When designing PLC-based process control systems, what are the differences between {1/0, On/Off, Close/Open, High/Low} and {True/False}?
The PLC is a digital equipment which operates on the basis of binary principle. Binary principle is an idea. According to this idea, we consider that the things exist in one of two states. These states are defined as "high/low", or "on/off", "1/0", "open/close", "yes/no" etc.
For instance a LED can be ON or OFF, but it can't be OPEN or CLOSE. A Switch can be OPEN or CLOSED, A induction motor can be RUNNING or STOPPED, or the output of logic gates can be 1 or 0.
When designing PLC-based process control systems, what are the differences between {1/0, On/Off, Close/Open, High/Low} and...
. What is a programmable logic controller (PLC)?12. The , Identify four tasks in addition to relay switching operations that PLCs are capable performing. 3. List six distinct advantages that PLCs offer over controller operates in real time. What does this mean? of performing 13. Answer the following with reference to the f conventional relay-based control systems. control PLC ladder logic diagram of Figure 1-21 this etary PLC architecture. 5. State two ways in which LVO is incorporated into 4,...
Calculate the return for June 21st based on the data below: Date Open High Low Close Dividend 20-Jun 13.2 15.4 12.8 14 21-Jun 13.3 15.3 12.2 15.2 0.6 22-Jun 14.8 17.5 14.5 16 12.86% 30.33% 18.80% 8.57%
1. Explain differences in culturally-based value systems relative to the amount of control a person feels he or she has over future outcomes. 2. How does this belief influence the decision-making process? Please number and answer each question separately in 150 -250 words total
please solve all the questions Q1 (30 pts) Design a state-based PLC program to control a motor. The system specification is as follows. • Press a normally open push button, the motor will start. Motor stop will stop after 5 minutes or a normally close push button is pressed. . When the motor is running, a read light is ON. When the motor is stopped, a green light is ON. Use the "Fail Safe" concept, i.e., if the wire of...
true or false 1. When designing a High-Contact Service delivery you would want to have your facility close to your labor force 2. Quickly testing and revising a preliminary design model is an example of Manufacturing Feasibility. 3. In Service firms, the primary focus of activities is on the Back Office.
What are the key reasons for product cost differences between traditional costing systems and Activity-Based Costing ABC systems?
For the construction of short-term patterns, what data is required? 1. Open 2. High 3. Low 4. Close O a. 1 Only b. 1 and 3 Only OC. 2, 3 and 4 Only O d. 1, 2, 3, 4
Discuss the differences between high context and low context cultures. What is the US classified as, and how does know about other kinds of cultural context prepare you for international business relationships? Give an example of an assumption that you make about social or business context that may not apply to someone from a different culture.
1.If you open a negotiation with an extremely high or low offer, are you prepared to handle the possibility that your opponent might break off negotiations? If this happens, do you think that if you try to bring your opponent back to the negotiation by making a big concession, it will make you look foolish or incredible? 2.When you plan your negotiation strategy, do you consider how your opponent might respond to your offers and demands? If so, do you...
MANE 315 Quiz#3 In Allen-Bradly PLC systems, you have a module with the product number。 explain 1) what t stands for? 2) What 'A' stands for? 3) What 8'stands for? (5) f "1746-1A 8.Please 2. In Allen-Bradly PLC systems, you have a module with the product number of "1746-0W 16". Please explain 1) what 'O, stands for? 2) What'W' stands for? 3) What' 16' stands for? (S) 3. Write the three positions of the key on PLC CPU, explain the...