Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $177,510. Estimated direct labor cost was $435,540 for 18,300 hours.
Actual costs for the most recent month are summarized
here:
Item Description | Total Cost | |
Direct labor (1,830 hours) | $ | 43,555 |
Indirect costs | ||
Indirect labor | 2,420 | |
Indirect materials | 3,420 | |
Factory rent | 3,390 | |
Factory supervision | 4,770 | |
Factory depreciation | 5,750 | |
Factory janitorial work | 1,250 | |
Factory insurance | 1,760 | |
General and administrative salaries | 4,260 | |
Selling expenses | 5,330 | |
Required:
1. Calculate the predetermined overhead rate.
2. Calculate the amount of applied manufacturing overhead.
3. Calculate actual manufacturing overhead costs.
4. Compute over- or underapplied overhead.
Predetermined Overhead rate = Estimated overhead / Estimated total labor hours = 177,510/18300 = 9.70 |
|
Applied manufacturing overhead = 9.70*1830 = 17,751 |
|
Actual manufacturing overhead = 2420+3420+3390+4770+5750+1250+1760 = 22,760 |
|
Underapplied overhead = 5009 (22760-17751) |
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $175,570. Estimated direct labor cost was $448,880 for 18,100 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,810 hours) $ 44,889 Indirect costs Indirect labor 2,590 Indirect materials 3,420 Factory rent 3,240 Factory supervision 4,750 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $175,570. Estimated direct labor cost was $448,880 for 18,100 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,810 hours) $ 44,889 Indirect costs Indirect labor 2,590 Indirect materials 3,420 Factory rent 3,240 Factory supervision 4,750 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $175,570. Estimated direct labor cost was $448,880 for 18,100 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,810 hours) $ 44,889 Indirect costs Indirect labor 2,590 Indirect materials 3,420 Factory rent 3,240 Factory supervision 4,750 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $169,260. Estimated direct labor cost was $453,180 for 18,200 hours. Actual costs for the most recent month are summarized here: Total Cost $ 45,319 Item Description Direct labor (1,820 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $171,990. Estimated direct labor cost was $455,490 for 18,900 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,890 hours) $ 45,550 Indirect costs Indirect labor 2,550 Indirect materials 3,360 Factory rent 3,390 Factory supervision 4,850 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $169,260. Estimated direct labor cost was $457,560 for 18,600 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,860 hours) $ 45,757 Indirect costs Indirect labor 2,520 Indirect materials 3,470 Factory rent 3,350 Factory supervision 4,840 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $173,810. Estimated direct labor cost was $441,210 for 19,100 hours. Actual costs for the most recent month are summarized here: Total Cost $44,122 Item Description Direct labor (1,910 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $173,880. Estimated direct labor cost was $438,480 for 18,900 hours. Actual costs for the most recent month are summarized here: Total Cost $43,849 Item Description Direct labor (1,890 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $192,910. Estimated direct labor cost was $456,490 for 19,100 hours. Actual costs for the most recent month are summarized here: Total Cost $45, 650 Item Description Direct labor (1,910 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $185,000. Estimated direct labor cost was $460,650 for 18,500 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,850 hours) $ 46,066 Indirect costs Indirect labor 2,410 Indirect materials 3,340 Factory rent 3,370 Factory supervision 4,820 Factory...