Question

The length of time Y necessary to complete a key operation in the construction of houses...

The length of time Y necessary to complete a key operation in the construction of houses has an exponential distribution with mean 9.74 hours. The formula  

C=96.23+43.19Y+2.75Y2

relates the cost C of completing this operation to the square of the time required to completion. Find the mean of C.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

This question just use the relation V(X)=E(Y2)-[E(Y)]2

Please upvote If I am able to help you.

Thanks

Add a comment
Know the answer?
Add Answer to:
The length of time Y necessary to complete a key operation in the construction of houses...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The length of time Y necessary to complete a key operation in the construction of houses...

    The length of time Y necessary to complete a key operation in the construction of houses has an exponential distribution with mean 17 hours. The formula C = 100 + 80Y + 3Y2 relates the cost C of completing this operation to the square of the time to completion. The mean of C was found to be found to be 3,194 hours and the variance of C was found to be 26,316,340. How many standard deviations above the mean is...

  • 12. let Mx(1) be the moment generating function of X. Show that (a) Mex+o(t) = eMx(at)....

    12. let Mx(1) be the moment generating function of X. Show that (a) Mex+o(t) = eMx(at). (b) TX - Normal(), o?) and moment generating function of X is Mx (0) - to'p. Show that the random variable 2 - Normal(0,1) 13. IX. X X . are mutually independent normal random variables with means t o ... and variances o, o,...,0, then prove that X NOEL ?). 14. If Mx(1) be the moment generating function of X. Show that (a) log(Mx...

  • 4. Let x be a random variable that represents the length of time it takes a...

    4. Let x be a random variable that represents the length of time it takes a student to complete a chemistry lab project. From long experience, it is known that x has a normal distribution with mean 1 3 .6 hours and standard deviation - 0.5. Find the chance that a student will take more than 4.5 hours to complete a lab project. 5. Using the information from #4, calculato the chance that the mean length of time for a...

  • i need clear writing 3. (9 Marks) The length of time required by students to complete...

    i need clear writing 3. (9 Marks) The length of time required by students to complete a coe-hour exam is a random variable with a probability density function (pdf) given by 1) = c +2 OSX S1 a) Find the value and write down the new pdf. (2 points) b) Find the probability that a randomly selected student will finish in less than half an hour. (3 points) c) Find the mean and standard deviation of the distribution. (4 points)...

  • According to the Internal Revenue Service, the average length of time for an individual to complete (keep records for, l...

    According to the Internal Revenue Service, the average length of time for an individual to complete (keep records for, learn, prepare, copy, assemble, and send) IRS Form 1040 is 10.18 hours (without any attached schedules). The distribution is unknown. Let us assume that the standard deviation is two hours. Suppose we randomly sample 36 taxpayers. Part (a) In words, define the random variable X. the number of taxpayers sampled the length of time, in minutes, for an individual to complete...

  • A company offers prizes to their employees depending on the time it takes them to complete...

    A company offers prizes to their employees depending on the time it takes them to complete an assignment. Employees receive a 300, 200 or 100 euros gratification if the assignment is completed in less than 10 hours, between 10 and 15 hours or in more than 15 hours, respectively. The probability of completing the task in each of these cases is 0.1, 0.4 and 0.5 respectively. a) Find the probability distribution function, the cumulative probability function and the expected value...

  • (4) The time required to complete a final exam in a particular college course is normally...

    (4) The time required to complete a final exam in a particular college course is normally distributed with a mean of 75 minutes and a standard deviation of 15 minutes. Answer the following questions: (a) (for a randomly selected student) What is the probability of completing the exam in 1 hour or less? (4) (b) What is the probability a randomly selected student will complete the exam in more than 60 minutes but less than 75 minutes? (4b) (c) Assume...

  • The time required for Dr. B's students to complete the Statistics Exam is approximately normally distributed...

    The time required for Dr. B's students to complete the Statistics Exam is approximately normally distributed with a mean of 40.4 minutes and a standard deviation of 2.2 minutes. Let X be the random variable "the time required for Dr. B's students to complete the Statistics Exam." 6. With the above setting what time marks the 90th percentile? A. 37.562 minutes B. 37.584 minutes C. 43.238 minutes D. 43.216 minutes E. None of the above 7. Which of the following...

  • During an eight-hour shift, the proportion of time Y that a sheet-metal stamping machine is down...

    During an eight-hour shift, the proportion of time Y that a sheet-metal stamping machine is down for maintenance or repairs has a beta distribution with a 1 and B 2. That is, 2(1 - y), 0s ys 1, f(y) lo, elsewhere. The cost (in hundreds of dollars) of this downtime, due to lost production and cost of maintenance and repair, is given by C your answers to two decimal places.) 50Y 2y. Find the mean and variance of C. (Round...

  • Development of a new deluxe version of a particular toy is being considered by T-O-Y Inc....

    Development of a new deluxe version of a particular toy is being considered by T-O-Y Inc. The activities necessary for the completion of this project along with the relevant information for each activity are listed in the following table. The Total Crash Time represents the time for that activity after it has been crashed the maximum crash time allowed for that activity. For example, we can reduce the time for Activity A by one week to 3 weeks after crashing...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT