Question

A system is operated for 20,000 hours and the demonstrated MTBF was 500 hours. For each...

A system is operated for 20,000 hours and the demonstrated MTBF was 500 hours. For each maintenance action, two technicians were assigned to accomplish corrective maintenance and the Mct was 2 hours. Determine MLH / OH expended.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

T=20000

MTBF=500

ML Hc=2

λ=1/MTBF

λ=1/500

λ=0.002

ML Hc=(∑λ)(ML Hi)/∑λ

ML Hc is the mean corrective maintenace

ML Hi=is the maintenance labour−hours

2=(0.002)(MLHi)/0.002

ML Hi=2hours

Add a comment
Know the answer?
Add Answer to:
A system is operated for 20,000 hours and the demonstrated MTBF was 500 hours. For each...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Problema #1 ( 10 points) A system has a mean time to repar (MTTR) of 30...

    Problema #1 ( 10 points) A system has a mean time to repar (MTTR) of 30 minutes, and a mean time between unscheduled maintenance actions (MTBF) of 60 hours. The intended utilization (actual hours of operation to meet the customer demand for the output) of the system is 4800 hours per year. determine 1. How many unscheduled maintenance actions are to be expected each year? 2. How many hours of unscheduled maintenance are to be expected each year 3. If...

  • Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the...

    Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Direct materials cost per unit $18.60 Direct labor cost per unit 14.80 Sales price per unit 83.40 Expected production per month 1,230 units Rocky River $ 26.40 18.30 105.00 930 units Keller has monthly overhead of $13,493, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3, 250 6, 283...

  • 20,000 assign to each product line, the two products: car wheals and truck wheels. To determine...

    20,000 assign to each product line, the two products: car wheals and truck wheels. To determine theamr controller, Robert Hermann, has developed the follown Estimated wheels produced Direct labor hours per wheel Car 40,000 Truck 10,000 3 Total estimate d overhead costs for the two product lines are $770,000. Instructions (a) Compute the overhead cost assigned to the car wheels and truck wheels, a assuming that direct labor hours he believes that most is used to allocate overhead costs. (b)...

  • Company used to consider a traditional costing system based on machine hours; however, they are currently...

    Company used to consider a traditional costing system based on machine hours; however, they are currently considering an activity-based costing (ABC) approach. The company estimates the usage of 50,000 direct labor hours (DLH) and 30,000 machine hours (MH) for the current year. The following data show the budgeted manufacturing overhead (OH): Activity center Cost driver Activity driver Cost Material handling # of parts handled 6,000,000 $720,000 Setup costs # of setups 750 $315,000 Machining costs # of machine hours 30,000...

  • PA4-1 Assigning Costs Using Traditional System, ABC System [LO 4-1,4-3,4-4, 4-6] Hazelnut Corp. manufactures lawn ornaments....

    PA4-1 Assigning Costs Using Traditional System, ABC System [LO 4-1,4-3,4-4, 4-6] Hazelnut Corp. manufactures lawn ornaments. It currently has two product lines, the basic and the luxury. Hazelnut has a total of $183,099 in overhead. The company has identified the following information about its overhead activity cost pools and the two product lines: Quantity/Amount Consumed by Activity Cost Pools Materials handling Quality control Machine maintenance Cost Driver Number of moves Number of inspections Number of machine hours Cost Assigned to...

  • PA4-1 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-6] Hazelnut Corp. manufactures...

    PA4-1 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-6] Hazelnut Corp. manufactures lawn ornaments. It currently has two product lines, the basic and the luxury. Hazelnut has a total of $175.910 in overhead. The company has identified the following information about its overhead activity cost pools and the two product lines: Cost Quantity/Amount ConsumedQuantity/Amount Consumed / Assigned by by Activity Cost Pools Cost Driver to Pool Basic Luxury Materials handling Number of moves $ 4,050 28...

  • Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the...

    Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River Basic production information follows: Sandy Beach $19.60 HI 14.00 Rocky Riven 27.20 16. Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 920 units Keller has monthly overhead of 511,632, which is divided into the following cost pools Quality control Maintenance Total The company has also compiled the following information about the chosen...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.00 14.60 82.30 1.210 units Rocky River $ 27.40 17.30 106.00 910 units Keller has monthly overhead of $11.716, which is divided into the following cost pools: $ 2,135 Setup costs Quality control Maintenance Total 3,955 $ 11,716 The company has...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Rocky River $ 27.10 Sandy Beach Direct materials cost per unit $19.30 Direct labor cost per unit 13.30 Sales price per unit 83.90 Expected production per month 1, 240 units 18.60 105.00 9 10 units Keller has monthly overhead of $11,466, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 1,920 6,212 3, 335 $...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.60 $ 27.30 Direct labor cost per unit 13.20 17.20 Sales price per unit 82.10 105.00 Expected production per month 1,250 units 950 units        Keller has monthly overhead of $12,203, which is divided into the following cost pools: Setup costs $ 3,100 Quality control 5,487 Maintenance 3,616 Total $ 12,203...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT