Question

A time study was conducted on a job that contains four elements. The observed times and...

A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table.

OBSERVATIONS (minutes per cycle)
Element Performance
Rating
1 2 3 4 5 6
1 80 % 0.51 0.56 0.46 0.46 0.46 0.46
2 75 1.51 1.51 1.46 1.46 1.46 1.51
3 120 0.86 0.86 0.76 0.81 0.86 0.81
4 105 1.11 1.16 1.11 1.16 1.16 1.21


a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.)

Element Average cycle
1
2
3
4


b. Find the normal time for each element. (Round your answers to 3 decimal places.)

Element Normal time
1
2
3
4

  
c. Assuming an allowance factor of 21 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.)

Element Standard time
1
2
3
4
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Observed time is the time that is taken to complete a particular task. Normal time is the time that is required to train workers so that they can perform particular task. standard time is the time that is required by an average skillet worker, who work at normal pace to perform a specific task.

Add a comment
Know the answer?
Add Answer to:
A time study was conducted on a job that contains four elements. The observed times and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that ...

    What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes 15 Element Performance 1 13 4 6 rating 85% 100% 110% 95% 0.5 258* 0.89 1.14 0.46 1.52 0.8 0.44 1.5 0.84 1.1 0.43 1.47 0.48 1.49 0.85 0.45 1.51 0.83 1.081.21.161.26 4 * Machine broke...

  • 3 A job was timed for 60 cycles and had an average of 1.16 minutes per...

    3 A job was timed for 60 cycles and had an average of 1.16 minutes per piece. The performance rating was 86 percent, and workday percent. Determine each of the following: allowances are a. Observed time. (Round your answer to 2 decimal place.) Observed time minutes 5 polnts b. Normal time. (Round your answer to 2 decimal places.) Normal time minutes eBook c. Standard time. (Round your answer to 2 decimal places.) References Standard time minutes

  • An initial time study was done on a process with the following results​ (in minutes). Based...

    An initial time study was done on a process with the following results​ (in minutes). Based on the data obtained so​ far, assuming an allowance of 13 percent of the normal​ time, what do you estimate for the time per customer​ served, based on this preliminary​ sample? ​(Round all intermediate calculations to two decimal​ places.)                     Element   Performance Rating   Obs 1   Obs 2   Obs 3   Obs 4   Obs 5 Element 1 80 6 6 3 5 3 Element 2 120 9...

  • A job consists of three elements. Twenty observations for each element were timed, and the resulting...

    A job consists of three elements. Twenty observations for each element were timed, and the resulting data are shown in the following table. A performance rating has also been assigned for each element, as shown in the table. The job has an allowance of 15% of normal time. Performance Rating Element #1 #2 #3 70 110 90 Average Element Time (in minutes) 3.6 2.5 3.1 Use the information in Scenario 4.3. What is the normal time for job element #1?...

  • Question one: A job is divided into four work elements. Work element t F RF 1...

    Question one: A job is divided into four work elements. Work element t F RF 1 0.4 1 1 2 0.32 0.5 0.8 3 0.2 1 1.2 4 0.5 1 1.3 Calculate the normal time. Assuming that the allowance is 20 percent of the normal time. Calculate the standard time for this job. What are the uses of the calculated standard time for managers?

  • Problem 16-17 Given the following information on job times and due dates Job Time Due Date (Hours...

    Problem 16-17 Given the following information on job times and due dates Job Time Due Date (Hours) (Hours) Job 3.5 2.0 4.5 5.0 2.5 6.0 18 20 Determine the optimal processing sequence using (1) First come, first served, (2) Shortest processing time, (3) Earliest due date, and (4) Critical ratio. a-1. Sequence for First come, first served (Click to select) Sequence for Shortest processing time Click to select) Sequence for Earliest due date (Click to select) Click to select) Sequence...

  • Based on a careful work study in the Hofstetter? Corp., the results shown in the following...

    Based on a careful work study in the Hofstetter? Corp., the results shown in the following table have been? observed: a) The normal time for the "prepare daily reports" operation = ___ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = ___ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = ___ minutes (round your response to two decimal places). The normal...

  • Frequency of Cloud Cover over Minneapolis in January Time of day 1. 0 Fraction of sky...

    Frequency of Cloud Cover over Minneapolis in January Time of day 1. 0 Fraction of sky covered 20.8 20.7 20.6 20.5 20.4 20.3 20.2 20.1 Midn. 3AM 6AM 9AM Noon 3.P. M 6P.M 9P.M 0.450.48 0.47 0.45 0.41 0.39 0.41 0.38 0.48 0.52 0.49 0.57 0.55 0.53 0.46 0.46 0.50 0.55 0.52 0.62 0.60 0.57 0.490.43 hos oss 0.52 0.56 0.54 0.64 0.63 0.59 0.52 0.47 0.54 0.59 0.57 0.66 0.65 0.61 0.54 0.49 0.55 0.59 0.59 0.69 0.67 0.64...

  • A job was timed for 60 cycles and had an average of 1.9 minutes per piece....

    A job was timed for 60 cycles and had an average of 1.9 minutes per piece. The performance rating was 90 percent, and workday allowances are 18 percent. Determine each of the following: a. Observed time. (Round your answer to 1 decimal place.)   Observed time minutes b. Normal time. (Round your answer to 2 decimal places.)   Normal time minutes c. Standard time. (Round your answer to 2 decimal places.)   Standard time minutes

  • Let X denote the proportion of allotted time that a randomly selected student spends working on...

    Let X denote the proportion of allotted time that a randomly selected student spends working on a certain aptitude test. Suppose the pdf of X is FX) = (+1)x"0SX S1 0 otherwise where -1 <0. A random sample of ten students yields data x,-0.96, X, -0.79, X, = 0.76, X = 0.73, Xs = 0.92, X = 0.46, Xy = 0.90, -0.65, X -0.94, X. 0.86. (a) Use the method of moments to obtain an estimator of *(1+2) Compute the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT