Assume that a manufacturing company works five days per week, a supplier for a part has a lead-time of 3 days and the daily demand for the part is 120 items with standard deviation of 23.5 items. If the company wants to use a 97% service level (3% stock-out situation allowed), what would be the required safety stock and ROP

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Because only demand is variable(i.e has a standard deviation), formula R= dLT + Z0, VLT is appropriate ū = demand rate = 120

Add a comment
Know the answer?
Add Answer to:
Assume that a manufacturing company works five days per week, a supplier for a part has...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Your factory manufactures tricycles. You need to purchase front wheels from the supplier. The expected annual...

    Your factory manufactures tricycles. You need to purchase front wheels from the supplier. The expected annual demand (D) is 1300 units; the setup or ordering cost (S) is $8 per order, and the holding cost per unit per year (H) is $0.50.   Determine optimal number of wheels to order Determine the reorder point (ROP) (without safety stock) assuming that the lead time (L) is 4 days and your factory works 250 days a year. Based on your answer in (b),...

  • X-25 Item is an important part used in the production of Laptops. Daily use of Item...

    X-25 Item is an important part used in the production of Laptops. Daily use of Item X-25 in a high-tech Manufacturing Process during the Delivery or Lead time for Item X-25 is 4 working days is given below: 1) Avg Daily Use = 200 2) Maximum Daily Use = 230 3) Minimum Daily Use = 160 and SD = +/- 20 SD = Standard Deviation Calculate the Reorder Point (ROP) for X-25 with the Safety Stock (SS) at 97% Service...

  • 2. We know that Blue Pad Company’s lead time L is one week, and demand rate...

    2. We know that Blue Pad Company’s lead time L is one week, and demand rate is 100 units per week. Compute the amount of Safety Stock and new ROP assuming that the company desires a 98% service level. Standard deviation of demand over lead time is eight.

  • The demand at Charlottetown’s Queen Elizabeth Hospital for a specialized surgery pack is 70 per week....

    The demand at Charlottetown’s Queen Elizabeth Hospital for a specialized surgery pack is 70 per week. The lead time from McKesson, its main supplier, is normally distributed, with a mean of five weeks for this product and a standard deviation of two weeks. A 95% weekly service level is desired. Find the ROP. Note: Round your final answer to the nearest integer.

  • The demand at Charlottetown’s Queen Elizabeth Hospital for a specialized surgery pack is 70 per week....

    The demand at Charlottetown’s Queen Elizabeth Hospital for a specialized surgery pack is 70 per week. The lead time from McKesson, its main supplier, is normally distributed, with a mean of five weeks for this product and a standard deviation of two weeks. A 95% weekly service level is desired. Find the ROP. Note: Round your final answer to the nearest integer.

  • Rich Hotel distributes a mean of 1,000 bath towels per day to guests at the pool...

    Rich Hotel distributes a mean of 1,000 bath towels per day to guests at the pool and in their rooms. This demand is normally distributed with a standard deviation of 100 towels per day, based on occupancy. The laundry firm that has the linens contract requires a 2-day lead time. The hotel expects a 98% service level to satisfy high guest expectations. a. What is the safety stock needed to meet this service level? b. What is the ROP? c....

  • 7. A shop has a demand for water is approximated by a normal distribution with a...

    7. A shop has a demand for water is approximated by a normal distribution with a mean of 31 gallons per week and a standard deviation of 4 gallons per week. The manager desires a service level of 90 percent. The lead time is three days, and the shop opens seven days a week. (9 marks) a. If an ROP model is used, what ROP would be consistent with the desired service level? b. If a fixed-interval model is used,...

  • Demand for walnut fudge ice cream at the Sweet Cream Dairy can be approximated by a...

    Demand for walnut fudge ice cream at the Sweet Cream Dairy can be approximated by a normal distribution with a mean of 21 gallons per week and a standard deviation of 3.5 gallons per week. The new manager desires a service level of 90 percent. Lead time is 3 days, and the dairy is open seven days a week. (Hint: Work in terms of weeks.) If we use periodic inventory system, the time from delivery of an order until next...

  • A restaurant that is open 7 days per week experiences level demand throughout the year. The...

    A restaurant that is open 7 days per week experiences level demand throughout the year. The average annual demand for disposable napkins, which costs $0.20 apiece,is 45000per year. The annual holding cost rate 10% and the ordering cost is estimated to be $25per order. The forecast CV is of 15%and the lead time from order to receipt is 2days. A cycle service level of 98% is targeted. Calculate the optimal order quantity and the reorder point (ROP).

  • 13.38. Kelly's Tavern serves Shamrock draft beer to its customers The daily demand for beer is normally distrib...

    13.38. Kelly's Tavern serves Shamrock draft beer to its customers The daily demand for beer is normally distributed, with an average of 20 gallons and a standard deviation of 4 gallons. The lead time re- quired to receive an order of beer from the local distributor is 12 days. Determine the safety stock and reorder point if the restaurant wants to maintain a 90% service level. What would be the increase in the safety stock if a 95% service level...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT