The Kirkland Company produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine every time (considered as one sample) and measures the outside diameter of the bottle neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (in.) from the last six samples (each sample contains 4 bottles) are
Sample |
Bottle #1 |
Bottle #2 |
Bottle #3 |
Bottle #4 |
1 |
0.624 |
0.627 |
0.584 |
0.600 |
2 |
0.597 |
0.601 |
0.607 |
0.613 |
3 |
0.582 |
0.570 |
0.589 |
0.592 |
4 |
0.620 |
0.605 |
0.595 |
0.585 |
5 |
0.582 |
0.617 |
0.698 |
.633 |
6 |
0.585 |
0.593 |
0.637 |
0.579 |
The Kirkland Company produces plastic bottles to customer order. The quality inspector randomly selects four bottles...
4 Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottle neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (in.) from the last six samples are Bottle Sample 1 2 3 0.592 0.588 0.590 0.617 2 0.598 0.587 0.580 0.585 3 0.613 0.594 0.615 0.589 0.608 0.610 0.623 0.623 5 0.572 0.623 0.572 0.585 0.582...
Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottle? neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions? (in.) from the last six samples are Bottle Sample 1 2 3 4 1 0.5910.591 0.6170.617 0.6020.602 0.5900.590 2 0.5830.583 0.5860.586 0.5800.580 0.5900.590 3 0.5760.576 0.5750.575 0.5860.586 0.6190.619 4 0.6220.622 0.6190.619 0.6180.618 0.5720.572 5 0.6050.605 0.5840.584 0.6200.620...