Question

120 Power System Analysis 3.12. A single-phase system similar to that shown in Figure 3.11 has two transformers A-B a B-C con

solve no: 3.14 , 3.16, 3.19

please show each step and solve for beginners

Transformers and Synchronous Machines 121 3.19. Figure 3.20(a) shows a three-phase generator supplying a load through a three

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
solve no: 3.14 , 3.16, 3.19 please show each step and solve for beginners 120 Power...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • INTRODUCTION TO POWER SYSTEM

    1. The one-line diagram of a three-pha  se power system is shown in Figure 3.29. Select a common base of 100 MVA and 15 kV on the motor side. Draw an impedance diagram with all impedances including the load impedance marked in per-unit. The manufacturer's data for each device is given as follow:The three-phase load at bus 4 absorbs 57 MVA, 0.6 power factor lagging at 10.45 kV. Line 1 and line 2 have reactances of 48.4 Ω and 65.43...

  • Power Generation

    Figure shows a one-line diagram of a three-phase system. Assume that the line length between the two transformers is negligible and the three-phase generator is rated 4160 kVA, 2.4 kV, and 1000 A and that it supplies a purely inductive load of Ipu = 2.b8∠−90° pu. The three-phase transformer T1 is rated 6000 kVA, 2.4Y−24Y kV, with leakage reactance of 0.04 pu. Transformer T2 is made up of three single-phase transformers and is rated 4000 kVA, 24Y−12Y kV, with leakage...

  • Styles AC Bus Local Loads T: OC Bus PV Generating DC/AC Station Zline Local Power Grid...

    Styles AC Bus Local Loads T: OC Bus PV Generating DC/AC Station Zline Local Power Grid Inverter T1 T2 Figure Q2 In the microgrid in figure Q2, a solar PV station and the local power grid supply a series of local loads The PV generating station is rated at 2 MW and is operating at unity power factor. The PV station internal impedance is purely resistive equal to 50% based on its own rating of 2 MVA. The inverter DC...

  • A balanced Y-connected voltage source is applied to a balanced A-connected load with Zad (45-j30) ohm/phase...

    A balanced Y-connected voltage source is applied to a balanced A-connected load with Zad (45-j30) ohm/phase connected, 150 kVA transformer. According to the rating of the transformer, which is on a reactance of the transformer is j0.8 per unit (ignore the magnetizing branch impedances) LOAD 13.2kV 480V Z j0.8 pu a) Utilizing a three-phase Stue of 100 kVA and transformer voltages as bases, draw the single phase b) What does the voltage (V) at the source to need to be...

  • Problem 4 Three ideal single-phase transformers are connected in a delta/wye configuration with the primary side of the...

    Problem 4 Three ideal single-phase transformers are connected in a delta/wye configuration with the primary side of the three-phase transformer rated at 120 kV and the secondary side rated at 13.8 kV. The rated power of the transformer bank is 20 MVA. One side of the transformer bank is connected to a 120 kV transmission line, and the other side is connected to a three-phase load of 15 MVA at 0.85 lagging power factor. Compute the following: a) The turns...

  • note that 1) single phase system 2) base values at transmission line circuit A 100 MVA,...

    note that 1) single phase system 2) base values at transmission line circuit A 100 MVA, 12 kV Single-phase generator has a sub transient reactance of 20%. The generator supplies a two synchronous motors over 25-km transmission line having transformers at both ends. The motors, all rated 6.0 kV, 66 MVA and 50 MVA for Mi and M2, respectively. For both motors X" = 15%. The single phase transformer T is rated 150 MVA, 132/12 kV with leakage reactance of...

  • 2. In order to meet an emergency, three single-phase transformers rated 100 kVA (each), 13.2 kV/2.4...

    2. In order to meet an emergency, three single-phase transformers rated 100 kVA (each), 13.2 kV/2.4 kV are connected in Y-∆ on a 3-phase, 20 kV line. a. What is the maximum load that can connected to the transformer bank? b. What is the outgoing line voltage?

  • Fig Qshows the one-line diagram of a three-phase power system. As shown in Fig. Q3. the...

    Fig Qshows the one-line diagram of a three-phase power system. As shown in Fig. Q3. the two zones are connected by a 400 MVA, 240-kV/24-kV, Ý-A three phase transformer. The Y-A three phase transfonmer has an equivalent series impedance of ZTH - 1.2 + j1.6n per phase referred to the high voltage side (primary side). The three-phase power system can be studied with per unit quantities using base values of S-500 MVA and 240 kV in zone 1. By using...

  • Solvein pu sysvem 2-10. A 13,800/480 V three-phase Y-A-connected transformer bank consists of thr...

    please solve the question in pu sysyem !!!! Solvein pu sysvem 2-10. A 13,800/480 V three-phase Y-A-connected transformer bank consists of three identical 100-kVA 967/480-V transformers. I is supplied with power directly from a large constant-voltage bus. In the short-circuit test, the recorded values on the high-voltage side for one of these transformers are Isc 12.6 A Pc3300 w (a) If this bank delivers a rated load at 0.85 PF lagging and rated voltage, what is the line-to-line voltage on...

  • Q1) Two ideal voltage sources designated as machines 1 and 2 are connected as shown in...

    Q1) Two ideal voltage sources designated as machines 1 and 2 are connected as shown in Figure 1. If E! = 100.200 V, E-100し300 V and Z = 0 +JS a) Determine whether each machine is generating or consuming real power and the amount b) Determine whether each machine is receiving or supplying reactive power and the amount c) Determine the P and Q absorbed by the impedance 2 #2 Figure 1: Ideal voltage sources connected through impedance Z Q2)...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT