Power economic schedule, economic dispatch question
Power economic schedule, economic dispatch question Problem 02) The system to be studied consists of two...
Economic dispatch. The fuel cost function in dollars / hour of two thermal plants is C1=320+6.2 P1+0.004 P1^2 C2=200+6.0 P2+0.003 P2^2 where P1 and P2 are in MW. Plant outputs are subject to the following constraints: 50 ≤ P1 ≤ 250 50 ≤ P2 ≤ 350 On a 100MVA base, the per unit real power loss is PL = 0.0125 P1^2+ 0.00625 P2^2 The total load is 412.35MW. Determine the optimal dispatch of generation.
a) The fuel costs of two operating units are as follows: c1=0.05P12 + 25p1+400 US$/hr c2=0.1P22 + 25p2+350 US$/hr If given that the minimum and maximum powers are 10MW and 1000MW for each unit, compare the cost of the allocation of generation(dispatch) through an optimal strategy against an equal-share of generation strategy for a load of 100MW. Hence calculate the net loss/gain of the optimal strategy against the equal-share strategy b) The load for the power system consisting of two...
Consider two generating units with input-output curves Unit 1: coal-red steam unit: H1 (P1) = 500 + 8P1 Unit 2: gas turbine: H2 (P2) = 210 + 7P2 and operating limits Unit 1: 150< P1 < 500 MW Unit 2: 100 < P2 < 250 MW Suppose the fuel costs are Coal: $3.50/MBtu Gas: $2.50/MBtu and the load is L = P1 + P2 = 600 MW. Both units are on so that unit 1 must supply at least 150...
Please do problem #2. I posted both problems 1 and 2 because problem 2 is based on problem 1. Please do part a,b and c. Label each part clearly (5 points) Given below are the cost curves of 5 generators which are to supply a load of 750 MW: 1. fi -0.01 Pa2+2 Pa+50 f 0.005 P24 P2 +200 f 0.0075 P+1.5 Pe3 +10 S/h f4-0.04 Pgs 0.5 P4+ 150 fs-0.003 P +3 Pgs+ 12S/h S/h S/h S/h Assume that...
The solution to the problems includes detailed explanation, presentation and discussion of results. It is recommended to solve the problem through GAMS, Matlab, etc. PROBLEMS 5.1 Three units are on-line all 720h of a 30-day month. Their characteristics are as follows: H, = 225+8.47P, +0.0025P,?, 50 SP, S 350 H, = 729+6.20P, +0.0081P2, 50 5 P, S 350 H, = 400+ 7.20P, +0.0025P², 50 P, S 450 In these equations, the H. are in MBtu/h and the P. are in...
Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...
I need help to solve this questions about Generator Governor Droop and Transmission Line. A complete solutions with answers would be great. Thank you Generation Question 1 to 5 relate to the following grid connected generator. A governor-controlled, steam-driven 450 MW synchronous generator with 5% droop is synchronized to the 60 Hz grid and its load set-point adjusted to deliver 300 MW to the grid. Q1. (a) 000 What is the actual droop of the generating unit? 0.0225 Hz/MW (b)...
#8 7. Suppose that Sam's Cat Hotel in the problem above uses a P system instead of a system. The average daily demand is d = 96/6 = 16 bags, and the standard deviation of daily demand is 0, od = 16 = To = 6.142 bags "week_15 a. What P (in working days) and T should be used to approximate the cost trade-offs of the EOQ? b. How much more safety stock is needed with a P system than...
1. 1. The primary energy savings in tep (1 MWh -0.086 tep) and diesel, which involves the direct use of heat from a geothermal resource to cover a heat demand of 100 kW for 3,500 h / year, assuming that this demand will be covered with diesel boiler of average yield 0.8 (for diesel 1.12 tep/ton gas oil), they are: a) 30.1 tep/year, 26.9 ton/year b) 37.6 tep/year, 33.6 ton/year c)41.2 tep/year, 36.8 ton /year 1. 2. A hydraulic pump...
I need help with the attached assignment. I attached the question and completed assigment. I just need help with answering one more question which is which is: Discuss a strategy that you would use to communicate the status of the project to stakeholders? Project Monitoring and Control Assignment Complete the following items for this assignment: 1. Read through the Case 13.1 Tree Trimming Project Case in Larson and Gray. Respond to Questions 1 and 2 of the case. Use Microsoft...