draft a curriculum vitae for an electrical engineer working with various project on medical and sales company dealing with capital equipment.
ABC
12, Merry Heights, Houston, Texas phone: (123) 456 7891
Assisting in supervising, scheduling & checking of project work
Providing general technical support & assisting in development of electrical designs.
Applying sound process control & power concepts
Mentoring &developing junior electric engineers.
Lead executing major capital projects as per agreed cost & schedule.
Managing the electrical & control scope of project
Proposing & executing improvements to existing automation systems
Coordinating all phases of assigned projects
Developing & managing major capital & expense projects.
Creation of electrical wiring diagrams
Technical management, planning & controlling of one’s own engineering work packages
Commissioning & attending testing with departments.
Coaching & mentoring team members.
draft a curriculum vitae for an electrical engineer working with various project on medical and sales...
Scenario You are working as a trainee test engineer for a small electrical and electronic design company. Your supervisor has given your team the task for designing a bench power supply unit that is suitable for use in electronic workshops and that will go in sale later in the year Your latest responsibility is to assist with the design of the power supply by carry out various tasks involving capacitors. Task 1 Research different types of capacitors to evaluate their...
You have been working on the draft a new marketing plan for Medical Center. You are trying to determine what balance of traditional media vs. digital media to include. What are some factors which you must take into consideration? What traditional media will you use? Why? Which digital media will you use? Why? What key terms will you include to help you improve your SEO?
A company needs an increase in working capital of $50,000 in a project that will last 4 years. The company's tax rate is 30% 4 and its after-tax discount rate is 8%. Click here to view Exhibit 13B-1 to determine the appropriate discount factor(s) using table. The present value of the release of the working capital at the end of the project is closest to: 02:-37.10 Multiple Choice $36,750 $15,000 $25,726 < Prev 40.10 Next> 5: Rhoads Corporation is considering...
Your company is considering a project which will require the purchase of $785,000 in new equipment. The company expects to sell the equipment at the end of the project for 25% of its original cost, but some assets will remain in the CCA class. Annual sales from this project are estimated at $284,000. Initial net working capital equal to 35.50% of sales will be required. All of the net working capital will be recovered at the end of the project....
Let's suppose that the net working capital requirements for a project is the 20% of the projected annual sales for each year. Let's suppose a project has a 4 years life period. In cases we want to calculate the net working capital , we add only the changes in Net working capital for years 1-4.Why only the changes? Why at time year=0 , we add the whole working capital requirements (20% X sales of next year)? Please try to explain...
A project has an initial requirement of $210944 for new equipment and $9567 for net working capital. The installation costs to get the new equipment in working condition are 8125. The fixed assets will be depreciated to a zero book value over the 5-year life of the project and have an estimated salvage value of $100516. All of the net working capital will be recouped at the end of the project. The annual operating cash flow is $95257 and the...
XYZ, Inc. is considering a 5-year project. The production will require $1,500,000 in net working capital to start and addition net working capital investments each year equal to 15% of the projected sales increase for the following year. Total fixed costs are $1,350,000 per year, variable production costs are $225 per unit, and the units are priced at $345 each. The equipment needed to begin production has an intalled cost of $23,000,000. The equipment is qualified as seven-year MACRS property....
You work as a Field Engineer in a private company (MEDRONIX) dealing with maintenance of medical equipment's. You have been assigned to restart five autoclaves which were commissioned three years back and never been used at SKM Hospital. During the restart of the machines you managed to change door gaskets and bacteria filters and did some plumbing for drainage. Three of the machines managed to complete cycles and tests while two got stuck on negative pulsing. You escalated the report...
An engineer at the XYZ Company has identified a piece of equipment that will generate after tax labor savings of $644,500 at the end of each year for five years. What is the maximum amount the company should be willing to pay for this piece of equipment if the cost of capital (discount rate) for a project with this risk profile if 11.5%?
Why do you think that assistants working in various medical settings have similar types of assignments? Why would some employers assign assistants a single task or related task, such as processing insurance claims, while in other settings the assistant is likely to perform a variety of tasks?