Question

o) This high performing solar panel by SunForce is 24 by 54. Its maximum power output is 100W when placed under full noon s
0 0
Add a comment Improve this question Transcribed image text
Answer #1

A 0,836 m2 But the panels maxi mum outut is loo w efficience,--1036. x 100 so, loo Cl 11.96 12

Add a comment
Know the answer?
Add Answer to:
o) This high performing solar panel by SunForce is 24" by 54". Its maximum power output...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • (3) Solar power for a house 03 W/m2. Sunlight arriving at the surface of the earth has an intensity of about l The roof of a house is 30 ft by 60 ft in size. what is the maximum power arriving at...

    (3) Solar power for a house 03 W/m2. Sunlight arriving at the surface of the earth has an intensity of about l The roof of a house is 30 ft by 60 ft in size. what is the maximum power arriving at the roof? (Hint: This will be at noon with the sun directly overhead.) Estimate the average power during daytime on a clear day having 12 hours of daylight (sunrise to sunset) Estimate the average power over a complete...

  • 4. Solar power (15 points). This problem leads you through some basic aspects of solar power....

    4. Solar power (15 points). This problem leads you through some basic aspects of solar power. a) (5pt) Imagine a giant sphere with a radius of 1AU surrounding the Sun. What is the surface area of this sphere, in units of m2? b) (5pt) Calculate the solar power passing through each square meter of this imaginary sphere in units of watts/m2 c) (5pt) If we wanted to power all the electric consumption of an average household in Alberta (The average...

  • Need helps on parts B, C, E,and F Costs of installing rooftop solar PV : Calculate...

    Need helps on parts B, C, E,and F Costs of installing rooftop solar PV : Calculate out-of-pocket costs and payback time for a rooftop solar installation. Assume that this PV system measures 6 m x 5 m and that the panels are 20% efficient. (a) Peak power rating: The solar industry describes the “peak wattage” of a PV system as its power output at a hypothetical, industry-standard irradiance of 1000 W/m2. What would be the peak wattage (in W) of...

  • Problem 24.1: please help!! Solar Thermal Energy 462 onsider a solur thermal elecinic plant built using a system of 2D...

    Problem 24.1: please help!! Solar Thermal Energy 462 onsider a solur thermal elecinic plant built using a system of 2D concentrators that reflect sunight to a system of pipes carrying molten salt with concentration C # 200. Example 24.5 2D Concentrator Efficiency Optimization Wher is the optimal efficiency poxsibie (essaming an onbient temperoture of 300 K and incident sunight u 1000 W/r)? Solving eq (24.23) un encany gives 818 K At this temperature. Cartot efficiency is approximately 63% and about...

  • Fields on the Page Estimate the maximum magnitudes of the electric and magnetic fields of the...

    Fields on the Page Estimate the maximum magnitudes of the electric and magnetic fields of the light that is incident on a page because of the visible light coming from your desk lamp. Treat the lightbulb as a point source of electromagnetic radiation that is 6% efficient at transforming energy coming in by electrical transmission to energy leaving by visible light. SOLUTION Conceptualize The filament in your lightbulb emits electromagnetic radiation. The brighter the light, the larger the magnitudes of...

  • My Courses Week 2 Assignment(s) Week 2 Assignment(s) Assignment 2 Power Markets have two subcateg...

    My Courses Week 2 Assignment(s) Week 2 Assignment(s) Assignment 2 Power Markets have two subcategories: generation and grid ancillary services (page 113). Text box 2-2a (page 101) describes grid ancillary services and text box 2-2b (page 102) describes essential reliability services. Create a table which lists the grid ancillary services with services as the rows and resources (hydropower, solar, and wind) as columns. In the respective row/column box summarize if the resource can provide the service, with a bottom line...

  • A retaining wall is to be constructed in a normally consolidated clayey sand deposit in the...

    A retaining wall is to be constructed in a normally consolidated clayey sand deposit in the figure below. Ground water table is lmbelow the bottom of the excavation. A 20 kN/m2 surcharge pressure is applied over a wide area at the ground surface. Assume the wall moves into the excavation. Consider long-tem analysis (as it is usually the more critical analysis in excavation problems). Ignore capillarity as shown 20 kPa Clayey sand T17 kNm Y-20 kNm 5 m c'-10 kPa...

  • need ans for the following questions, the last 3 pages for more info. Questions: more info:...

    need ans for the following questions, the last 3 pages for more info. Questions: more info: expermint e/m avr=1.71033*10^11 7 2 points of the following options, which conditions for V or I produce the largest radius of the electron beam path r? Hint: Use e/m= 2V (5/4)*aP/(Nuo Ir) Maximum land Maximum V O Maximum land Minimum V Minimum I and Maximum V Minimum I and Minimum V 8 2 points By what factor will change if the radius of the...

  • summarizr the followung info and write them in your own words and break them into different...

    summarizr the followung info and write them in your own words and break them into different key points.   6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT