A manufacturer makes two products, doors and windows. Each must be processed through two work areas....

A manufacturer makes two products, doors and windows. Each must be processed through two work areas. Work area #1 has 25 hours of available production time. Work area #2 has 35 hours of available production time. Manufacturing of a door requires 5.3 hours in work area #1 and 3.1 hours in work area #2. Manufacturing of a window requires 4.7 hours in work area #1 and 3.3 hours in work area #2. Profit is $6.50 per door and $3.50 per window.

Show work.

a. Define decision variables that will tell how many units to build (doors and windows).

b. Develop an objective function that will maximize profits.

c. Develop production constrains for work area #1 and #2.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

a)

Let X = Number of Doors to be produced
and Y = Number of Windows to be produced
So, X & Y are the decision variables.


b) Let Profit = Z

Objective function is to maximize profit. i.e. Maximize Z.
Z = 6.5 X + 3.5 Y

c)The Constraints are:

5.3 X + 7.1Y <= 25
3.1X + 3.3Y <= 35

Add a comment
Know the answer?
Add Answer to:
A manufacturer makes two products, doors and windows. Each must be processed through two work areas....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Sanderson Manufacturing produces ornate, decorative wood frame doors and windows. Each item produced goes through three...

    Sanderson Manufacturing produces ornate, decorative wood frame doors and windows. Each item produced goes through three manufacturing processes: cutting, sanding, and finishing. Each door produced requires 1 hour in cutting, 30 minutes in sanding, and 30 minutes in finishing. Each window requires 30 minutes in cutting, 45 minutes in sanding, and 1 hour in finishing. In the coming week, Sanderson has 40 hours of cutting capacity available, 40 hours of sanding capacity, and 60 hours of finishing capacity. Assume all...

  • DAMO manufactures two units, DOORS and WINDOWS for which the following information is available: Costs per...

    DAMO manufactures two units, DOORS and WINDOWS for which the following information is available: Costs per unit Direct materials Direct labor Variable overhead Fixed overhead Total cost per unit Price Units sold DOORS $   450 600 750 600 $2,400 $3,000 400 WINDAWS $   550 750 900 750 $2,950 $3,900 200                                                                                                                                                                                                                                                                                                 The average wage rate is $20 per hour. The plant has a capacity of 21,000 direct labor hours, but current production...

  • DAMO manufactures two units, DOORS and WINDOWS for which the following information is available: Costs per...

    DAMO manufactures two units, DOORS and WINDOWS for which the following information is available: Costs per unit Direct materials Direct labor Variable overhead Fixed overhead Total cost per unit Price Units sold DOORS $   450 600 750 600 $2,400 $3,000 400 WINDAWS $   550 750 900 750 $2,950 $3,900 200                                                                                                                                                                                                                                                                                                 The average wage rate is $20 per hour. The plant has a capacity of 21,000 direct labor hours, but current production...

  • 1. A company manufactures two products: large fans and medium fans. Each large fan requires 3...

    1. A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective...

  • Linear Programming Assignment You must do the necessary calculations in the answer cells. Simply providing a...

    Linear Programming Assignment You must do the necessary calculations in the answer cells. Simply providing a number in the answer cell will not receive any credit. Problem 1: Use the information below to complete the assignment van Oploo’s motor cycle company makes two motor cycles. The model "E" has a new engine and a low profile. Model "L" is larger, it uses an older engine and is specifically designed to appeal to women. van Oploo's produces the engines for both...

  • 3 Question 2. Hart Manufacturing makes 3 products. Each product requires manufacturing operations in three departments:...

    3 Question 2. Hart Manufacturing makes 3 products. Each product requires manufacturing operations in three departments: A, B, C. The labor requirements (in hour), by department, are as follows: Department Product 1 Product 2 Product 3 A 2 B 2.5 с 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $25 for product 1, $28 for product 2, and $30...

  • The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both products require wiring and...

    The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period,...

  • Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable...

    Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling During the next production period, 240 hours of wiring time are available and up...

  • Slavin Corporation manufactures two products, Alpha and Delta. Each product requires time on a single machine...

    Slavin Corporation manufactures two products, Alpha and Delta. Each product requires time on a single machine has a monthly capacity of 500 hours. Total market demand for the two products is limited to 1 monthly. Slavin is currently producing 110 Alphas and 110 Deltas each month. Cost and machine-usage products are shown in the following table, which Slavin managers use for planning purposes. Alpha $ 121 Total Delta $ 151 33 36 Price Less variable costs per unit Material Labor...

  • 1. Better Products manufactures three products on two machines. There is $30 profit associated with Product...

    1. Better Products manufactures three products on two machines. There is $30 profit associated with Product 1, $50 profit with Product 2, and $20 profit with Product 3. Each product requires labor time using machine A and machine B. Product 1 requires 1 hour from machine A and 1 hour from machine B. Product 2 requires 4 hours from machine A and 1 hour from machine B. Product 3 requires 1.5 hours from machine A and .5 hours from machine...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT