1 | |||
Predetermined overhead rate | 9.30 | per DL hour | =169260/18200 |
2 | |||
Actual direct labor hours | 1820 | ||
X Predetermined overhead rate | 9.30 | ||
Applied manufacturing overhead | 16926 | ||
3 | |||
Indirect Labor | 2500 | ||
Indirect Materials | 3400 | ||
Factory Rent | 3230 | ||
Factory Supervision | 4890 | ||
Factory Depreciation | 5720 | ||
Factory Janitorial Work | 1160 | ||
Factory Insurance | 1720 | ||
Actual manufacturing overhead costs | 22620 | ||
4 | |||
Actual manufacturing overhead costs | 22620 | ||
Less: Applied manufacturing overhead | 16926 | ||
Overhead underapplied | 5694 |
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on...
4. Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $188,160. Estimated direct labor cost was $491,960 for 19,600 hours. Actual costs for the most recent month are summarized here: $ Total Cost 49,197 Item Description Direct labor (1,960 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $177,510. Estimated direct labor cost was $435,540 for 18,300 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,830 hours) $ 43,555 Indirect costs Indirect labor 2,420 Indirect materials 3,420 Factory rent 3,390 Factory supervision 4,770 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $175,570. Estimated direct labor cost was $448,880 for 18,100 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,810 hours) $ 44,889 Indirect costs Indirect labor 2,590 Indirect materials 3,420 Factory rent 3,240 Factory supervision 4,750 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $172,040. Estimated direct labor cost was $437,580 for 18,700 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,870 hours) $ 43,759 Indirect costs Indirect labor 2,530 Indirect materials 3,340 Factory rent 3,360 Factory supervision 4,710 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $185,000. Estimated direct labor cost was $460,650 for 18,500 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,850 hours) $ 46,066 Indirect costs Indirect labor 2,410 Indirect materials 3,340 Factory rent 3,370 Factory supervision 4,820 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $175,570. Estimated direct labor cost was $448,880 for 18,100 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,810 hours) $ 44,889 Indirect costs Indirect labor 2,590 Indirect materials 3,420 Factory rent 3,240 Factory supervision 4,750 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $175,570. Estimated direct labor cost was $448,880 for 18,100 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,810 hours) $ 44,889 Indirect costs Indirect labor 2,590 Indirect materials 3,420 Factory rent 3,240 Factory supervision 4,750 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $181.240 Estimated direct labor cost was $490,530 for 19,700 hours Actual costs for the most recent month are summarized here Total Cost 49.054 hem Description Direct labor (1,970 hours) Indirect oosts Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $180,420. Estimated direct labor cost was $469,480 for 19,400 hours. Actual costs for the most recent month are summarized here: Item Description Direct labor (1,940 hours) Indirect costs Total Cost $46,949 Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $173,810. Estimated direct labor cost was $441,210 for 19,100 hours. Actual costs for the most recent month are summarized here: Total Cost $44,122 Item Description Direct labor (1,910 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...