1) A dental office has a mix of procedures and each requires a set up time (like a job shop). Assume the following for a dentist:

  • 9-hour day with 1 hour total for lunch/breaks
  • Dentist does all work, including cleaning and setting up
  • Set up and processing times shown below
  • Set up performed for every patient – because that’s gross if they don’t use clean equipment!

Procedure

# Appts

Setup or changeover time (minutes)

Processing time (minutes)

Demand (# patients scheduled)

Total setup time

Total processing time

Total setup and processing time)

Crown

1st

2nd

15

10

90

30

2

1

Whiten

1st

5

30

4

Denture

1st

2nd

3rd

20

10

5

30

20

30

3

0

2

  • Complete the empty columns in the chart above. (3 points)
  • Is there sufficient capacity to perform all the work? What is the amount of either excess capacity or shortage? (2 points)
  • What percent of the dentist’s capacity (available total time) is used to set up and changeover from one procedure to another? (1 point)
  • If setup times could be reduced by 50%, what would new total set up time be? What would the capacity shortage/overage be? (2 points)

2) Prof Mathien has started a new business, and she forecasts the following demand for her product (in thousands of units) over the next 5 years:

Year

1

2

3

4

5

Forecasted Demand

60

79

81

84

84

She currently has 7 machines that operate on a 2-shift basis (8 hours per shift). 20 days are available for scheduled maintenance (downtime) with no product output. Assume there are 250 workdays per year. Each product takes 25 minutes to produce.

  • What is the capacity of the business? (1 point)
  • At what capacity level (% of normal capacity) would her business be operating for each of the next 5 years based on forecasted demand? (HINT: Compute the ratio of demand to capacity per year.) (5 points)
  • Does Prof Mathien need to buy more machines? If so, how many and in what year? Justify your answer/explain. (3 points)
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Given:

Number of Machine= 7

shift= 2

hours of shift= 8 hrs

workdays=250 days

maintenance time (downtime)= 20 days

duration for production= 25 minutes

What is the capacity of the business?

Available time for one machine per year = (250 - 20) days per year x 16 hours per day x 60 minutes per hour = 220800 minutes per year

Each product takes 25 minutes to produce.

Capacity of a single machine = 220800 / 25 = 8,832 units per annum

Therefore, the capacity for the seven machines = 8832*7 = 61,824 units per annum

At what capacity level (% of normal capacity) would her business be operating for each of the next 5 years based on forecasted demand?

The Demand to Capacity ratio is calculated by dividing demand by capacity

Year 1 2 3 4 5
Forecasted Demand 60,000 79,000 81,000 84,000 84,000
Capacity 61,824 61,824 61,824 61,824 61,824
Demand / Capacity 97.05% 127.78% 131.02% 135.87% 135.87%
Ratio 0.9705 1.2778 1.3102 1.3587 1.3587

Does Prof Mathien need to buy more machines? If so, how many and in what year? Justify your answer/explain

The capacity is higher than demand for first year; but from second year onwards, capacity is lower than demand. Therefore, new machines are required from second year onwards. Requirement of new machines can be calculated by multiplying number of machines multiplied by demand to caapcity ratio. Therefore, requirements are as follows:

Year-2: 7 * 1.2778 = 9
Year-3: 7 * 1.3102 = 10
Year-4: 7 * 1.3587 = 10
Year-5: 7 * 1.3587 = 10

Therefore requirement of machines are 9 in second year, 10 in third year, 10 in fourth year and 10 in fifth year.

Add a comment
Know the answer?
Add Answer to:
Please do the second part only." Prof Mathien has started a new business, and she forecasts...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 6. Hickory Manufacturing Company forecasts the following demand for a product (in thousande of units)...

    6. Hickory Manufacturing Company forecasts the following demand for a product (in thousande of units) over the next 5 years: 2 Year 5 81 60 79 84 Forecast demand 84 Currently the manufacturer has seven machines that operate on a two-shift (eight hours each) basis. Twenty days per year are available for scheduled maintenance of equipment with no process output. Assume there are 250 workdays in a year. Each manufactured good takes 25 minutes to produce. a. What is the...

  • JUST DO PART C! THANK YOU (Gelato) Bruno Fruscalzo decided to set up a small production facility in Sydney to sell to l...

    JUST DO PART C! THANK YOU (Gelato) Bruno Fruscalzo decided to set up a small production facility in Sydney to sell to local restaurants that want to offer gelato on their dessert menu. To start simple, he would offer only three flavors of gelato: fragola (strawberry), chocolato (chocolate), and bacio (chocolate with hazelnut). After a short time he found his demand and setup times to be Fragola Chocolato Bacio Demand (kg/hour) 10 15 5 Setup time (hours) 3/4 1/2 1/6...

  • will be no competition (i.e., waiting time) at any of the machines. Determine a set of...

    will be no competition (i.e., waiting time) at any of the machines. Determine a set of D1, D2, Ds) values that will minimize the average WIP in the system (that is, D, under this form of control. (d) (15 points) Using your solution to part (c), determine the average total WIP in the system. 5. Short Answer. Answer the following 3 questions are independently of each other. (a) (25 points) In the context of supply chain engineering, what is customer...

  • PART I: Multiple Choice Write all answers to the following questions. No partial credit available. Consumption...

    PART I: Multiple Choice Write all answers to the following questions. No partial credit available. Consumption utility is composed of price and convenience. True or False? A firm reduces inefficiencies by making trade-offs. True or False? A firm can increase its profitability by: A. increasing costs and reducing price. B. moving away from the efficient frontier. C. increasing inefficiencies. D. reducing inefficiencies. Operations comes from the Latin word "opus," which means: A. activity. B. helping people. C. improvement. D. work....

  • Need help within 30 minutes please! JL.52 A producer of industrial climate control modules has recently...

    Need help within 30 minutes please! JL.52 A producer of industrial climate control modules has recently changed to cellular manufacturing. The production facility operates 250 days per year and has annual demand of 6,500 units They can produce up to 80 modules each day. It costs $18.50 to set up a work cell to produce this module. The cost of each module is $32 and annual holding costs are $4 per unit. Setup labor cost is $14 per hour. What...

  • 2. King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The...

    2. King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The contribution margins for these products are: $70 for Product W, 560 for Product X, $90 for Product Y and S100 for Product Z. Fixed overhead is estimated at S5,500 per week. The manufacture of each fixture requires four machines, Machines #1, 2, 3 and 4, Each of the machines is available for 40 hours a week and there is no setup time required when...

  • QUESTION 21 (10 points) ‐ Overall Equipment Effectiveness (OEE) QUESTION 21 (10 points) Overall Equipment Effectiveness...

    QUESTION 21 (10 points) ‐ Overall Equipment Effectiveness (OEE) QUESTION 21 (10 points) Overall Equipment Effectiveness (OEE) A copy machine is available 20 hours a day. On a typical day, the machine needs to process 360 jobs. Each job takes about 1.5 minutes on the machine, 0.5 minute of which is processing time and 1 minute is setup time (logging in, defining the job). About 30% of the jobs need to be reworked, in which the set-up time and the...

  • 2. Four Step Process with Rework and Scrap - from module 5 slides Consider the following...

    2. Four Step Process with Rework and Scrap - from module 5 slides Consider the following four step assembly operation with quality problems. All resources are staffed with one operator. The first resource has a processing time of 4 minutes per unit The second resource has a processing time of 3 minutes per unit. This process suffers from a high yield loss and 50% of all products have to be scrapped after this step. The third resource also suffers from...

  • Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one ta...

    Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one takes an average of 60 minutes to paint each unit. Drying takes place in an oven that can hold up to 100 units and it takes 5 minutes to load each unit. Once all the units are loaded into the oven, it takes 6 hours to dry each load. Assume that the process is capacity constrained (so the demand rate...

  • A manager must decide which type of machine to buy, A, B, or C. Machine costs (per individual machine) are as follows:...

    A manager must decide which type of machine to buy, A, B, or C. Machine costs (per individual machine) are as follows: Machine Cost A $ 60,000 B $ 50,000 C $ 60,000 Product forecasts and processing times on the machines are as follows: PROCCESSING TIME PER UNIT (minutes) Product Annual Demand A B C 1 15,000 2 4 2 2 25,000 6 2 3 3 15,000 3 5 5 4 20,000 3 4 2 a. Assume that only purchasing...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT