Question

How does master production scheduling impact a material requirements plan (MRP)?

How does master production scheduling impact a material requirements plan (MRP)?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Maintenance Planning and Scheduling is one of the important sources of MRP. Material Resource Planning is the system used in automotive supply base which takes the output from master production schedule (MPS) that combines with information from inventory records & product record structure and then determines the schedule of timing & quantities for each item in line, with the philosophy of JIT to get the right material at the right time. Hence this process drives the requirement in the MRP Process. Master production scheduling process enables the make-to-stock job with carrying finished goods inventory for most of the end items and the lot size of the orders are based on Economics thereby ensuring that every item is calculated at the same time in the MRP process.

Add a comment
Know the answer?
Add Answer to:
How does master production scheduling impact a material requirements plan (MRP)?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Material Requirements Planning (MRP) Given the product tree diagram and develop a material requirements plan for...

    Material Requirements Planning (MRP) Given the product tree diagram and develop a material requirements plan for item D. A 400 unit-delivery of product P is due at the beginning of week 7. Use the worksheet Product Structure Tree Inventory Information P Order Currently Scheduled Lead Item On-Hand Recpt (wk) Time Qty LAL P 100 L4L A A FIxed Q 450 Fixed Q = 600 L4L 0 C 90 100 (wk 2) 80 (wk 2) 2 50 2 C D(2 Beg...

  • Extra Credit MRP Exercise (15 Points) Given: Indented Bill of Material Master Production Schedule (MPS) and...

    Extra Credit MRP Exercise (15 Points) Given: Indented Bill of Material Master Production Schedule (MPS) and Material Requirements Planning (MRP) Tables Bill of Material (QPA) A =Finished Good LT=1 B (1 LT-3 C(2) LT=2 D(1) LT 2 LT-2 F (2) LT-2 G (1) LT=1 Answer the following questions: 1). Fill in MPS/MRP tables provided 2). For Part Number B: What is the first period in which there is a net requirement ?:_AND, What is the net requirement Quantity (in the...

  • please solve clearly and show all steps 5. Williston Technologies wishes to use MRP methodology to developing a mat...

    please solve clearly and show all steps 5. Williston Technologies wishes to use MRP methodology to developing a material requirements plan for the next nine weeks. Williston Technologies has gathered the following information to work with: Bill of Materials: Current Inventory Records: Inventory Leadtime (in weeks) Currently Lotsize On-hand Lot-for-Lot 50 100 100 100 50 400 Master Production Schedule: -Weeks- Part 2 3 4 50 100 5 6 7 8 9 100 2500 2000 50 0 a. Using MRP methodology,...

  • The timing and size of production quantities for each product in the product family is specified...

    The timing and size of production quantities for each product in the product family is specified by the: A) master production schedule. B) material requirements plan. C) resource plan. D) scheduling plan.

  • Which of the following is not generally considered to be a benefit of MRP?                 A)   ...

    Which of the following is not generally considered to be a benefit of MRP?                 A)    the ability to keep track of material requirements                 B)    low levels of in-process inventories                 C)    a means of allocating production time                 D)    the ability to evaluate capacity requirements generated by a given master schedule                 E)     the ability to generate a feasible master schedule

  • . Canvas ©OSA The master production schedule (MPS) translates the sales & operationsplan (SOP) into: Specific...

    . Canvas ©OSA The master production schedule (MPS) translates the sales & operationsplan (SOP) into: Specific production orders Forecast demand Specific production plan Efficient lot sizes Question 25 A precedent relationship shows... The number of components required to produce an item The order in which production steps must be accomplished Only the first step of the production process Only the final step of the production process Question 26 In a material requirements planning (MRP) system, gross requirements are time phased,...

  • calculate the MRP Complete the following MRP record. All gross requirements, beginning inventory levels, and scheduled...

    calculate the MRP Complete the following MRP record. All gross requirements, beginning inventory levels, and scheduled receipts are shown. Click the icon to view the MRP record. Complete the material requirements plan (enter your responses as whole numbers). Week .A2* LT(weeks) 3 2 6 1 Gross requirements Scheduled receipts Projected ending inventory: 360 350 100 50 100 220 0 Net requirements Min. order 1 Planned receipts Planned orders ulo iMore Info Week 2 4 5 6 3 A2** Gross requirements...

  • Attempt d 1 Hour The Material Requirements Planning (MRP) system has decreased inventory levels and late...

    Attempt d 1 Hour The Material Requirements Planning (MRP) system has decreased inventory levels and late deliveries. This table displays the Forecasted Demand for the Starbucks Expresso ST-21 Machine (Model X). Complete the MRP record for End Item X using the following lot size decision rule: for a positive net requirement, order the Economic Production Quantity (EPO) of 140 units when the net requirement is less than the EPQ; otherwise, order the net requirement. The lead-time is one week. What...

  • > As Moving to another question will save this response. testion 27 Choose the correct answer...

    > As Moving to another question will save this response. testion 27 Choose the correct answer for the dependent demand items. (CLO4) (2 marks) dependent demand items overrule the Material Requirements Planning (MRP) dependent demand items drive the Material Requirements Planning (MRP) dependent demand items are the responsibilty of the Material Requirements Planning (MRP) manager dependent demand items is the perfect measure for depreciation A Moving to another question will save this response. A Moving to another question will save...

  • 1. Material requirements planning was developed for manufacturing. how might this system put to work for...

    1. Material requirements planning was developed for manufacturing. how might this system put to work for a service organization? 2. newer smaller businesses are more often observed chasing demand than leveling production. why would these businesses prefer that particular strategy? 3. what is an achilles' heel and why would a certain assumption about lead times be considered the achille's heel or MRP?

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT