 Quarter 5,000 3rd Quarter 7.000 4th Quarter 6,000 Units to be produced In addition, 6.000...

  • References Review View Help Open in Desktop App Tell me what you want 1 Α' Α'...

    References Review View Help Open in Desktop App Tell me what you want 1 Α' Α' Β Ι Ο ν Αν Α. v Ev Question 1: CNC Company's Budget and actual costs per unit are provided below for the most recent period. During this period, 600 units were actually produced. Product Standard Cost Product Actual Cost $10.00 $11.44 Materials Standard Actual Direct labour Standard Actual Variable overhead Standard Actual Total unit cost Metres 5 5.2 Hours 3 3.2 Unit Price...

  • Home Insert Draw Page Layout Formulas Data Review View Help Tell me what you want to...

    Home Insert Draw Page Layout Formulas Data Review View Help Tell me what you want to do = = ). General Calibri B I 11 . Font - A A . .A. Wrap Text Merge & Center. U $ . % * 3 Alignment Number Clipboard R14 4. A . B C D G H nter the last 4 digits of your student ID number 4 Name/s: 7 Save this file in EXCEL FORMAT as: P2 Lastname 8 Round all...

  • Please help with the following, I have already done most of them. Please verify Question1 Select...

    Please help with the following, I have already done most of them. Please verify Question1 Select one answer The histogram below displays the distribution of so ages at death due to trauma (unnatural accidents and homicides) that were observed in a certain hospital during a week. opoints 18 16 14 12 10 а» 10 20 30 40 50 60 70 80 90 Age Which of the following are the appropriate numerical measures to describe the center and spread of the...

  • 3. You are considering a number of possible system configurations where maintainability is the cr...

    3. You are considering a number of possible system configurations where maintainability is the critical factor. Each configuration has an estimated system cost and associated mean time to repair (MTTR). Construct a curve that would represent an efficient frontier and label the regions of infeasibility and inefficiency The following estimate has been created to design and build a one of a kind system Category Month 1 Month 2 Month 3 Month 4 Month 5 Month 6Standard ME ЕЕ 40/60/80 80/110/150...

  • Please help solve problem #14. Thank you! 383 Section 7.2 Estimating u When a Is Unknown In Problems 13-19, assume that...

    Please help solve problem #14. Thank you! 383 Section 7.2 Estimating u When a Is Unknown In Problems 13-19, assume that the population of x values has an approximately normal distribution 13. | Archaeology: Tree Rings At Burnt Mesa Pueblo, the method of tree-ring dating gave the following years A.D. for an archaeological excavation site (Bandelier Archaeological Excavation Project: Summer 1990 Excavations at Burnt Mesa Pueblo, edited by Kohler, Washington State University): 1275 1317 1275 1316 1268 1271 1267 1272...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT