My Courses Week 2 Assignment(s) Week 2 Assignment(s) Assignment 2 Power Markets have two subcategories: generation and grid a
Text Box 2-2a. Grid Ancillary Services Relevant to Hydropower Regulation and frequency response: The ability of a resource or
Text Box 2-2b Essential Reliability Services: Grid Services Designated As Critical to National Power System Reliability in it
My Courses Week 2 Assignment(s) Week 2 Assignment(s) Assignment 2 Power Markets have two subcategories: generation and grid ancillary services (page 113). Text box 2-2a (page 101) describes grid ancillary services and text box 2-2b (page 102) describes essential reliability services. Create a table which lists the grid ancillary services with services as the rows and resources (hydropower, solar, and wind) as columns. In the respective row/column box summarize if the resource can provide the service, with a bottom line response of yes, no, or 'it depends'.
Text Box 2-2a. Grid Ancillary Services Relevant to Hydropower Regulation and frequency response: The ability of a resource or a system to respond to to determine optimal use of hydropower for changes in system frequency, which must be load-following services, these impacts must be maintained close to a constant level (60 Hertz). considered against the cost of providing load NERC establishes control performance stan- following from other types of generation. dards to ensure that each control area main tains reliability. This response can be provided by generators through three mechanisms: costs and decrease system lifetime. In order Energy imbalance service: The transmission operator provides energy to cover any mis- match in hourly energy between the transmis Inertia: A passive response, typically due to sion customer's energy supply and the demand rotating masses in generators that is served in the balancing authority area. Primary frequency response or governor Spinning reserve: Online (connected to the control: An active, unmanned respon grid) generation that is reserved to quick implemented through an electronic, digital, respond to system events (such as the loss o or mechanical device a generator) by increasing or decreasing Frequency regulation: An active response to output. Except when already running at full adjust an area's generation from a centralload, hydropower offers an excellent source location in order to maintain the area's inter- reserve because it has high ramping capability change schedule and frequency throughout its range Hydropower generators can provide these reg Supplemental (non-spinning) reserve: Offline ulation services. While hydropower turbines are generation that is capable of being connected able to respond to sudden changes in system within a specified period (usually 10 minutes) frequency, the relatively large mass rotating in response to an event in the system. Offline in hydropower turbine generators and the dynamics of the water column in the penstock nizing quickly, and can provide non-spinning mean hydropower may have a lower response reserve to the extent that sufficient water time than do gas or steam [75. This larger inertia can, however, be an advantage in smaller or islanded power systems as it contributes to system stability [76). Load-following and flexibility reserve: The equipment Insufficient provision of reactive ability of the power system to balance variabil power can lead to voltage collapses and ity existing in the load over longer timeframes system instability. All hydropower facilities are than regulation and frequency response, from operated to follow a voltage schedule to ensure multiple minutes to several hours. This func- tion is typically accomplished by mid-mer (intermediate) and peaker units. Most US. hydropower units are able to and do effectively ability to provide reactive power in such loca- provide load following to an hourly schedule, tions can be essential. as well as following ramps that occur within the hour time scale. This flexibility is not without impact, however. Increased variation in hydro- power generation can impact and aquatic life, as well as increase operating and can typically be hydropower generation is capable of synchro- supply is available to the unit for generation. Reactive power and voltage support: The portion of electricity that establishes and sustains the electric and magnetic fields of AC sufficient voltage support. Reactive power is typically a local issue. Because hydropower facilities are often located in remote areas, their Black start (restoration) service: The capabil- ity to start up in the absence of support from the transmission grid. This capability is of value riverbank erosion to restart sections of the grid after a blackout
Text Box 2-2b Essential Reliability Services: Grid Services Designated As Critical to National Power System Reliability in its role as the Organiza- tion of the United States, NERC has designated the first to manifest, we see other issues such the services of frequency response, ramping,as inertia beginning to emerge and voltage support as essential to reliable operation of the national power grid e Electric Reliability Organizasupport. While these three services are among For this reason, policy makers need to include provisions for essential reliability services of In December 2015, NERC issued its "Essential the grid: ramping, frequency control, voltage Reliability Services Task Force Measures Framework Report," (791 to help stakeholders and policymakers understand and prepare for ERS are necessary to balance and maintain a changing energy resource mix. Subsequently, the North American BPS [bulk-power NERC issued a public statement nos) empha- system]. Conventional generation (steam sizing key points regarding essential reliability hydro, and combustion turbine technologies) services: control, and also to address emerging issues such as inertia inherently provides ERS needed to reliably operate the system North America's resource mix is undergoing a significant transformation at an acceleratedIt is necessary for policy makers to recognize pace with ongoing retirements of fossil-fired and nuclear capacity and growth in natural gas, wind, and solar resources. A key priority for our energy future is to ensure that reliability is maintained as the generation resource mix changes NERC has identified three essential reliability services (ERS) that warrant attention- frequency response, ramping, and voltage the need for these services by ensuring that interconnection requirements, market mechanisms, or other reliability requirements provide sufficient means of adapting the system to accommodate large amounts of variable and/or distributed energy resources (DERS). Policy makers are increasingly recognizing these needs, which will become more significant as larger penetrations of renewables and retirements of base load coal (and some nuclear) occur
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solar wnd YES Load follouonr | YES lexibiluly Reserve Energy mlnt YES YES It DEPENDS tr DEPEND HOERENDS spiningeserve YES NoEneray Imbalance service- It mot depends only en thest teres fao but other fachs aloo. suppes all tre trie (ty dopou Selav &

Add a comment
Know the answer?
Add Answer to:
My Courses Week 2 Assignment(s) Week 2 Assignment(s) Assignment 2 Power Markets have two subcateg...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Q3. (30 marks in total) A) Four generator units (two 500MW and two 600MW, as at Liddel Power Stat...

    Q3. (30 marks in total) A) Four generator units (two 500MW and two 600MW, as at Liddel Power Station) are connected to the same grid. All generators have 4% droop characteristics. How will they share a sudden load increase by 300MW? By how much (in Hz) will the grid frequency change as the result of this load increase? (15 marks) A big industrial load is connected to a 1.0 pu bus via a feeder. The load has 0.85 power factor...

  • solve part D,E,F Assignment Description @ (Case studies & Basic calculation) Note: 3 to 4 students...

    solve part D,E,F Assignment Description @ (Case studies & Basic calculation) Note: 3 to 4 students in a group only. The generation, delivery, and utilization of electric power and energy remain one of the most challenging and exciting fields of electrical engineering. The astounding technological developments of our age are highly dependent upon a safe, reliable, and economic supply of electric power. Describe your understanding on comprehensive coverage of the generation, transformation, transmission, distribution, and utilization of electric power. The...

  • Steam-driven power generators rotate at a constant speed via a governor that maintains constant s...

    Steam-driven power generators rotate at a constant speed via a governor that maintains constant steam pressure in the turbine. In addition, automatic generation control (AGC) or load frequency control (LFC) is added to ensure reliability and consistency despite load variations or other disturbances that can affect the distribution line frequency output. A specific turbine- governor system can be described only using the block diagram below, in which G (s)- Gg (s)G(s)Gm(s), where is the governor's transfer function 0.2s+1 G.(s)s the...

  • Ture or False questions, please provide explantions. Q4.5 In per unit system, all the formulas are devoid of the factor \3. Q4.6 When adequate information is lacking, it is not unreasonable to take 4...

    Ture or False questions, please provide explantions. Q4.5 In per unit system, all the formulas are devoid of the factor \3. Q4.6 When adequate information is lacking, it is not unreasonable to take 400 ohms as the surge impedance of a 132 kV transmission line. Q4.7 When a power system suddenly loses some generation, the frequency goes down Q4.8 In ABCD parameters of transmission lines, A-D for any type of modelling Q4.9 In ABCD parameters of transmission lines, AD-BC-0 for...

  • I need help to solve this questions about Generator Governor Droop and Transmission Line. A complete...

    I need help to solve this questions about Generator Governor Droop and Transmission Line. A complete solutions with answers would be great. Thank you Generation Question 1 to 5 relate to the following grid connected generator. A governor-controlled, steam-driven 450 MW synchronous generator with 5% droop is synchronized to the 60 Hz grid and its load set-point adjusted to deliver 300 MW to the grid. Q1. (a) 000 What is the actual droop of the generating unit? 0.0225 Hz/MW (b)...

  • CODE 102_8 Welding Many welding processes require the application of heat and/or pressure to produce a...

    CODE 102_8 Welding Many welding processes require the application of heat and/or pressure to produce a suitable bond between the two parts being joined. There are a number of conventional and commercially practiced welding processes, which possess limitations in relation to material type and thickness, and in addition, the cost analysis may not allow for a process to be used on a specific application. The selection of suitable welding consumable (electrode or wire) is also an important factor in producing...

  • (might be 1 or 2, MCQ questions were having images given with them, which we couldn't...

    (might be 1 or 2, MCQ questions were having images given with them, which we couldn't insert, so ignore those questions if you cannot answer, sorry for inconveinience created, i tried to delete them but might be couldn't done all) 3) Single phase induction motors work because: a) The oscillating magnetic field can induce starting torque in a rotor. b) The oscillating magnetic field can induce running torque in a rotor. c) A capacitance or inductance can create the phase...

  • I need help with my very last assignment of this term PLEASE!!, and here are the instructions: After reading Chapter T...

    I need help with my very last assignment of this term PLEASE!!, and here are the instructions: After reading Chapter Two, “Keys to Successful IT Governance,” from Roger Kroft and Guy Scalzi’s book entitled, IT Governance in Hospitals and Health Systems, please refer to the following assignment instructions below. This chapter consists of interviews with executives identifying mistakes that are made when governing healthcare information technology (IT). The chapter is broken down into subheadings listing areas of importance to understand...

  • summarizr the followung info and write them in your own words and break them into different...

    summarizr the followung info and write them in your own words and break them into different key points.   6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT