Question

Which of the following is not generally considered to be a benefit of MRP?                 A)   ...

Which of the following is not generally considered to be a benefit of MRP?

                A)    the ability to keep track of material requirements

                B)    low levels of in-process inventories

                C)    a means of allocating production time

                D)    the ability to evaluate capacity requirements generated by a given master schedule

                E)     the ability to generate a feasible master schedule

0 0
Add a comment Improve this question Transcribed image text
Answer #1

The answer is option E.

MRP is preferable when dependent demand exists and MRP system focus on meeting three objectives. They are: -

  • to make sure material is available for production.
  • to make sure products are available for delivery.
  • focus on maintaining the lowest possible inventory.
Add a comment
Know the answer?
Add Answer to:
Which of the following is not generally considered to be a benefit of MRP?                 A)   ...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • . Canvas ©OSA The master production schedule (MPS) translates the sales & operationsplan (SOP) into: Specific...

    . Canvas ©OSA The master production schedule (MPS) translates the sales & operationsplan (SOP) into: Specific production orders Forecast demand Specific production plan Efficient lot sizes Question 25 A precedent relationship shows... The number of components required to produce an item The order in which production steps must be accomplished Only the first step of the production process Only the final step of the production process Question 26 In a material requirements planning (MRP) system, gross requirements are time phased,...

  • homework help 23. Below you are shown a product structure tree for end item “A.” Weekly...

    homework help 23. Below you are shown a product structure tree for end item “A.” Weekly lead time values for purchase, manufacture, and assembly activities are shown to the immediate right of each item identifier. What is the minimum length planning horizon that should be considered for master production scheduling this item? a. 23 weeks b. 5 weeks c. 8 weeks d. 6 weeks e. 7 weeks 24. Various MPS practices were discussed in class. From the following statements, identify...

  • - work force level F supply; one of these occurs ol when demand is greater than...

    - work force level F supply; one of these occurs ol when demand is greater than # - none of the other choices is correct all of - the other choices he correct - profits margine is reduced because of price cuts and discounting - cost increase because of overtime and fast freight Q) when supply is greater than demand; one of these occurs - all of the other choices are correct - none of the other choices is correct...

  • 8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 pe...

    8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 percent. C. 100 percent. D. unknown, since balance delay is not related to efficieney. E. depends on the next operation. 9. A common goal in designing process layouts is: A. minimizing the number of workers. B. minimizing number of machines. minimizing transportation costs. maximizing workstation productive time E. maximizing transportation distances. 07) vnit 10. The maximum allowable cycle time is computed...

  • Production activity control (PAC) actions take place mainly in which section of the MPC system? Because...

    Production activity control (PAC) actions take place mainly in which section of the MPC system? Because these activities change over time and react differently to different markets and strategies. MPC system is related with planning and governing all aspects of fabricating, including managing materials programing machines and people, and organization suppliers and key customers, so it is true The shop-floor control system is kept current on changes in material plans by the MRP system? (True/False) True, Yes, the shop floor...

  • please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun...

    please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...

  • please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun...

    please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...

  • 5. Which one of the following concepts is not involved when implementing total quality control? Workers being given responsibility Enforce compliance Fail-safe methods Automatic inspection Level sche...

    5. Which one of the following concepts is not involved when implementing total quality control? Workers being given responsibility Enforce compliance Fail-safe methods Automatic inspection Level schedule the factory 14. Which one of the following are suggestions for developing a focus forecasting system? Use a seasonality index. Keep rules simple. Keep the people using the forecasts separate from those who make the forecasts. The faster the growth, the higher the tracking signal. Set control limits that will keep the forecasters...

  • Materials Requirements Planning (MRP) Franklin Fan’s two most profitable products are the ceiling fan (CF151) and...

    Materials Requirements Planning (MRP) Franklin Fan’s two most profitable products are the ceiling fan (CF151) and the personal fan (PF032). With the rising popularity in home remodeling and personal comfort, Franklin Fan has enjoyed substantial demand for these two products. Last year, Kathryn Marley, the vice president of operations and supply chain management, approved the installation of a new MRP system. It is a first important step toward the eventual goal of a full-fledged ERP system. Marley worked closely with...

  • Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read a...

    Analytics Exercise 9-1 Recently, Phil Harris, the production control manager at Brunswick, read an article on time-phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time phased requirements planning.      Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT