Question

Please show all steps. DATA CENTER REDESIGN You are a data center manager and have been...

Please show all steps.

DATA CENTER REDESIGN You are a data center manager and have been asked by your boss to redesign a telecommunications room in one of your smaller facilities. One element of this redesign you would like to optimize is the rack structure – your goal is to provide the greatest amount of equipment storage (by weight) within the cost constraints of the project. There are two types of storage racks you can choose from. Rack A costs $400 per unit, requires three square feet of floor space, and can support up to 80 pounds of equipment. Rack B costs $800 per unit, requires four square feet of floor space, and can support up to 120 pounds of equipment. Your budget for this aspect of the project is $5600, though of course you don’t have to spend all of it. Additionally, you can allocate at most 36 square feet of floor space to the racks in this room. How many of each type of rack should you buy in order to maximize the amount of equipment that could be supported?

1.    What are your variables for this project? Assign each a letter and describe them in words.

2.    What is the objective function you are being asked to maximize? Assign it a variable, define it in words, and provide an equation for it using the variables you defined above.

3.    There are four constraints for this problem (hint: one is for the cost of the racks, one is for floor space, and two other ‘natural’ constraints). Write these four constraints in equation form

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Please show all steps. DATA CENTER REDESIGN You are a data center manager and have been...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Please complete this problem in MATLAB. You need to buy some filing cabinets. You know that Cabin...

    Please complete this problem in MATLAB. You need to buy some filing cabinets. You know that Cabinet X costs $10 per unit, requires six square feet of floor space, and holds eight cubic feet of files. Cabinet Y costs $20 per unit, requires eight square feet of floor space, and holds twelve cubic feet of files. You have been given $140 for this purchase, though you don't have to spend that much. The office has room for no more than...

  • You need to buy some filing cabinets. You know that Cabinet X costs $10 per unit,...

    You need to buy some filing cabinets. You know that Cabinet X costs $10 per unit, requires six square feet of floor space, and holds eight cubic feet of files. Cabinet Y costs $20 per unit, requires eight square feet of floor space, and holds twelve cubic feet of files. You have been given $140 for this purchase, though you don't have to spend that much. The office has room for no more than 72 square feet of cabinets. How...

  • 2. Suppose you were in charge of the Data Center at Dominican. Assume that the Data...

    2. Suppose you were in charge of the Data Center at Dominican. Assume that the Data Center is in the basement of Lewis Hall and that all the servers (Blackboard, Email etc.) are in one room. You have been asked to develop a Disaster Recovery Plan for the Dominican Data Center. Question 2a: Give a reference to one or more web sites that you would use to help you build a Disaster Recovery Plan for your Data Center. Explain why...

  • A retailer stocks four different types of umbrellas: women's, golf, men's and folding. The retailer wants...

    A retailer stocks four different types of umbrellas: women's, golf, men's and folding. The retailer wants to determine how many of each type of umbrella to stock to maximize profit. The retailer has constraints on the storage space, special display racks, demand and a marketing restriction. The retailer has constructed a linear program and generated the following sensitivity analysis report: Variable Cells Allowable Final Reduced Objective Allowable Decrease Coefficient Increase Value Cost Name 1E+30 -5.4 5.4 Women's 6.75 1E+30 12...

  • Show Work ABC Corporation has three plants with production capacity and plans to begin a production...

    Show Work ABC Corporation has three plants with production capacity and plans to begin a production of a product that can be made in three sizes – large, medium and small – that yield a net unit profit of $420, $360 and $300 respectively. Plants 1, 2 and 3 have capacity to produce 750, 900, and 450 units per day of this product, respectively, regardless of the size or combination of sizes involved. The amount of available storage space also...

  • You have been hired as the manager of a community health center. This health center provides...

    You have been hired as the manager of a community health center. This health center provides medical care to children. One of your first tasks is to develop a static annual budget for the health center. In fact, the Board of Directors wants to see your budget by Saturday at midnight. In order to develop an accurate static budget you know you need to get some facts. You ask around to see what kind of information you can gather. This...

  • You are the southeast merchandising and marketing manager for Designer Collections (e.g., Ralph Lauren, Donna Karen)...

    You are the southeast merchandising and marketing manager for Designer Collections (e.g., Ralph Lauren, Donna Karen) at Lordstrom, Inc., a women’s clothing store chain based in Boston, MA. Lordstrom is in the process of opening a new store in Fashion Square Mall in Buckhead, an upscale area on the north side of Atlanta, GA. Retail space is quite expensive in the mall (nearly 50% more expensive than typical locations), so Lordstrom facility engineers are trying to make every inch of...

  • You have been selected as the project manager for the Global Treps project. You helped to...

    You have been selected as the project manager for the Global Treps project. You helped to run a local shark tank like event at your college last year as part of a class project, so you have a general idea of what is involved. The schedule goal is six months, and the budget is $120,000. Your favorite professor, Dr. K., and a few of her associates have agreed to fund the project. Your strengths are your organizational and leadership skills....

  • Can you please show or elaborate how you got your answers. Thank you #2-10 board on...

    Can you please show or elaborate how you got your answers. Thank you #2-10 board on Bl Refer to the plot plan for Highland Office Supply to answer queslD Local ordinances require the following for commercial office buildings: Porking-hwo 200 sq t parking spaces per 1000 sq ft of office space Green space-10% minimum of total lot size Maximum building size-40% of total lot size Selbock-400-from front street curb; 250" on each side; 200" on back ETER STREET NORTH FL...

  • Extended Learning Exercise. You have been asked to prepare a quick estimate of the construction cost...

    Extended Learning Exercise. You have been asked to prepare a quick estimate of the construction cost for a coal-fired electricity generating plant and facilities. A work breakdown structure (levels one through three) is shown in the table below EE! Click the icon to view the work breakdown structure Click the icon to view the available information What is your estimated 2019 cost for building the coal-fired generating facility? Summarize your calculations in a cost estimating worksheet, and state the assumptions...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT