Question

4 Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the botFactors for calculating three-sigma limits for the x-chart and R-chart Factor for LCL for R-Chart (D3) Factor for UCL for R-C

0 0
Add a comment Improve this question Transcribed image text
Answer #1

# SAMPLE

1

2

3

4

AVERAGE

1

0.592

0.588

0.59

0.617

0.5968

2

0.598

0.587

0.58

0.585

0.5875

3

0.613

0.594

0.615

0.589

0.6028

4

0.608

0.61

0.623

0.623

0.616

5

0.572

0.623

0.572

0.585

0.588

6

0.582

0.58

0.581

0.576

0.5798

GRAND AVERAGE

0.5952


GRAND MEAN = 0.595



UPPER SPECIFICATION = 0.65

LOWER SPECIFICATION = 0.55

PROCESS MEAN = 0.595

STANDARD DEVIATION = 0.013

Cpk = MINIMUM((UPPER SPECIFICATION - MEAN) / 3 * STANDARD DEVIATION), (MEAN - LOWER SPECIFICATION) / 3 * STANDARD DEVIATION)

Cpk = MINIMUM((0.65 - 0.595) / 3 * 0.013), (0.595 - 0.55) / 3 * 0.013)

Cpk = MINIMUM(1.4103, 1.1538)

Cpk = 1.15

** Leaving a thumbs-up would really help me out. Let me know if you face any problems.

Add a comment
Know the answer?
Add Answer to:
4 Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from...

    Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottle? neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions? (in.) from the last six samples are Bottle Sample 1 2 3 4 1 0.5910.591 0.6170.617 0.6020.602 0.5900.590 2 0.5830.583 0.5860.586 0.5800.580 0.5900.590 3 0.5760.576 0.5750.575 0.5860.586 0.6190.619 4 0.6220.622 0.6190.619 0.6180.618 0.5720.572 5 0.6050.605 0.5840.584 0.6200.620...

  • The Kirkland Company produces plastic bottles to customer order. The quality inspector randomly selects four bottles...

    The Kirkland Company produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine every time (considered as one sample) and measures the outside diameter of the bottle neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (in.) from the last six samples (each sample contains 4 bottles) are Sample Bottle #1 Bottle #2 Bottle #3 Bottle #4 1 0.624 0.627 0.584 0.600 2 0.597 0.601 0.607...

  • The Canine Gourmet Company produces delicious dog treats for canines with discriminating tastes. Management wants the...

    The Canine Gourmet Company produces delicious dog treats for canines with discriminating tastes. Management wants the box-filling line to be set so that the process average weight per packet is 47 grams. To make sure that the process is in control, an inspector at the end of the filling line periodically selects a random box of 8 packets and weighs each packet. When the process is in control, the range in the weight of each sample has averaged 7 grams....

  • that was the complete data the second picture is the control limits Refer to Table S61...

    that was the complete data the second picture is the control limits Refer to Table S61 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Ross Hopkins is attempting to monitor a filling process that has an overall average of 705 mL. The average range R is 8 ml. For a sample size of 10, the control limits for 3-sigma x chart are: Upper Control Limit (UCL.2)= ml (round your response to three decimal places). Lower Control...

  • The Money Pit Mortoage Company is interested in monitoring the performance of the mortoage procees. Firieen...

    The Money Pit Mortoage Company is interested in monitoring the performance of the mortoage procees. Firieen samples of five compieted mortgage traneactions each were teken duing a period when the procees was beieved to be in control The times to complete the transsctons were meesured. The meens and ranges of the mongege process trensschon imes, measured in days, are as folows: Sample 1 2 3 4 9 10 11 12 13 14 15 Mean 13 11 5 14 12 13...

  • The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen...

    The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The means and ranges of the mortgage process transaction​ times, measured in​ days, are as​ follows: b. Sample123456789 10 11 12 13 14 15 Mean 5 103 7 8 13 14 9 9 9 5...

  • A) Set the control limits for the process for the x(bar) chart when the maching is working proper...

    round to 3 decimal places ? A) Set the control limits for the process for the x(bar) chart when the maching is working properly UCL-x-? grams (round to two decimal places) LCL-x grams (round to two decimal places) B) Set the control limits for this process for the R-chart. UCLrgrams (round to two decimal places) LCLr grams (round to two decimal places) Refer to the table Factors for Computing Control Chart Limits (3 sigma) for this problem. Your supervisor, Lisa...

  • Consider Chapter? 3, Problem 4 that was a homework problem dealing with the quality of Aspen...

    Consider Chapter? 3, Problem 4 that was a homework problem dealing with the quality of Aspen Plastics bottle neck diameters. For randomly entered? data, results were obtained as shown? below: For the data? shown, the calculation of the Lower Control Limit for the? X-bar chart is equal to which of the? following? A. none of these B. =D9-D10*D16 C. =D9+D10*D16 D. = 0.729 PLEASE INDICATE CORRECT ANSWER ONLY! Solver -R and X-Bar Charts 5 Enter data in yellow shaded areas...

  • Problem-3: (3 pts) A manufacturer in Sharjah uses SPC to control the quality of the firm's...

    Problem-3: (3 pts) A manufacturer in Sharjah uses SPC to control the quality of the firm's products. Last week, 30 samples of Product XYZ were taken and the number of flaws per unit were counted. Question: What type of SPC control chart i.e., X-bar, R, p, and/or c chart) was used? Sample Size, n 2 3 4 5 6 7 8 9 10 12 Mean Upper Lower Factor, A, Range, D4 Range, D3 1.880 / 3.268 0 1.023 2.574 0...

  • Problem 6s.11ac Question Help Refer to Table $6.1 - Factors for Computing Control Chart Limits (3...

    Problem 6s.11ac Question Help Refer to Table $6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean Range qe (in.) (in.) 9.402 0.033 9.404 0.041 9.391 0.034 9.408 0.051 9.399 0.031...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT