An initial time study was done on a process with the following
results (in minutes). Based on the data obtained so far, assuming
an allowance of 13 percent of the normal time, what do you
estimate for the time per customer served, based on this
preliminary sample? (Round all intermediate calculations to two
decimal places.) Element
Performance Rating Obs 1 Obs 2
Obs 3 Obs 4 Obs 5
Element 1 80 6 6 3 5 3
Element 2 120 9 10 9 10 11
Element 3 90 7 8 6 8 6
We tabulate the data as shown below and find the mean for each element:
We know, normal time for an element = Mean * Performance rating
Standard time for element = Normal time * (1 + Allowance) = Normal time * (1 + 13%) = Normal time * (1 + 0.13)
Based on above formulas, we find normal time and standard time for each element and find total standard time of the process
The total standard time for the process is shown highlighted in green
The above table in form of formulas is shown below for better understanding and reference:
Hence, estimate for the time per customer served, based on this preliminary sample = 24.57 minutes
An initial time study was done on a process with the following results (in minutes). Based...
(20 points) A direct time study is performed to obtain average time and performance rating values for the work elements in a certain repetitive task. The values are given in the table below. Elements a, b, and c are worker-controlled. Element d is a machine-controlled element and its time is the same each cycle (N.A.means performance rating is not applicable). Element c is performed while the machine is performing its cycle (element d). Element e is a worker- controlled irregular...
Based on a careful work study in the Hofstetter? Corp., the results shown in the following table have been? observed: a) The normal time for the "prepare daily reports" operation = ___ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = ___ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = ___ minutes (round your response to two decimal places). The normal...
A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element Performance Rating 1 2 3 4 5 6 1 80 % 0.51 0.56 0.46 0.46 0.46 0.46 2 75 1.51 1.51 1.46 1.46 1.46 1.51 3 120 0.86 0.86 0.76 0.81 0.86 0.81 4 105 1.11 1.16 1.11 1.16 1.16 1.21 a. Determine the average cycle time for...
3.2 The observed element times and performance ratings collected in a direct time study are indicated in the table below. The snapback timing method was used. The PFD allowance in the plant is 14%. All elements are regular elements in the work cycle. Determine (a) the normal time and (b) the standard time for the cycle Work element Observed time (min) Performance rating(%) 0.22 90 0.41 120 0.30 100 0.37 90
The normal time for the "label and package reports" operation = minutes (round your response to two decimal places). UU. VOLUP тогт" тоотроо UUUUUU. TIU, LLOILOPO % Problem 10.28 Question Help Based on a careful work study in the Hofstetter Corp., the results shown in the following table have been observed: Performance Observation (minutes per cycle) 2 3 Rating 5 34 40 Element Prepare daily reports Photocopy results Label and package reports Distribute reports 39 11 37 * 12 120%...
What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes 15 Element Performance 1 13 4 6 rating 85% 100% 110% 95% 0.5 258* 0.89 1.14 0.46 1.52 0.8 0.44 1.5 0.84 1.1 0.43 1.47 0.48 1.49 0.85 0.45 1.51 0.83 1.081.21.161.26 4 * Machine broke...
A: Find the Normal Time for the "Prepare Daily Reports" operation: B: Normal Time for "Photocopy Results" Operation: C: Normal TIme for the "Label and Package Reports Operation: D: Normal Time for "Distribution Reports" Operation: E: Normal Time for the ENTIRE OPERATION PROCESS F: The Standard Time for this Process: G: The number of Operations that are required for a 90, 95, and 99% confidence level with 5% accuracy? Based on a careful work study in the Hofstetter Corp., the...
A time study analyst observes a worker over a period of time and calculates that the worker required 60.0 minutes per unit produced. The worker was rated by the analyst at a 120 percent performance rating, and an 15 percent allowance for personal time and fatigue applies. (1) What is the standard time for this task? (2) If a worker managed to produce 10 units in an eight-hour day, what would their day's pay be if the base rate is...
Suppose that the amount of service(ordering a coffee and getting it done) time at a KU driving- through coffee shop is exponentially distributed with an expected value of 10 minutes. You arrive at the driving-through line while one customer is being served and one other customer is waiting in the line. The staff of the coffee shop informs you that the customer has already ordered a Cafe Latte and waited for 5 minutes. What is the probability that the customer...
a) The normal time for the "prepare daily reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = __________ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "distribute reports" operation = _________ minutes (round your response to two decimal places). The normal time for...