Question

The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there...

The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there are a sequence of assembly steps performed by five workers. Each worker does two tasks. Workers are paid $15 per hour.

Worker Task Time (seconds)
A T1 40
A T2 25
B T3 20
B T4 15
C T5 10
C T6 15
D T7 10
D T8 20
E T9 25
E T10 35
Instruction: Round "cost of direct labor" and "average labor utilization" to 2 decimal places. Round "target manpower" and "capacity of the process" to 1 decimal place.
a. What is the labor content of a toothbrush (seconds)?
b. What is the cost of direct labor for a toothbrush ($)?
c. What is the utilization (as a percent) of worker A?
d. What is the average labor utilization of this process?
e. Suppose demand is 40 toothbrushes per hour. What is the takt time (seconds)?
f. Suppose the takt time is 50 seconds. What is the target manpower?
g. Suppose one additional employee could be hired. The new employee can be assigned to the same set of tasks as one of the current workers. For example, the new worker
could do tasks 1 and 2 (like worker A) or tasks 7 and 8 (liker worker D). What would be the capacity of the process (toothbrushes per hour) after hiring the new worker? toothbrushes per hour
h. Suppose the company changes the assignment of tasks to workers to maximize its capacity. Each task is still
assigned to one worker and each worker is still assigned consecutive tasks. What would be the capacity of the process (toothbrushes per hour)? toothbrushes per hour
i. Suppose the company changes the assignment of tasks to workers to maximize its capacity. tasks can be assigned to multiple workers and workers can be assigned
nonconsecutive tasks. What would be the capacity of the process (toothbrushes per hour)? toothbrushes per hour
0 0
Add a comment Improve this question Transcribed image text
Answer #1

labor content = sum of the time taken by all tasks = 215 sec

Hourly Output of different steps

worker A = 3600/ 65 =55.38

worker B = 3600 /35 =103

worker C =3600/ 25 =144

worker D = 3600 /30 =120

worker E =3600/60 =60

Process is constrained by the worker A which has the lowest output of 55.38 per hour

b. Direct labor cost = cost incurred / toothbrushes produced = 15x5 /55.38 = 1.354

c.Utilisation of person A = 1= 100%

d Utilisation of B = 55.38/103 =0.5376

Utilisation of C = 55.38/144 = 0.3845

Utilisation of D = 55.38 / 120 =0.4615

Utilisation of E = 55.38 /60 =0.923

average of these numbers ( A to E) = 0.6613

e.takt time = time available / units to be produced = 60/40 =1.5 min

f For takt time of 50, the hourly output should be 3600/50 =72

resources needed at different steps would be

T1+T2 =2

T3+T4 =1

T5+T6 =1

T7+T8 =1

T9+T10 =2

total = 7

g. Bottleneck A would be the right place for the new worker, which will double the capacity of this step. However, the new bottleneck will now be E which will have capacity of 60 per hr.

h. The step with 40 sec is the longest one. It can be combined with either step having time 25 sec ( as before) or 35 sec. The earlier arrangement is better. The capacity would remain the same.

i the highest time 40 needs to be combined with lowest number which is 10. It gives a task time of 50. It is not possible to find a highest combination which is less than 50. Hence the capacity

= 3600/50 = 72 per hour

Add a comment
Know the answer?
Add Answer to:
The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there...

    The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there are a sequence of assembly steps performed by five workers. Each worker does two tasks. Workers are paid $24 per hour. Time (seconds) Task Worker T1 A 51 A T2 44 В тЗ 10 В T4 13 C Т5 29 C T6 14 T7 20 D T8 17 Е T9 44 Е T10 38 Instruction: Round "cost of direct labor" and "average labor utilization"...

  • Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services...

    Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (12 minutes). Activity 2: Wash and condition hair (12 minutes). Activity 3: Neck, shoulder, and back stress-release massage (12 minutes)....

  • Imagine US is a startup that offers high-definition 3-D prenatal ultrasounds for high-end customers. The service...

    Imagine US is a startup that offers high-definition 3-D prenatal ultrasounds for high-end customers. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses):Activity 1: Welcome a patient and explain the procedure. (7 minutes)Activity 2: Prep the patient (e.g., show them to the room, apply ultrasound gel). (3 minutes)Activity 3: Take images. (14 minutes)Activity 4: Analyze images. (9 minutes)Activity 5: Discuss diagnostic with patient. (23 minutes)They...

  • Consider the following tasks that must be assigned to four workers on a conveyor--paced assembly line (i.e., a machine--...

    Consider the following tasks that must be assigned to four workers on a conveyor--paced assembly line (i.e., a machine--‐paced line flow). Each worker must perform at least one task. Time to Complete Task (seconds): Task 1: 26 Task 2: 25 Task 3: 15 Task 4: 24 Task 5: 15 Task 6: 20 Task 7: 47 Task 8: 15 Task 9: 20 Task 10:25 Task 11: 15 Task 12: 20 The current conveyor--paced assembly-‐line configuration assigns the workers in the following...

  • PA 4-4 (Algo) Mr. K's is a very popular hair salon. It... Mr. K's is a...

    PA 4-4 (Algo) Mr. K's is a very popular hair salon. It... Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (9 minutes). Activity 2: Wash and condition hair...

  • Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services...

    Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (11 minutes). Activity 2: Wash and condition hair (11 minutes). Activity 3: Neck, shoulder, and back stress-release massage (11 minutes)....

  • Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the...

    Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (50 sec.): The plastic tube for the frame is cut to size. Step 2 (40 sec.): The tube is put together. Step 3 (55 sec.): The frame...

  • Charles Lackey operates a bakery in Idaho Falls, Idaho. Because of its excellent...continues

    Charles Lackey operates a bakery in Idaho Falls, Idaho. Because of its excellent product and excellent location, demand has increased by 25% in the last year. On fartoo many occasions, customers have not been able to purchase the bread of their choice. Because of the size of the store, no new ovens can be added. As a staffmeeting, one employee suggested ways to load the ovens differently so that more loaves of bread can be baked at one time. This...

  • Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reas...

    Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parenthesis):Activity 1: Welcome a guest and offer homemade herb tea. (10 minutes)Activity 2: Wash and condition hair. (10 minutes)Activity 3: Neck, shoulder, and back stress release massage. (10 minutes)Activity 4: Design...

  • Part I – Process and Capacity Analysis Mortgage, Inc. processes loan applications in a “back-office” service...

    Part I – Process and Capacity Analysis Mortgage, Inc. processes loan applications in a “back-office” service facility. Each loan application must undergo a sequence of three separate processing activities before Mortgage, Inc. can make a decision to approve or decline the application. That is, a loan application first passes through Activity 1, then Activity 2, and finally Activity 3. Each activity has a fixed number of workers (given below). For example, there are three workers assigned to Activity 1 and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT